111 Murray Street was designed by Kohn Pedersen Fox, 64 storeys and 157 residences in Tribeca. The tower is sheathed entirely in glass, with curved panels turning the northwest and southeast corners, and it flares gently outward from about the fortieth floor up to a sculpted crown.
The structural move is at the corners. They are column free, so the curved floor to ceiling glass runs continuously around them and a corner room has no post interrupting the turn. The flare above the fortieth floor widens the upper plates past the neighbouring roofs.
Two consequences follow indoors. A corner is glass on both sides with nothing solid at the junction, which is the best light in the building and the least usable wall, so a corner room is planned around a perimeter with nothing to build against. And because the flare widens the plate as it rises, plans differ between the lower and upper parts of the tower rather than repeating, and a layout drawn for one does not carry to the other.
Within walking distance
Building facts
Built
2016
Floors
64
Residences
157
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1001427503.
Public records show 111 MURRAY STREET was built in 2016 and rises 63 floors with 157 residential units (NYC MapPLUTO, version 26v2). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
160
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1001427503. Violations and permits as of October 27, 2026.
12 filings in the last 24 months, 1 open violation, last filing Apr 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED (300psf & 600psf AS PER PLANS). SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $18,000 (as filed, not verified)
INSTALL (1) NEW GAS FIRED DIRECT VENT FIREPLACE WITH DOUBLEWALL FLUE AND HORIZONTAL POWERVENT IN CONJUNCTION WITH NB 122132110. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Filed estimated cost: $56,000 (as filed, not verified)
Interior renovation of apt 50W.
Filed estimated cost: $400,005 (as filed, not verified)
SPRINKLER SCOPE AT 59TH FLOOR (MARKETING PH1) PER PLANS FILED HEREWITH
Filed estimated cost: $130,000 (as filed, not verified)
General construction work associated with the renovation of an existing 45th floor apartment including reconfiguration of partitions and associated finishes. No change to use egress or occupancy.
Filed estimated cost: $400,520 (as filed, not verified)
PLUMBING SCOPE AT 59TH FLOOR (MARKETING PH1) PER PLANS FILED HEREWITH
Filed estimated cost: $400,000 (as filed, not verified)
HVAC/ MECHANICAL SCOPE AT 59TH FLOOR (MARKETING PH1) PER PLANS FILED HEREWITH
Filed estimated cost: $500,000 (as filed, not verified)
HVAC/ MECHANICAL SCOPE AT 59TH FLOOR (MARKETING PH1) PER PLANS FILED HEREWITH
Filed estimated cost: $500,000 (as filed, not verified)
FACADE ALTERATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
Filed estimated cost: $200,000 (as filed, not verified)
INTERIOR RENOVATION OF PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
Filed estimated cost: $2,500,000 (as filed, not verified)
INTERIOR RENOVATION OF PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
Filed estimated cost: $2,500,000 (as filed, not verified)
Adding riser diagram.
Filed estimated cost: $14,000 (as filed, not verified)
Minor partition change in closet, changes to some of the soffits, addition of small drops in the ceiling in certain areas to accommodate lights and sprinkler heads, add door systems to separate Kitchen and Living Room. No change to Occupancy use or egress
Filed estimated cost: $210,000 (as filed, not verified)
Minor partition change in closet, changes to some of the soffits, addition of small drops in the ceiling in certain areas to accommodate lights and sprinkler heads, add door systems to separate Kitchen and Living Room. No change to Occupancy use or egress
Filed estimated cost: $210,000 (as filed, not verified)
Interior demo and installation of partitions & finishes on the ground floor of the existing Retail 1 and 2 spaces as per plans. No change of use, egress, or occupancy.
Filed estimated cost: $109,760 (as filed, not verified)
Interior demo and installation of partitions & finishes on the ground floor of the existing Retail 1 and 2 spaces as per plans. No change of use, egress, or occupancy.
Filed estimated cost: $109,760 (as filed, not verified)
INSTALL (1) NEW GAS FIRED DIRECT VENT FIREPLACE WITH DOUBLEWALL FLUE, AND HORIZONTAL POWERVENT IN CONJUCTION WITH NB #122132110. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Filed estimated cost: $68,000 (as filed, not verified)
Mechanical work on the ground floor of the existing Retail 1 and 2 spaces including the install of a new ventilation system. No change of use, egress, or occupancy.
Filed estimated cost: $68,000 (as filed, not verified)
Plumbing work on the ground floor of the existing Retail 1 and 2 spaces including the install of new grease traps as per plans. No change in use, egress or occupancy.
Filed estimated cost: $52,000 (as filed, not verified)
MODIFICATION OF EXISITNG SPRINKLER SYSTEM ON 1ST FLOOR OF RETAIL 1 AND 2 SPACES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $20,700 (as filed, not verified)
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $10,000 (as filed, not verified)
INTERIOR RENOVATION OF PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHNAGE TO USE, EGRESS NOR OCCUPANCY.
Filed estimated cost: $802,500 (as filed, not verified)
SPRINKLER SCOPE ASSOCIATED WITH PENTHOUSE RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $90,000 (as filed, not verified)
SPRINKLER SCOPE ASSOCIATED WITH PENTHOUSE RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $90,000 (as filed, not verified)
CONDOMINIUM RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Filed estimated cost: $300,000 (as filed, not verified)
PLUMBING WORK ASSOCIATED WITH PENTHOUSE RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $200,000 (as filed, not verified)
PLUMBING WORK ASSOCIATED WITH PENTHOUSE RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $200,000 (as filed, not verified)
MECHANICAL WORK ASSOCIATED WITH CONDOMINIUM RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $400,000 (as filed, not verified)
MECHANICAL WORK ASSOCIATED WITH CONDOMINIUM RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $400,000 (as filed, not verified)
MECHANICAL WORK ASSOCIATED WITH CONDOMINIUM RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $400,000 (as filed, not verified)
MECHANICAL WORK ASSOCIATED WITH CONDOMINIUM RENOVATION AS PER PLANS FILED HEREWITH.
Filed estimated cost: $400,000 (as filed, not verified)
INTERIOR RENOVATION AT UNIT 8W, TO INCLUDE NEW GYPSUM WALLBOARD CEILING IN 3 BEDROOMS AS PER PLANS HEREWITH. NO STRUCTURAL WORK, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $12,000 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $50,000 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $50,000 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $50,000 (as filed, not verified)
Install illuminated non-advertising business accessory sign on the wall.
Filed estimated cost: $1,050 (as filed, not verified)
Plumbing work as shown on plans
Filed estimated cost: $4,408 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
(ONE SEED) modification to sprinkler and plumbing fixtures/piping as per plans
Filed estimated cost: $59,994 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
HPD conducted an inspection of this complaint. The conditions observed by the inspector did not violate the housing laws enforced by HPD. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 27, 2026
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 27, 2026
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 27, 2026
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 27, 2026
PPN203 AOC SUB ON 122420 BY THYSSENKRUPP ELEVATCERT#083061 THOMAS BALLATO · disposed Mar 25, 2021
PPN203 AOC SUB ON 122420 BY THYSSENKRUPP ELEVATCERT#083061 THOMAS BALLATO · disposed Mar 25, 2021
PPN203 AOC SUB ON 122420 BY THYSSENKRUPP ELEVATCERT#083061 THOMAS BALLATO · disposed Mar 25, 2021
PPN203 AOC SUB ON 122420 BY THYSSENKRUPP ELEVATCERT#083061 THOMAS BALLATO · disposed Mar 25, 2021
PPN203 AOC SUB ON 122420 BY THYSSENKRUPP ELEVATCERT#083061 THOMAS BALLATO · disposed Mar 25, 2021
PPN203 AOC SUB ON 122420 BY THYSSENKRUPP ELEVATCERT#083061 THOMAS BALLATO · disposed Mar 25, 2021
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPM INVOICE#62109146 · disposed Aug 25, 2019
FAILURE TO PERFORM CATEGORY 5 INSPECTION
EVCAT5 DEMO#122055079SO 7/2/15 · disposed Jun 10, 2019
FAILURE TO PERFORM CATEGORY 5 INSPECTION
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
FAILURE TO PERFORM CATEGORY 5 INSPECTION
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
PPN203 DM#122055079 S/O7/2/15 · disposed Jun 18, 2019
PPN203 AOC SUB ON 01/28/19 BY:THYSSENKRUPP JOHN DIORIO, CERT#083046 · disposed Jan 31, 2019
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Feb 6, 2018
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CIALCA DEMO#122055079 S/O 07/02/2015 · disposed Dec 17, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT 1 DEMO#122055079 S/O 07/02/2015 · disposed Dec 17, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CIALCA DEMO#122055079 S/O 07/02/2015 · disposed Dec 17, 2017
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Feb 6, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13267181 · disposed Mar 8, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13359673 · disposed Apr 23, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13359670 · disposed Apr 23, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13359686 · disposed Apr 23, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13254589 · disposed Aug 14, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 43346687+ · disposed Apr 23, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13254589 · disposed Feb 4, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DDY 13267176 · disposed Sep 10, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13254593 · disposed Aug 20, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13254586 · disposed Aug 14, 2017
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed May 30, 2017
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed May 30, 2017
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Feb 6, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13181033 · disposed Mar 21, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13359675 · disposed Apr 23, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13156385 · disposed Mar 8, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13145808 · disposed Jan 11, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13145812 · disposed Jan 11, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13346683 · disposed Mar 8, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13346685 · disposed Mar 8, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13152167 · disposed Jan 23, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13346687 · disposed Mar 8, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13346680 · disposed Mar 8, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13346681 · disposed Mar 8, 2018
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
IN SERVICE ENTRY HALLWAY, LARGE WOODEN CRATE PARTIALLY OBSTRUCTS EXIT PASSAGEWAY., REMOVE OBSTRUCTION
Penalty: $2,500 · balance due: $2,500
CLASS 2: PIT SUMP PUMP INOPERATIVE. REPAIR PUMP AND REMOVE WATER FROM THE PIT
Penalty: $310 · paid: $310
AS PER DCP AGENCY RECORDS, AMENITIES AT THE POPS SITE IS TO INCLUDE (60) MOVABLE CHAIRS. AT TIME OF INSPECTION, NO MOVABLE CHAIRS WERE OBSERVED., COMPLY WITH ZR
Penalty: $5,000 · paid: $5,000
5A10,99M7,57BB7. 5A10-CEASE USE ITEM DOOR ZONE RESTRICTOR HAS BEEN TAMPERED WITH DISABLED AND RENDERED INOPERATIVE. THIS IS A SAFETY DEVICE TO ENSURE ELEVATOR PASSENGERS SAFETY REPAIR RESTRICTOR AND CONTACT
Penalty: $1,250 · paid: $1,317
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.NOTE:AT TIME OF MY INSPECTION OF A 62 STORY BUILDING AT ROOF LEVEL CONSTRUCTION WORK IN PROGRESS.I OBSERVED SUSPENDED TRIGGER
Penalty: $2,500 · paid: $2,500
PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLD IN CONJUNCTION W/ DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB. FAILURE TO SAFE GUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. NOTE: @ TIME OF INSP
Penalty: $25,000 · paid: $25,000
SEC: BC 3314.4.3.2. PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLD IN CONJUNCTION W/ DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB. NOTE: @ TIME OF INSP OBSERVED SUSPENDED SCAFFOLD IN PLACE W/ DAVIT SYSTEM & IN US
SEC. 1RCNY 104-20 PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLDS IN CONJUNCTION W/DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB/WORK. NOTE: AT TIME OF INSPECTION OBSERVED NO RIGGER IN PLACE/NOT ON FILE.
PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLDS IN CONJUNTION W/DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB. NOTE: AT TIME OF INSPECTION OBSERVED SUSPENDED SCAFFOLD IN CONJUNTION W/DAVIT SYSTEM IN PLACE W/NO NOT
PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLDS IN CONJUNCTION W/DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB. FAILURE TO SAFEGUARD ALL PERSON& PROPERTY AFFECTED BY CONSTRUCTION OPERATION. NOTE: AT TIME OF INSPEC
SEC: BC 3314.1. PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLDS IN CONJUNCTION W/ DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB. NOTE: @ TIME OF INSP UPON FURTHER REVIEW OF SUSPENDED SCAFFOLD IN CONJUNCTION W/ DAV
PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLDS IN CONJUNCTION W/ DAVIT SYSTEM & EXTERIOR WALLS & FACADE JOB. NOTE: @ TIME OF INSP OBSERVED SUSPENDED SCAFFOLD W/ DAVIT SYSTEM IN PLACE. FAILURE TO PROVIDE A DAIL
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35264048X ISSUED ON 11/05/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WHILE LIFTING A GLASS PA
Penalty: $800 · paid: $800
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.NOTED WHILE LIFTING A GLASS PANEL APPROX 5'X12'X6"UP TO THE60 FL WITH THE TOWER CRANE,THE PANEL SWING CLIPPING THE SIDE OF THE ST
Penalty: $25,000 · paid: $25,000
SEC. 3303.12.2 ELEVATORS & HOISTS DURING CONSTRUCITON OR DEMOLITION ATTIME OF INSPECTION TO INCIDENT #24647. I OBSERVED A SET OF WHEELS FROM THE LEFT SIFE CAR ON THE NORTH SIDE OF THE BLDG HAS FALLEN OFF DUE TO
Penalty: $1,600 · paid: $1,600
OPERATION OF CRANE W/OUT A CERTIFICATE OF ON SITE INSP. TOWER CRANE CN# 1013/15 CD# 4818 WHILE PERFORMING AUDIT INSP ON 5/30/17 ON THE ABOVE TOWER CRANE. I DISCOVERED THAT THIS CRONE WAS IN OPERATION W/ AN EXPI
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.AT TIME OF MY INSPECITON OF A 62 STORY CONSTRUCTION BLDG,I OBSERVED AT ADJ PROPERTY GREASE SPREAD ALL OVER THE BALCONIES.THE GREA
Penalty: $5,000 · paid: $5,000
FAILURE TO SAFEGUARD.AT TIME OF INSPECTION OF AN INCIDENT OBSERVED THAT NORTHWEST HOIST BETWEEN FLOORS 52&53 HAD BEEN STRUCK BY SUPPORT POLE FOR HORIZONTAL NETTING ON THE WEST SIDE OF THE CAR CAUSING DAMAGE TO
Penalty: $10,000 · paid: $10,000
CU-05I10 SAFETY NOT SUPPORT POLE EXTENDED OVER TO DEVICE AND WAS CAUGHT ON HOIST SIDE GATE/DAMAGED/REPAIR. CALL FOR REINSPECTION 212-393-2435.
Penalty: $10,000 · paid: $10,000
SEC. 3301.2 FAILURE TO MAINTAIN. DURING INSPECTION OBSERVED THAT THE WOOD LADDERS USED TO ACCEND & DESCEND BETWEEN FLOORS WERE IN DISREPAIR CONSISTING OF LOOSE RUNGS,SPLIT & BROKEN RAILS,ABOVE 57TH STY. STOP AL
Penalty: $1,600 · paid: $1,600
WORK DOES NOT CONFORM TO APPROVED PLANS AT TIME OF INSPECTION I OBSERVED A 4 PT SUSPENDED SCAFFOLD INSIDE SHAFT FOR USED BY BLOCK WORKERS UPON REVIEW OF SSP SCAFFOLD WAS NOT INDICATED ON PLANS. STOP ALL USE OF
Penalty: $1,000 · paid: $1,000
HOUSEKEEPING. HOUSEKEEPING ON 59TH FLOOR WAS NOT ADEQUATE CONSISTING OF CONSTRUCTION MATERIAL LAYING ON FLOORS & CREATING A TRIP & FALL HAZARD. REMEDY: MAINTAIN HOUSEKEEPING AS PER CODE.
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD PUBLIC & PROPERTY INRESPONSE TO INCIDENT#23729 CONSTRUCTION DEBRIS FELL FROM BLDG DAMAGING A CAR PARKED ON STREET. STOP ALL WORK ENTIRE SITE. REMEDY: SAFEGUARD PUBLIC & PROPERTY AT ALL TIME
Penalty: $10,000 · paid: $10,000
SEC. 3301.2 FAILURE TO MAINTAIN. OBSERVED UNCAPPED REBAR AT VARIOUS LOCATIONS THROUGHOUT THE 58TH & 59TH FLOORS. UNCAPPED REBARS CREATES AN IMPALING HAZARDOUS CONDITION FOR WORKERS ON SITE. REMEDY: PROVIDE CAPS
Penalty: $1,600 · paid: $1,600
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION: FALLING DEBRIS. NOTED: AT TIME OF INSPECTION OF 67 STY BLDG ERECTED TO 54 FL OBSERVED CONCRETE DEBRIS FALLING OFF BLDG INTO MURRAY
Penalty: $10,000 · paid: $10,000
SEC. 3308.5 FAILURE TO INSTALL OR MAINTAIN(VERTICAL)NETTING SYSTEM AS REQUIRED. NOTED: AT THE 54-50 FL OF 62 STY BLDG UNDER CONSTRUCTION. THE VERTICLE NETTING SYSTEM IS NOT SECURE AT VARIOUS EXPOSURES. TURN BUC
Penalty: $1,600 · paid: $1,604
SEC. 3303.4.7 STORAGE NEAR SIDEWALK,WALKWAYS,PATHWAYS. NOTED: AT MURRAY ST OBSERVED RESHORES STORED ON STREET RIGHT NEXT TO BARRUCADES-THEN WHRE PEOPLE ARE WALKING-CROSSING STREETS RESHORES ARE STACKED APPROX 8
Penalty: $800 · paid: $800
SEC. 3301.1.2 FIRE GENERAL: NO FIRE GUARD(THAT WORK.)NOTED: AT THE 51ST FL OBSERVED WORKER ON 6FT LADDER USING GRINDER TO CUT BACK EXPOSED REBAR AT CEILING LEVEL-CAUSING SPARKS-NO FIRE GUARD.(NO THAT WORK)PERMI
Penalty: $800 · paid: $800
FAILURE TO MAINTAIN: HOUSING. NOTED: AT FLOORS 54-51 OF 62 STY BLDG UNDER CONSTRUCTION THE HOUSEKEEPING IS NOT PER CODE. THERE ARE VARIOUS CONSTRUCTION DEBRIS IS CLOSE PROXIMITY TO LEADING EDGE THAT IS NOT PROT
Penalty: $1,600 · paid: $1,600
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: AT THE 52-53 FLOOR OF 52 STY BLDG UNDER CONST OBSERVED 4-5 WORKERS AROUND ELEVATOR SHAFT,THERE IS A APPROX 8'X6' OPENING
Penalty: $1,600 · paid: $1,604
FAILURE TO MAINTAIN: GUARDRAILS. NOTED: AT THE 49 FLOOR-ELEVATOR SHAFTWAY W/NO GUARDRAIL IN PLACE AS YOU COME OFF STAIRS SOME LOOSE YELLOW ROPE ON THE FLOOR,OTHER SIDE OF HOLE HAS SOME LOOSE YELLOW ROPE W/GUARD
Penalty: $1,600 · paid: $1,600
SEC. 3301.1.2 IN PROPER STORAGE. NOTED: OBSERVED IMPROPER STORAGE AT COMBUSTIBLE MATERIAL ON WORKING FLOOR. "COKE" STORED IN CARDBOARD CYLINDER-NO METAL,DIAMOND PLATE CONTAINER OBSERVED. REMEDY: COMPLY W/CODE.
Penalty: $1,600 · paid: $1,603
NON IDENTIFIED HOISTING EQUIPMENT WIRE ROPE SLINGS TOWER CRANE CD #1013/15 HMD MICHAEL ISABELLA LIC #9472. USER OFF LOADING STEEL TRUCK. 2 LOADS SLUNG HOISTED USING UNIDENTIFIED HOISTING SLINGS. I HAVE WARNED T
Penalty: $800 · paid: $800
OPERATION OF CRANE W/O C OF O. CN#1013/15 CD#4814 HMO MICHAEL ISABELLA NO C OF O ON SITE(NO CD 2). REMEDY: OBTAIN C OF O.
SEC. 3301.1.3 MANUFACTURER SPECIFICATIONS. NOTE: AT THE TIME OF MY INSPECTION OF A 62 STY BLDG AT 27TH FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED A SALA D RING SYSTEM ANCHOR INTO CONCRETE WALL BEING USE
Penalty: $1,600 · paid: $1,600
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVEDAMENDMENTS. NOTE: AT THE TIME OF MY INSPECTION OF A 62 STY BLDG AT 27TH FL LEVEL,I OBSERVED COCOON SYSTEM ON WORKING DECK WAS APPROX 42 INCH
Penalty: $1,000 · paid: $1,000
FAILURE TO INSITTUTE & MAINTAIN SAFETY EQUIPMENT MEASURES. NOTE: AT THE TIME OF INSPECTION OF A 62 STY BLDG AT 27TH FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED DELIVERY OPERATION AT GRADE LEVEL AT EXP#1
Penalty: $5,000 · paid: $5,000
SEC. 3308.4 RESPONSIBILITY & SUPUERVISION. NOTE: AT THE TIME OF MY INSPECTION OF A 62 STY BLDG AT 27TH STY LEVEL,CONSTRUCTION WORK IN PROGRESS. A WORKER WAS INJURE & TAKEN TO HOSPITAL DURING COCOON SYSTEM JUMPI
Penalty: $1,600 · paid: $1,600
SEC. 3314.8 GUARDRAIL SYSTEM. NOTE: AT THE TIME OF MY INSPECTION OF A 62 STY BLDG AT 27TH FL LEVEL,CONSTRUCTION WOKR IN PROGRESS. I OBSERVEDA WORKER ON A SUPPORTED BAKER SCAFFOLD ON 9TH FL STAIRWAY APPROX 6FEET
Penalty: $1,600 · paid: $1,600
FAIL TO PERFORM HYDROSTATIC TEST-STANDPIPE NOTE: AT THE TIME OF MY INSPECTION OF A 62 STY BLDG AT 27TH FL LEVEL APPROX 334 FEET IN HEIGHT. UPON REQUEST FOR HYDROSTATIC TEST FOR STANDPIPE AS REQUIRE TO VERIFY
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: AT THE TIME OF MY INSPECTION OF A 62 STY BLDG AT 27 STY LEVEL,CONSTRUCTION WORK IN PROGRESS. RESPONDING TO COMPLAINT #14375
Penalty: $5,000 · paid: $5,000
FAILURE TO PERFORM PROPER CONCRETE WASHOUT PROCEDURES AT SITE,COLLECTION AND CONTAINMENT. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSEVED CONCRETE PLACEMENT AT FLOOR 12 SLAB.CONCRETE MIX
Penalty: $1,200 · paid: $1,200
FAILURE TO PROTECT: NO OVERHEAD PROTECTION NOTED: AT TIME OF INSPECTION OF A DOB INCIDENT AT 62 STY BLDG ERECTED TO THE 11TH FL. CONCRETE CAME OFF BLDG & HIT (DBC) STACKED (SHANTY)(TRILER)BELOW. THERE IS NO OVE
Penalty: $10,000 · paid: $10,000
FAILURE TO SAFEGUARD PERSON & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: AT TIME OF INSPECTION RESPONDED TO DOB (INCIDENT) THERE CONCRETE BLOW OUT AT FORM WORK FOR SHEER WALL AT THE 11TH FL SPILLED
Penalty: $10,000 · paid: $10,000
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OF APPROVED AMENDMENTS.AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSERVED CONCRETE PLACEMENT IN WALLS GOING FROM 11TH TO 12TH FLR
Penalty: $1,000 · paid: $1,000
WORK DOES NOT CONFORM TO APPROVED PLAN OR CONSTRUCTION DOCUMENTS/AMENDMENTS. NOTED: AT TIME OF INSPECTION OF 62 STY BLDG. THE HORIZONTAL NETS AT THE 8TH FL ARE NOT AS PER PLANS. NETTING IS NOT TIED TIGHT TO BLD
Penalty: $1,000 · paid: $1,000
SEC. 28-103.8 MATTERS NOT PROVIDED FOR AS NOTED: AT TIME OF INSPECTIONAT ACTIVE JOB SITE,SAFETY STRAPS INSTALLED NO SAFETY STRAP LOG ON SITE. BLDG IS UP TO THE 11TH FL. CONCRETE SAFETY MANAGER ON SITE #CSM 2114
Penalty: $800 · paid: $800
SEC. 38-104.7 SUBMITTAL OF CONSTRUCTION DECUMENTS AS NOTED: AT TIME OFINSPECTION ON AN ACTIVE JOB SITE,OBSERVE AT FLOOR #10,EXP#2 A)DOKA FORMWORK H-20 BEAM SUPPORT BY METAL JACK ON ANGLE AT PERIMETER OF SLAB.
Penalty: $800 · paid: $800
SEC. 3310.9 ADDITIONAL SITE SAFETY PERSONNAL. NOTE: AT TIME OF INSPECTION AT ACTIVE JOB SITE REQUIRING CSM. CSM ON SITE MR. CESAR M. SILLAS #2114 WHO HAS WORKED AS THE CONCRETE SAFETY MANAGER FOR 2 MONTHS IS
Penalty: $800 · paid: $800
SEC. 3301.7 FAILURE TO PROVIDE P.E. APPROVED DESIGN DRAWING. AS NOTED:AT TIME OF INSPECTION AT ACTIVE JOB SITE OBSERVED SAFETY STRAPS INSTALLED THRU-OUT BLDG. NO P.E. DESIGN ON SITE FOR STRAPS. PARTIAL STOP WOR
Penalty: $800 · paid: $800
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 111 MURRAY STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.