1894 insurance building, converted, 152 residences across 16 floors.

108 Leonard Street, 10013

108 Leonard Street, facade, September 15, 2026
© NYCID, all rights reserved

108 Leonard was built in 1894 to a McKim, Mead and White design, Italian Renaissance Revival, and converted to 152 residences by Jeffrey Beers International with SLCE Architects. The clock tower is excluded from the conversion by court ruling and remains separate.

The restoration kept the ornamental work rather than stripping it. Three limestone entrances survive, and the Leonard Street lobby retains marble pillars, a double staircase and a chandelier that are themselves landmarked.

Ceiling heights run from around ten feet to more than fourteen. That is a wide spread inside one building, and it comes from a plan drawn for offices where floor to floor heights varied by storey. The window openings are the original architectural ones rather than a modern system, so they are fixed in masonry and sized to the elevation rather than to the rooms behind them.

Floors are five inch oak. The practical consequence of the whole is that room dimensions and window positions were inherited rather than designed, and every apartment resolves that differently.

Within walking distance

76 mSuperhouse · gallery
202 mTwenty First Gallery · gallery
217 mSchoelkopf Gallery · gallery
228 mR & Company · gallery
249 mGRIMM · gallery
258 m125 Newbury · gallery

Building facts

Built

1900

Last altered

2015

Floors

16

Residences

152

Landmark

Yes

New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1001707501.

Public records show 50 LAFAYETTE STREET was built in 1900 and rises 16 floors with 169 residential units (NYC MapPLUTO, version 26v2). This building is an individual landmark, designated Feb 9, 1987 by the Landmarks Preservation Commission (NYC Open Data). This lot falls within the No, designated Feb 9, 1987 by the Landmarks Preservation Commission (NYC Open Data). The Department of Buildings has 49 job filings on record for this lot (NYC Open Data).

Public record

Last altered

2015

Total units

172

Landmark

Former New York Life Insurance Building

Historic district

No

Total permits

49

NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1001707501. Violations and permits as of October 27, 2026.

9 filings in the last 24 months, 4 open violations, last filing May 2026

The record

Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.

DOB NOW filings from June 2016.

PlumbingFiled by KG SPRINKLER CORPlic. 000738Permit Issued · Apr 27, 2026 · job M01305877-S1

PLUMBING WORK IN CONJUNCTION WITH THE SUPERFICIAL RENOVATION OF APARTMENT 14E ON THE 14TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

Filed estimated cost: $15,900 (as filed, not verified)

PlumbingFiled by DONATO PLUMBING, INClic. 002426Permit Issued · Apr 27, 2026 · job M01305877-S1

PLUMBING WORK IN CONJUNCTION WITH THE SUPERFICIAL RENOVATION OF APARTMENT 14E ON THE 14TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

Filed estimated cost: $15,900 (as filed, not verified)

SprinklersFiled by KG SPRINKLER CORPlic. 000738Permit Issued · Apr 27, 2026 · job M01305877-S1

PLUMBING WORK IN CONJUNCTION WITH THE SUPERFICIAL RENOVATION OF APARTMENT 14E ON THE 14TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

Filed estimated cost: $15,900 (as filed, not verified)

General ConstructionFiled by REIS EY, INClic. 621576Permit Issued · Apr 27, 2026 · job M01305877-I1

SUPERFICIAL RENOVATION OF APARTMENT 14E ON THE 14TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

Filed estimated cost: $285,458 (as filed, not verified)

SprinklersFiled by DONATO PLUMBING, INClic. 002426Permit Issued · Apr 27, 2026 · job M01305877-S1

PLUMBING WORK IN CONJUNCTION WITH THE SUPERFICIAL RENOVATION OF APARTMENT 14E ON THE 14TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.

Filed estimated cost: $15,900 (as filed, not verified)

General ConstructionFiled by WINICK PRODUCTIONS, LLClic. 039485Permit Issued · Feb 2, 2026 · job M01354517-I1

Temporary structures for a fashion show inside the gallery. Removed at the end of the programing. No changes to existing structures, use or egress.

Filed estimated cost: $5,000 (as filed, not verified)

General ConstructionFiled by WINICK PRODUCTIONS, LLClic. 039485Permit Issued · Feb 2, 2026 · job M01354517-I1

Temporary structures for a fashion show inside the gallery. Removed at the end of the programing. No changes to existing structures, use or egress.

Filed estimated cost: $5,000 (as filed, not verified)

PlumbingFiled by VILLAGE P & H NY INClic. 001510Permit Issued · Dec 9, 2025 · job M01326358-I1

Work in PHW extension of existing natural pie inside private residence,

Filed estimated cost: $8,000 (as filed, not verified)

General ConstructionFiled by WINICK PRODUCTIONS, LLClic. 039485Signed-off · Apr 14, 2025 · job M01209773-I1

Temporary structures for a fashion show inside the gallery. Removed at the end of the programing. No changes to existing structures, use or egress.

Filed estimated cost: $5,000 (as filed, not verified)

36 earlier filings, 2017–2024
SprinklersFiled by KG SPRINKLER CORPlic. 000738Signed-off · Jun 5, 2024 · job M01036517-S4

Herewith filed for SP work for Bank Hall space

Filed estimated cost: $18,500 (as filed, not verified)

SprinklersFiled by BUCKMILLER AUTO.SPKLR.CORlic. 000115Signed-off · Jun 5, 2024 · job M01036517-S4

Herewith filed for SP work for Bank Hall space

Filed estimated cost: $18,500 (as filed, not verified)

PlumbingFiled by DONATO PLUMBING, INClic. 002426Signed-off · May 29, 2024 · job M01036517-S2

Herewith filed plumbing work for Bank Hall space

Filed estimated cost: $85,000 (as filed, not verified)

Mechanical SystemsFiled by STANLEY RUTH CO LLClic. 619140Permit Issued · May 29, 2024 · job M01036517-S3

Herewith filed mechanical work for Bank Hall space

Filed estimated cost: $330,500 (as filed, not verified)

Mechanical SystemsFiled by LIEBHABER COMPANY INClic. 004248Permit Issued · May 29, 2024 · job M01036517-S3

Herewith filed mechanical work for Bank Hall space

Filed estimated cost: $330,500 (as filed, not verified)

StructuralFiled by LIEBHABER COMPANY INClic. 004248Signed-off · May 28, 2024 · job M01036517-S1

Herewith filed Structural work for Bank Hall

Filed estimated cost: $191,800 (as filed, not verified)

General ConstructionFiled by LIEBHABER COMPANY INClic. 004248Signed-off · May 23, 2024 · job M01036517-I1

Herewith filed for an interior renovation of Bank Hall space. NEW STAIRES TO BE ADDED TO CONNECT 001 AND BAS

Filed estimated cost: $977,544 (as filed, not verified)

SprinklersFiled by FORTE EXPRESS P & H INClic. 001380Signed-off · Oct 25, 2021 · job M00576410-I1

PL/ SP work assoc. with the apt. renovation of Penthouse #15C (GC #M00462252). Work includes new PL rough & finish work, fixture removal, replacement & new installations. One SP head relocation. All work as per plans. No change in use, egress occupancy.

Filed estimated cost: $17,000 (as filed, not verified)

SprinklersFiled by FORTE EXPRESS P & H INClic. 001380Signed-off · Oct 25, 2021 · job M00576410-I1

PL/ SP work assoc. with the apt. renovation of Penthouse #15C (GC #M00462252). Work includes new PL rough & finish work, fixture removal, replacement & new installations. One SP head relocation. All work as per plans. No change in use, egress occupancy.

Filed estimated cost: $17,000 (as filed, not verified)

PlumbingFiled by FORTE EXPRESS P & H INClic. 000643Signed-off · Oct 25, 2021 · job M00576410-I1

PL/ SP work assoc. with the apt. renovation of Penthouse #15C (GC #M00462252). Work includes new PL rough & finish work, fixture removal, replacement & new installations. One SP head relocation. All work as per plans. No change in use, egress occupancy.

Filed estimated cost: $17,000 (as filed, not verified)

PlumbingFiled by FORTE EXPRESS P & H INClic. 000643Signed-off · Oct 25, 2021 · job M00576410-I1

PL/ SP work assoc. with the apt. renovation of Penthouse #15C (GC #M00462252). Work includes new PL rough & finish work, fixture removal, replacement & new installations. One SP head relocation. All work as per plans. No change in use, egress occupancy.

Filed estimated cost: $17,000 (as filed, not verified)

General ConstructionFiled by D REIS CONTRACTING CORPlic. 004062Signed-off · Oct 13, 2021 · job M00462252-I1

APARTMENT RENOVATION CONSISTING OF REARRANGEMENT OF INTERIOR PARTITIONS, DOORS AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $699,972 (as filed, not verified)

General ConstructionFiled by D REIS CONTRACTING CORPlic. 004062Signed-off · Oct 13, 2021 · job M00462252-I1

APARTMENT RENOVATION CONSISTING OF REARRANGEMENT OF INTERIOR PARTITIONS, DOORS AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $699,972 (as filed, not verified)

Sidewalk ShedFiled by ANDAMIO SCAFFOLDING LLClic. 623088Signed-off · Sep 23, 2021 · job M00599480-I1

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF

Filed estimated cost: $1,000 (as filed, not verified)

Sidewalk ShedFiled by ANDAMIO SCAFFOLDING LLClic. 623088Signed-off · Sep 23, 2021 · job M00599480-I1

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF

Filed estimated cost: $1,000 (as filed, not verified)

Sidewalk ShedFiled by ANDAMIO SCAFFOLDING LLClic. 623088Signed-off · Sep 23, 2021 · job M00599480-I1

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF

Filed estimated cost: $1,000 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Mar 17, 2021 · job M00488711-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $2,500 (as filed, not verified)

Supported ScaffoldFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Mar 12, 2020 · job M00331202-I1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Supported ScaffoldFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Mar 12, 2020 · job M00331202-I1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Supported ScaffoldFiled by ANDAMIO SCAFFOLDING LLClic. 623088Signed-off · Mar 12, 2020 · job M00331202-I1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Jul 17, 2019 · job M00195254-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $2,500 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Jul 17, 2019 · job M00195254-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $2,500 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Jul 17, 2019 · job M00195254-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $2,500 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Jul 17, 2019 · job M00195254-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $2,500 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Jul 17, 2019 · job M00195254-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $2,500 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Jan 9, 2019 · job M00117067-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $3,500 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Apr 15, 2018 · job M00034925-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $10,000 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Apr 15, 2018 · job M00034925-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $10,000 (as filed, not verified)

Supported ScaffoldFiled by S&E BRIDGE & SCAFFOLD LLClic. 037441Signed-off · Apr 15, 2018 · job M00034925-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $10,000 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Construction FenceFiled by EVEREST SCAFFOLDING INClic. 032158Signed-off · Nov 7, 2017 · job M00001996-I1

INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

5 resolved, most recent Dec 17, 2024
HPD Violation · Class ANOV SENT OUT · issued Dec 17, 2024

§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY

HPD Violation · Class CVIOLATION CLOSED · issued Sep 27, 2023 · apt 8G

§ 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 8G, 8th STORY, 2nd APARTMENT FROM NORTH AT EAST

HPD Violation · Class CVIOLATION CLOSED · issued Sep 20, 2023

§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM

HPD Violation · Class CVIOLATION CLOSED · issued Sep 20, 2023 · apt 9K

§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST LOCATED AT APT 9K, 9th STORY, 3rd APARTMENT FROM SOUTH AT WEST

HPD Violation · Class AVIOLATION DISMISSED · issued Mar 14, 2023

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.

Condo documents are recorded at unit level. Search a unit to see them.

HPD maintenance complaints

HPD · NYC Open Data

HEAT/HOT WATER — APARTMENT ONLYCLOSE · Nov 15, 2023

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

HEAT/HOT WATER — ENTIRE BUILDINGCLOSE · Sep 16, 2023

The Department of Housing Preservation and Development was not able to gain access to your apartment to inspect for a lack of heat or hot water. However, HPD was able to verify that heat or hot water was inadequate by inspecting another apartment and a violation was issued. Information about specific violations is available at www.nyc.gov/hpd.

GENERAL — COOKING GASCLOSE · Sep 16, 2023

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

UNSANITARY CONDITION — PESTSCLOSE · Aug 29, 2022

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

UNSANITARY CONDITION — PESTSCLOSE · Aug 29, 2022

The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.

11 complaints total.

HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.

Pre-2016 DOB filings

DOB legacy · NYC Open Data

18 A3 filings1993–2016
29 A2 filings1991–2017
3 A1 filings2014

DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.

DOB legacy violations

DOB BIS · NYC Open Data

LANDMK-LANDMARK NONE — V-DOB VIOLATION - ACTIVEMar 26, 2024
LANDMK-LANDMARK NONE — V-DOB VIOLATION - ACTIVEFeb 20, 2023
LANDMK-LANDMARK NONE — V-DOB VIOLATION - ACTIVEFeb 20, 2023
C-CONSTRUCTION OTHER OPTIONAL — V-DOB VIOLATION - ACTIVEOct 19, 2022

FTM EXTERIOR BLDG WALLS AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED ON EXP1,2,3 AND SPALLING AND ERODING MASONRY ON SEVERAL FLOORS AND LOCATIONS. REMEDY: REPAIR DEFECTIVE FACADE PROVIDE ADEQUATE SAFETY MEASURES MAINTAIN EXTERNAL WALLS AND APPURTENACES AS PER 1RCNY 103-04

46 resolved, most recent Aug 30, 2026
EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDJun 22, 2024

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

LANDMK-LANDMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 20, 2024
EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDApr 21, 2023

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED — V*-DOB VIOLATION - DISMISSEDApr 16, 2023

CYCLE 9B UNSAFE REPORT FILED

CIANOW CRM Violation Dismissed · disposed Feb 1, 2024

FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED — V*-DOB VIOLATION - DISMISSEDFeb 21, 2023

FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

CIANOW CRM Violation Dismissed · disposed Feb 1, 2024

LANDMK-LANDMARK NONE — V*-DOB VIOLATION - DISMISSEDFeb 20, 2023
EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDAug 20, 2022

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDJun 19, 2021

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 17, 2021

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 17, 2021

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 17, 2021

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 17, 2021

PPN203 AOC SUB 011221 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 17, 2021

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 17, 2021

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#455003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 10, 2020

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 10, 2020

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 10, 2020

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 10, 2020

PPN203 AOC SUB 011222 BY ROTAVELE ELEV INC ROBERT MCKUHAN CERT#445003 · disposed Jan 17, 2022

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDFeb 1, 2020

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDNov 1, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

LANDMK-LANDMARK NONE — V*-DOB VIOLATION - DISMISSEDOct 17, 2019
LANDMK-LANDMARK NONE — V*-DOB VIOLATION - DISMISSEDOct 17, 2019
LL2604S-SPRINKLER NONE — V*-DOB VIOLATION - DISMISSEDSep 2, 2019

FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019

CAW FULL DEMOLITION (CAW) · disposed Nov 12, 2019

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDAug 1, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDMay 19, 2019

FAILURE TO PERFORM CATEGORY 5 INSPECTION

CAT 5 EBN#2422/15 SO/05/15/16.ISTALL CONTROL M00171446-I1 6/6/14 "1P1940" REMO · disposed Jun 12, 2019

EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDMay 19, 2019

FAILURE TO PERFORM CATEGORY 5 INSPECTION

CAT 5 EBN#2414/15 SO/05/15/16.ISTALL CONTROL M00171446-I1 6/6/14 "1P1941" REM · disposed Jun 12, 2019

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 1, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CIANOW CRM Violation Dismissed · disposed Aug 30, 2026

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 26, 2019

PPN203 EBN 2422/15/SO/091516#2676 · disposed Jun 12, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 26, 2019

PPN203 EBN 2422/15/SO/091516#2676 · disposed Jun 12, 2019

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDFeb 15, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PD INV#62077778 · disposed Apr 15, 2019

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDFeb 27, 2018

VIOLATION COMPLIED WITH · disposed Mar 4, 2018

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDFeb 27, 2018

VIOLATION COMPLIED WITH · disposed Mar 4, 2018

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDFeb 20, 2018

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Aug 9, 2018

FISP-FACADE SAFETY PROGRAM FACADE REQUIRED — V*-DOB VIOLATION - DISMISSEDFeb 20, 2018

CIANOW CRM Violation Dismissed · disposed Feb 1, 2024

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

ACC1 EBN 1903/16SO/012918#2766 · disposed Apr 10, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDDec 26, 2017

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Apr 12, 2018

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDDec 26, 2017

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DOWNGRADED TO CLASS 2 OR 3 · disposed Apr 12, 2018

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJun 13, 2017

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

PAID 13239110 · disposed Jul 20, 2017

C-CONSTRUCTION OTHER OPTIONAL — VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSEDMay 14, 2017

VIOL HAS BEEN COMPLIED WITH · disposed May 16, 2017

DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.

ECB violations

Environmental Control Board · NYC Open Data

50 resolved, most recent Jul 30, 2023
Construction — CLASS - 1RESOLVE · Jul 30, 2023

AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE #1 WITH INOPERABLE LIGHT BULBS UNDERSIDE THE SHED TO BRING ILLUMINATION FAILURE TO PROVIDE LIGHTING CREATES UNSAFE AND MUGGING CONDITION TO

Penalty: $2,400 · paid: $2,400

Elevators — CLASS - 2RESOLVE · Jul 18, 2023

VF. COMMUNICATION DEFECTIVE REPAIR.

Elevators — CLASS - 2RESOLVE · Jul 11, 2023

2/X/10 OUT SIDE COMM INOPERATIVE REPAIR.

Penalty: $312 · paid: $312

Construction — CLASS - 2RESOLVE · Mar 10, 2021

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS-SUPPORTED SCAFFOLD.NOTED:AT TIME OF INSPECTION OF A 16 STORY ALTERATION ACTIVE JOBSITE.I OBSERVED SUPPORTED SCAFFOLD IN PLACE

Construction — CLASS - 2RESOLVE · Mar 10, 2021

PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION(SWS)SIDEWALK SHED NOT MAINTAINED.NOTED:AT TIME OF INSPECTION OF A 16 STORY ALTERATION1 ACTIVE JOBSITE,I OBSERVED SIDEWALK SHED INSTALLED AND IN PLACE AT EX

Penalty: $2,400 · paid: $2,408

Construction — CLASS - 2RESOLVE · Jun 15, 2020

REMOVAL OF PUBLIC PROTECTION FROM UNSAFE FACADE WITHOUT BUILDING DEPARTMENT APPROVAL.NOTE:EXPOSURE 4,WEST ELEVATION AND NORTH WEST CORNER HAVE SIDEWALK SHED PROTECTION REMOVED WITHOUT DEPT. APPROVAL.REMEDY:COMP

Penalty: $625 · paid: $635

Local Law — CLASS - 2RESOLVE · Jun 2, 2020

FAILURE TO FILE ACCEPTED AMENDED CYCLE 6,7B & 8B REPORT INDICATES CORRECTION OF UNSAFE CONDITION DESCRIBED IN INTIAL FACADES REPORT REQUIREDBY 28-302.5 FOR CONTROL#800376. AGG1 PRIOR NOV 37012171N UNDER 28-302.

Penalty: $3,125 · paid: $3,183

Construction — CLASS - 1RESOLVE · Apr 30, 2020

BC 3301.2 27-1009(A) FAILURE TO MAINTAIN SIDEWALK SHED LIGHTING OBSERVED 5 LIGHT BULBS NOT LIT ON CATHERINE LANE AND 1(ONE)BULB OUT ON LAFAYETTE STREET.THIS CREATES A DARKENED PASSAGEWAY FOR PEDESTRIANS.REM:REP

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 2RESOLVE · Apr 30, 2020

HIGH VISIBILITY AT ENTRANCE TO CATHERINE LANE FROM BROADWAY.FAILED TO PROVIDE EITHER HIGH VISIBILITY TAPE OR REFLECTIVE PAINT AT ENTRANCE TO CATHERINE LANE FROM BROADWAY.SIDEWALK SHED ERECTED WITH NON COMPLIANC

Penalty: $1,250 · paid: $1,250

Site Safety — CLASS - 1RESOLVE · Apr 28, 2020

DESIGN DRAWING FOR SUPPORTED SCAFFOLD IN STAIRWAY. OBSERVED IN STAIR B1 BETWEEN 14TH & 15TH FLOOR A SUPPORTED SCAFFOLD HAD BEEN ERECTED. WHEN I REQUESTED A DESIGN DRAWING,NONE WAS PROVIDED. THE SCAFFOLD ERECTED

Penalty: $1,250 · paid: $1,254

Construction — CLASS - 1RESOLVE · Apr 28, 2020

UNSAFE & UNSTABLE HANDRAIL AT ROOF LEVEL. AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL,STAIRS AT EXTERIOR. LEADING TO TOP OF BULKHEAD W/HANDRAILS THAT WERE RICKETY & NOT SECURLY BUILT. HANDRAIL WAS ALSO AT INCO

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Apr 28, 2020

SEC. BC 1011.1 EXIT SIGNS. PARTIALLY OCCUPIED HIGH RISE,I OBSERRVED INOCCUPIED CURRENTLY UNDER CONSTRUCTION AREA,THAT EXIT SIGNS WERE MISSING ON MOST OF THE UPPER FLOORS & AT 1ST FL CONSTRUCTION AREA EXIT SIGNS

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Apr 28, 2020

SEC. 3303.72 FIRE EXTINGUISHERS. OBSERVED FIRE EXTINGUISHERS NOT HUNG AS REQUIRED OR MISSING,& HOLDING OPEN FIRE DOORS THROUGHOUT BLDG. THISIS A PARTIALLY OCCUPIED BLDG & COULD BE DISASTROUS IN THE EVENT OF A

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 2RESOLVE · Nov 14, 2019

A.C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1, 2019, IN AN OFFICE BUILDIN

Unknown — CLASS - 1RESOLVE · Nov 7, 2019

PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE PRE SHIFT SAFETY MEETING. AT THE TIME OF INSPECTION IN RESPONSE TO A COMPLAINT WHERE IT WAS REPORTED THAT WORKER DROPPED SHEETROCK ON HIS FOOT. INSPECTION REVEAL T

Penalty: $5,000 · paid: $5,000

Unknown — CLASS - 1RESOLVE · Nov 7, 2019

PERMIT HOLDER FAILED TO ENSURE WORKER RECEIVE SITE SFATYE ORINTETAION AT THE TIME FO INSPECTION RESPODNING TO A COMPLAINT WHERE IT WAS REPORTED THAT WROKER (OSCAR UMANA) DROPPED SHEETROCK ON HIS FOOT INSPECTION

Penalty: $5,000 · paid: $5,000

Construction — CLASS - 1RESOLVE · May 16, 2019

FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPERATIONS @THE TIME OF MY INSPECTION I OBSERVED UNNFENCED BARRIERS IN PLACE AROUND THE HOIST ENTRANCE @ THE EXTERIOR OF THE BUILDING EXP 1. CHAIN

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 1RESOLVE · May 16, 2019

FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. @THE TIME OF MY INSPECTION I OBSERVED THE 14TH & 13TH FL LVL HOUSEKEEPING WAS NOT BEING MAINTAINED THERE WAS GARBAGE/MATERIALS/DEBRIS DISORDER

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · May 16, 2019

FAILURE TO INSTITUTE MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONST @THE TIME OF INSPECTION I OBSERVED THE GUARDRAIL IN PLACE ON THE 13TH FLOOR LVL @THE ELEVATOR SHAFT WAS INADEQUATE. THE RE WAS OPENINGS ON

Penalty: $2,500 · paid: $2,500

Unknown — CLASS - 1RESOLVE · May 14, 2019

PERMIT HOLDER FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC 3321.1. OBSERVED WORKER MEJIA FERNANDEZ AT THE BUILDING SITE FOR WHICH A CONSTRUCTION

Penalty: $1,250 · paid: $1,250

Unknown — CLASS - 1RESOLVE · May 14, 2019

OWNER FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC 3321.1. OBSERVED WORKER MEJIA FERNANDEZ AT THE BUILDING SITE FOR WHICH A CONSTRUCTION SUPERINT

Construction — CLASS - 2RESOLVE · Dec 2, 2018

FAILURE TO INSTITUTE SAFETY MEASURES OF A CONSTRUCTION SITE WORKER FELL APPRX 7FT FROM WORKING PLATFORM AT STAIRS AT 3STORY WORKER HAD HARNESS ON BUT WAS NOT TIED OFF TO ANY FALL ARREST SYSTEM FALL ARREST SYSTE

Penalty: $5,000 · paid: $5,000

Construction — CLASS - 1RESOLVE · Dec 2, 2018

FAILURE TO SAFEGUARD PUBLIC AND PROPERTY. WORKER FELL APPRX 7'WHILE INSTALLING CONCRETE FROM PANELS/FRAMEWORK, AT AN INTERIOR STAIRS, IT WAS REPORTED BY SSM DOUGLAS RIBARDO AND WITNESS FABIO GALEAS THAT THE

Penalty: $10,000 · paid: $10,000

Local Law — CLASS - 2RESOLVE · Jul 31, 2018

FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECT-ION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIREDBY 28-302.5 FOR CONTROL # 800376. REMEDY: FILE ACCEPTABLE REPORT

Penalty: $1,250 · paid: $1,250

Construction — CLASS - 1RESOLVE · Jul 11, 2018

BC 3301.1.2 FIRE CODE-GENERAL @TIME OF INSP OBSERVED GRINDING OPS & SPARKS WERE FLYING & HITTING ANOTHER WORKER ON HIS BACK.OBSERVED WELDINGOPS BEING PERFORMED ADJACENT TO PLYWIID W/NO PROTECTION PROVIDED TO PR

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jul 11, 2018

WORK DOES NOT CONFORM TO APPROVED PLANS.@TIME OF INSP OBSERVED PLATFORM DRAWINGS PROVIDED.OBSERVED 31/2" X 4" ANGLE IN USE @PLATFORM & NO USE OF CONTINUOUS 4' X 4' ANGLE AS DESCRIBED IN DRAWING THAT WAS PROVIDE

Penalty: $625 · paid: $625

Construction — CLASS - 1RESOLVE · Jul 11, 2018

EQUIPMENT USEDD CONTRARY TO MANUFACTURER SPECS.@TIME OF INSP NOTED INSTALLED FIBER GLASS LADDER W/TOP RUNG/STEP COMPROMISED (BENT & CRIMPED).THIS CONDITION(POTENTIALY)CREATES A HAZARD FOR PERMANENT INJURY OR DE

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jun 3, 2018

FAILURE TO MAINTAIN SAFE OPS WHILE I WAS RESPONDING TO THE INCIDENT COMPLAINT #1480776, I WAS TOLD BY THE SITE SAFETY MANAGER MR.RIBAUDO THAT THE PIPE THAT FELL ON MR.OMEALLY FINGERS FELL WHILE HE & HIS PARTNER

Construction — CLASS - 2RESOLVE · Apr 12, 2018

FAILURE TO COMPLY W/COMM'S ORDER CONTAINED IN SUMM/VIO#35309235H ISS'D ON 03/09/18 AND TO FILE A COFC PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION

Construction — CLASS - 1RESOLVE · Mar 8, 2018

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.NOTED:AT 10TH FLOOR INTERIOR,FIRE OCCUPIED CAUSING FIRE DAMAGE TO SHANTY AND SURROUNDING AREA CREATING A HAZARDOUS CONDITION WHIC

Penalty: $5,000 · paid: $5,012

Construction — CLASS - 1RESOLVE · Mar 8, 2018

SEC. 3314.4.4.5 SUPPORTED SCAFFOLD NETTING. AT TIME OF INSPECTION ON A JOBSITE UNDER A SWO DUE TO A FIRE 3-9-18 AT 1AM,OBSERVED THAT SUPPORTED SCAFFOLD NETTING AT EXP#2 & 3 NETTING WAS DAMAGED & RIPPED DUE TO

Penalty: $625 · paid: $625

Construction — CLASS - 1RESOLVE · Mar 8, 2018

SEC. 3301.7 DESIGN DRAWINGS FOR MAKE SHIFT DESIGN EYE(STEEL LIFTING)ATTIME OF INSPECTION ON A JOBSITE UNDER A SWO DUE TO A FIRE ON 3-9-18 AT1AM,OBSERVED I-BEAMS LIFTED IN (PRE) AIR BY STEEL(CONCRETE)ATTACHED TO

Penalty: $625 · paid: $625

Construction — CLASS - 1RESOLVE · Mar 8, 2018

HOUSEKEEPING. AT TIME OF INSPECTION ON A JOBSITE UNDER A SWO DUE TO A FIRE ON 3-9-18 AT 1AM,OBSERVED LARGE AMOUNTS OF STEEL & I-BEAMS THROUGHOUT THE JOBSITE. LARGE AMOUNTS OF STEEL CREATES A TRIP & FALL HAZARD.

Penalty: $625 · paid: $625

Construction — CLASS - 1RESOLVE · Mar 8, 2018

GUARDRAILS(INADEQUATE)AT TIME OF INSPECTION ON A JOBSITE UNDER A SWO DUE TO A FIRE ON 3-9-18 AT 1AM,OBSERVED INADEQUATE GUARDRAILS THROUGHOUT JOBSITE AT ALL INTERIOR,GUARDRAILS SYSTEM NOT FULLY STRETCHED,ZERO

Penalty: $6,250 · paid: $6,250

Construction — CLASS - 1RESOLVE · Mar 8, 2018

UNSAFE STORAGE OF COMBUSTIBLES. AT TIME OF INSPECTION ON A JOBSITE UNDER A SWO DUE TO A FIRE ON 3-8-18 AT 1AM OBSERVED LPS TANKS CHAINED TO A (SANG BOX),LAYING ON A FLOOR NEXT TO SHANTYS/SHED/OFFICE,ALSO OBSERV

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Mar 8, 2018

3303.4 HOLES ON THE FLOOR(LARGER THAN 2 INCHES). AT TIME OF INSPECTIONON A JOBSITE UNDER A SWO DUE TO A FIRE ON 3/9/18 AT 1:00 AM OBSERVED LARGE HOLES APPROX 6 INCHES WIDE BY 25 FEET LONG AT THE EDGE OF SLAB

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Feb 27, 2018

SEC: 3307.6.5.8. SUPPORTED SCAFFOLD (INSTALLATION INSP) 6 MONTH INSP. @ TIME OF INSP ON AN ACTIVE JOBSITE OF 16 STORY BLDG UNDER ALTERATION, OBSERVED SUPPORTED SCAFFOLD @ ALL EXPOSURES. UPON REQUEST FOR THE 6 M

Penalty: $1,600 · paid: $1,600

Construction — CLASS - 1RESOLVE · Feb 27, 2018

SEC: 3301.7. DESIGN DRAWINGS FOR PLATFORM (LOAD CAPACITY). @ TIME OF INSP ON AN ACTIVE JOBSITE OF A 16 STORY BLDG UNDER ALTERATION, OBSERVED WORKERS WORKING ON TOP A HARDWARE PLATFORM ON TOP OF DECKING & JUNIOR

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · Feb 27, 2018

GUARDRAILS (INADEQUATE). @ TIME OF INSP ON AN ACTIVE JOBSITE OF 16 STORY BLDG UNDER ALTERATION OBSERVED INADEQUATE GUARDRAILS THROUGHOUT THE JOBSITE @ DIFFERENT LOCATIONS IMPROPER GUARDRAILS CREATES A HAZARD FO

Penalty: $1,200 · paid: $1,200

Construction — CLASS - 1RESOLVE · Jul 31, 2017

100Q03;100D06:

Construction — CLASS - 1RESOLVE · Jul 30, 2017

3318.3-100M5)FAILURE TO SUBMIT A STATEMENT ON A DEPARTMENT FORM TO THE ELEVATOR DIVISION CERTIFIYING A TEST HAS BEEN CONDUCTED AND THE RESULTS THERE OF WERE SUBMITTED WITHIN 24 HRS OF TEST BEING PERFORMED AS PE

Penalty: $800 · paid: $800

Construction — CLASS - 1RESOLVE · Jul 30, 2017

3318.3-100M5)FAILURE TO NOTIFY OF A CATHEAD RAISE. THE TRAVEL OF THE HOIST IS INCREASED OR DECREASED AS PER ANSI A10.4 SECTION 26 AS MODIFIED BY RS18.7

Construction — CLASS - 3RESOLVE · May 14, 2017

WORK WITHOUT A PERMTI.ALT 1 PERMIT 121185831 ISSUED TO COVERT BUILDING TO RESIDENTIAL EXPIRED ON 5/14/17.WORKERS OBSERVED WORKING THROUGH-OUT BUILDING.AS PER (SSM) APPROXIMATELY 140 WORKERS IN BLDG AT TIME OF

Penalty: $100 · paid: $100

Construction — CLASS - 1RESOLVE · May 7, 2017

FAILURE TO SAFEGUARD PUBLIC PROPERTY IN RESPONSE TO AN INCIDENT WHERE IT WAS REPORTED THAT A MECHINCAL BOBCAR HAD HIT A PASSENGER CAR THAT WAS DRIVING PAST THE SITE THE BOBCAT HAD NOT FULLY STOPPED INSIDE THE Y

Penalty: $25,000 · paid: $25,000

Construction — CLASS - 1RESOLVE · Mar 20, 2017

REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION OR DEMOLITION WORK ON ALL FLRS AND CELLAR PARTIALLY COMPLETED AND WASTE REMOVED,I OBSERVED THAT THE EGRESS FROM FLRS 6-5 WAS INADEQU

Penalty: $1,600 · paid: $1,600

Construction — CLASS - 2RESOLVE · Mar 20, 2017

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION/DEMOLITION OPERATION.NOTE:AT THE TIME OF MY INSPECTION OF A (16)STORYBUILDING AT DEMOLITION STAGE ON THE INTERIOR,WORK IN PROGRESS ON ENTIR

Penalty: $5,000 · paid: $5,000

Construction — CLASS - 1RESOLVE · Aug 1, 2016

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.ALT(1)PERMIT CONVERT BLDG TO RESIDENTIAL. SITE SAFETY PLAN STATES FLRS 1-4 MUST HAVE (FIRE) RATED PARTITION,NOT COMPLETED TO P

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 2RESOLVE · Jul 27, 2016

SEC: 3301.1.2. FAILURE TO COMPLY W/ NYC FIRE CODE-GENERAL- NO FIRE WATCH, FIRE GUARD, CERTIFICATE OF FITNESS. NOTE: @ TIME OF INSP OF A 13 STORY ALTERATION JOB, CONSTRUCTION WORK IN PROGRESS. I OBSERVED WELDING

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · Jul 27, 2016

FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: @ TIME OF MY INSP RESPONDING TO COMPLIANT# 1429441 WHERE IT WAS REPORTED A PIECE OF BRACE SLIPPED OUT OF WORKERS HAND ONTO

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 1RESOLVE · Jul 11, 2016

3310.8-SITE SAFETY MANAGER RESPONSIBILTY.NOTED:EXCAVATOR WAS USED IN THE CELLAR ALONG WITH OTHER HEAVY EQUIPMENT(BOBCAT)CONTRARY TO APPROVED SITE SAFETY PLAN,SITE SAFETY MANAGER DOUGLAS RIBAUDO FALLED TO LOG

Penalty: $1,600 · paid: $1,600

ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.

Certificates of occupancy

DOB · NYC Open Data

TemporaryIssued · Mar 25, 2021 · DOB Legacy
25 earlier certificates
TemporaryIssued · Jan 24, 2021 · DOB Legacy
TemporaryIssued · Oct 26, 2020 · DOB Legacy
TemporaryIssued · Sep 15, 2020 · DOB Legacy
TemporaryIssued · Aug 31, 2020 · DOB Legacy
TemporaryIssued · Jun 28, 2020 · DOB Legacy
Renewal With Change167 dwelling unitsCO Issued · Dec 7, 2022 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Nov 15, 2024 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Nov 14, 2025 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Oct 24, 2023 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Oct 16, 2026 · DOB NOW
Renewal With Change167 dwelling unitsCO Issued · Aug 29, 2024 · DOB NOW
Renewal With Change167 dwelling unitsCO Issued · Aug 17, 2022 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Jul 30, 2026 · DOB NOW
Renewal With Change167 dwelling unitsCO Issued · Jul 28, 2023 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Jul 22, 2025 · DOB NOW
Renewal With Change167 dwelling unitsCO Issued · Jun 30, 2022 · DOB NOW
Renewal With Change167 dwelling unitsCO Issued · Jun 14, 2023 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · May 31, 2022 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · May 5, 2026 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · May 1, 2025 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Apr 5, 2024 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Mar 10, 2023 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Feb 11, 2026 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Feb 5, 2025 · DOB NOW
Renewal Without Change167 dwelling unitsCO Issued · Jan 16, 2024 · DOB NOW

DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.

What are you trying to do here?

Public records for 50 LAFAYETTE STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.