← Buildings

130 William Street

Built in 2017, 242 residences across 66 floors.

130 William Street, 10038

130 William St

130 William was designed by Adjaye Associates, 66 storeys and 242 residences in the Financial District, and it is the practice's first tower.

The facade is hand cast concrete, textured to a rough porous surface and darkened almost to black, with bronze at the openings. The windows are arched, oversized, and set in a rhythm drawn from the mercantile buildings that once stood in this part of the city. The floors step back slightly against each other so the elevation carries a sawtooth line rather than a flush one.

The arch is what an interior has to answer. Every window head in the building is a curve fixed by the facade, so anything mounted at the head of an opening, a track, a blind box, a valance, has a curved soffit above it rather than a flat one, and a treatment specified for a rectangular window will not fit. The arches are deep and bronze framed, which gives a real reveal to work into.

The openings are large and repeat floor to floor, so light reaches well back into the plan.

Within walking distance

758 mHudson Furniture · showroom
920 mSuperhouse · gallery
950 mGalerie 56 · gallery
1008 mTwenty First Gallery · gallery
1060 mSchoelkopf Gallery · gallery
1065 mR & Company · gallery

Building facts

Built

2017

Floors

66

Residences

242

New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1000777501.

Public records show 130 WILLIAM STREET was built in 2017 and rises 61 floors with 240 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).

Public record

Total units

306

Total permits

50 or more

NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1000777501. Violations and permits as of October 26, 2026.

10 filings in the last 24 months, last filing Sep 2026

The record

Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.

DOB NOW filings from June 2016.

General ConstructionFiled by SAWH VOLTCOMM CONSTRUCTI*lic. 622372Permit Issued · Sep 7, 2026 · job M01364910-I1

FIT-OUT TO EXISTING SHELL SPACE FOR A NEW IMAGING CENTER.

Filed estimated cost: $875,014 (as filed, not verified)

PlumbingFiled by PAL-MAR PLBG & HTG INClic. 001533Permit Issued · Aug 19, 2026 · job M01364910-S2

New plumbing fixtures to tenant shell space.

Filed estimated cost: $146,000 (as filed, not verified)

SprinklersFiled by FULL CAPACITY FIRE CORPlic. 000453Permit Issued · Aug 13, 2026 · job M01364910-S3

Modification to sprinkler system

Filed estimated cost: $119,263 (as filed, not verified)

Suspended ScaffoldFiled by CERINA GENERAL CONTR. INClic. 006507Permit Issued · Jun 29, 2026 · job M01419141-I1

Rigging for Industrial Rope Access

Filed estimated cost: 0 (as filed, not verified)

Mechanical SystemsFiled by SAWH VOLTCOMM CONSTRUCTI*lic. 622372Permit Issued · Jun 25, 2026 · job M01364910-S1

Modification to HVAC system

Filed estimated cost: $549,991 (as filed, not verified)

Protection and Mechanical MethodsFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Feb 17, 2026 · job M01344511-I1

INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERIAL HOIST RACK INSIDE THE BUILDING FROM THE GROUND FLOOR TO THE 2ND FLOOR SLAB.

Filed estimated cost: $1,000 (as filed, not verified)

General ConstructionFiled by DARTOM CABINETRY CORPlic. 624189Permit Issued · Nov 28, 2025 · job M01203392-I1

Minor interior renovation to apartment#63A on the 58th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.

Filed estimated cost: $12,000 (as filed, not verified)

General ConstructionFiled by DARTOM CABINETRY CORPlic. 624189Permit Issued · Nov 28, 2025 · job M01203392-I1

Minor interior renovation to apartment#63A on the 58th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.

Filed estimated cost: $12,000 (as filed, not verified)

StructuralFiled by BUNLIN LLClic. 613066Permit Issued · Nov 23, 2025 · job M01307707-S1

STRUCTURAL WORK IN CONJUNCTION WITH RETAIL SPACE TENANT FITOUT. REMOVAL OF KNOCKOUT SLABS TO ACCOMODATE NEW ELEVATOR SHAFTWAY

Filed estimated cost: $50,000 (as filed, not verified)

General ConstructionFiled by BUNLIN LLClic. 613066Permit Issued · Nov 23, 2025 · job M01307707-I1

TENANT FITOUT ADJUSTMENTS AT CELLAR, 1st FLOOR AND 2ND FLOOR. BUILDING OUT COMMERCIAL ELEVATORS CONNECTING 3 FLOORS ENCLOSED SPACES ADJACENT TO OPEN FLOOR PLAN. THERE IS NO PROPOSED CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

Filed estimated cost: $689,000 (as filed, not verified)

40 earlier filings, 2018–2024
Suspended ScaffoldFiled by EASI CAULKING INClic. 006317Signed-off · Aug 13, 2024 · job M01094003-I1

FACADE RESTORATION VIA SUSPENDED SCAFFOLD

Filed estimated cost: 0 (as filed, not verified)

PlumbingFiled by CK PLUMBING & MECH INClic. 000832Signed-off · Jan 28, 2024 · job M00972708-S4

Installation of new plumbing fixtures, associated with interior renovation filed under M00972708-I1.

Filed estimated cost: $56,000 (as filed, not verified)

SprinklersFiled by DC BUILDING SERVICES INClic. 000926Signed-off · Jan 28, 2024 · job M00972708-S3

PROVIDE SPRINKLER HEADS AND ASSOCIATED SYSTEM PIPING CONNECTED TO EXISTING BUILDING SPRINKLER SYSTEM AS NOTED TO PROTECT THE NEW ARCHITECTURAL LAYOUT. NO NEW STANDPIPE PIPING OR RELATED APPURTENANCES ARE PART OF THIS PROJECT.

Filed estimated cost: $25,000 (as filed, not verified)

General ConstructionFiled by HD HVAC OF NY INClic. 036073Signed-off · Jan 21, 2024 · job M00972708-I1

INTERIOR RENOVATION OF an EXISTING STORE AT 1ST FLOOR. INSTALLATION OF INTERIOR PARTITION WALLS, DROP CEILING, AND FLOORING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $130,000 (as filed, not verified)

Mechanical SystemsFiled by HD HVAC OF NY INClic. 036073Signed-off · Jan 3, 2024 · job M00972708-S1

INSTALLATION OF NEW WATER-SOURCE HEAT PUMPS. ITS ASSOCIATED PIPING, DUCTWORK AND CONTROLS. INSTALLATION OF NEW TOILET EXHAUST FANS AND HOT WATER AIR CURTAINS.

Filed estimated cost: $100,000 (as filed, not verified)

Protection and Mechanical MethodsFiled by ARSENAL SCAFFOLD INClic. 018914Signed-off · Sep 7, 2023 · job M00930095-I1

Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Filed estimated cost: $2,500 (as filed, not verified)

Sidewalk ShedFiled by ARSENAL SCAFFOLD INClic. 018914Signed-off · Sep 7, 2023 · job M00930085-I1

Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Filed estimated cost: $1 (as filed, not verified)

Protection and Mechanical MethodsFiled by ARSENAL SCAFFOLD INClic. 018914Signed-off · Sep 7, 2023 · job M00930095-I1

Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Filed estimated cost: $2,500 (as filed, not verified)

Sidewalk ShedFiled by ARSENAL SCAFFOLD INClic. 018914Signed-off · Sep 7, 2023 · job M00930085-I1

Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Filed estimated cost: $1 (as filed, not verified)

General ConstructionFiled by A & B CONTRACTING SVCS INlic. 026016Signed-off · Sep 11, 2022 · job M07994285-I1

INTERIOR RENOVATION OF APT45-C.REMOVAL OF NON-BEARING WALL, DOORS. INSTALLATION OF POCKET-DOOR, CLOSET MODIFICATION & WINDOW BENCH. NO CHANGE OF USE/OCCUPANCY OR EXIT UNDER THIS APPLICATION.

Filed estimated cost: $33,344 (as filed, not verified)

General ConstructionFiled by M.R.S., INClic. 013308Signed-off · Jul 31, 2022 · job M00773330-I1

FILING FOR INTERIOR RENOVATION OF PENTHOUSE A. REMOVE BATHTUB AND INSTALL NEW SHOWER IN BATHROOM. REMOVE WALK IN CLOSET IN MASTER BEDROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $9,996 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jul 19, 2022 · job M00777915-I1

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by MANHATTAN D ENTERPRISESlic. 620856Signed-off · May 4, 2022 · job M00725007-I1

INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

Filed estimated cost: $1,000 (as filed, not verified)

Protection and Mechanical MethodsFiled by ARTEX SYSTEMS INClic. 605493Signed-off · May 2, 2021 · job M00490400-I1

INSTALLATION OF TEMPORARY CATHEAD CONSTRUCTION EQUIPMENT, AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121192903.

Filed estimated cost: $180 (as filed, not verified)

Protection and Mechanical MethodsFiled by GILBANE BUILDING COMPANYlic. 036789Signed-off · May 2, 2021 · job M00490400-I1

INSTALLATION OF TEMPORARY CATHEAD CONSTRUCTION EQUIPMENT, AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121192903.

Filed estimated cost: $180 (as filed, not verified)

Sidewalk ShedFiled by MANHATTAN D ENTERPRISESlic. 620856Signed-off · May 21, 2020 · job M00340821-I1

INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

Filed estimated cost: $1,000 (as filed, not verified)

Sidewalk ShedFiled by MANHATTAN D ENTERPRISESlic. 620856Signed-off · May 21, 2020 · job M00340821-I1

INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

Filed estimated cost: $1,000 (as filed, not verified)

Sidewalk ShedFiled by MANHATTAN D ENTERPRISESlic. 620856Signed-off · May 21, 2020 · job M00340821-I1

INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

Filed estimated cost: $1,000 (as filed, not verified)

Supported ScaffoldFiled by STRUCTURETECH NEW YORK INlic. 608764Signed-off · Mar 10, 2020 · job M00327391-I1

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION

Filed estimated cost: $35,000,000 (as filed, not verified)

Supported ScaffoldFiled by STRUCTURETECH NEW YORK INlic. 608764Signed-off · Mar 10, 2020 · job M00327391-I1

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION

Filed estimated cost: $35,000,000 (as filed, not verified)

Supported ScaffoldFiled by DHS FRACO LLClic. 616838Signed-off · Oct 9, 2019 · job M00243687-I1

INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

Filed estimated cost: $1,000 (as filed, not verified)

Supported ScaffoldFiled by DHS FRACO LLClic. 616838Signed-off · Aug 1, 2019 · job M00204568-I1

INSTALLATION OF TEMPORARY STAIR TOWER FOR WORKER ACCESS DURING CONSTRUCTION. STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF THE NYC CC OF 2014. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $1,000 (as filed, not verified)

Supported ScaffoldFiled by BUNLIN LLClic. 613066Signed-off · Jun 20, 2019 · job M00158909-I1

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Filed estimated cost: $1 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Supported ScaffoldFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Aug 18, 2018 · job M00071511-I1

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

Construction FenceFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Jun 6, 2018 · job M00050350-I1

INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $300,000 (as filed, not verified)

3 resolved
HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

HPD Violation · Class AVIOLATION DISMISSED · issued Apr 19, 2021

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

HPD Violation · Class BVIOLATION CLOSED · issued Dec 12, 2002 · apt 4

§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING AT ENTIRE APARTMENT, 4th STORY, APARTMENT

Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.

Condo documents are recorded at unit level. Search a unit to see them.

HPD maintenance complaints

HPD · NYC Open Data

UNSANITARY CONDITION — SEWAGECLOSE · Apr 30, 2024

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

UNSANITARY CONDITION — SEWAGECLOSE · Apr 23, 2024

The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.

HEAT/HOT WATER — ENTIRE BUILDINGCLOSE · Jan 9, 2022

The Department of Housing Preservation and Development responded to a complaint of no heat or hot water and was advised by a tenant in the building that heat and hot water had been restored. If the condition still exists, please file a new complaint.

HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 26, 2026.

Pre-2016 DOB filings

DOB legacy · NYC Open Data

4 DM filings2015
26 A2 filings1994–2019
7 NB filings2004–2016
11 A3 filings1991–2019
2 A1 filings1993–1994

DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 26, 2026.

DOB legacy violations

DOB BIS · NYC Open Data

33 resolved, most recent Sep 22, 2022
BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDAug 1, 2022

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CONFIRMED SUBMISSION. · disposed Sep 22, 2022

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJun 22, 2021

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DOWNGRADED TO CLASS 2 OR 3 · disposed Jun 24, 2021

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJul 8, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Sep 5, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJul 8, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

RBG PAID INVOICE 62162380 · disposed Feb 2, 2020

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJul 8, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE_62148411 · disposed Dec 16, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJul 8, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Oct 24, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJan 22, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

JTR INV 62054283 PAID ON2/1/19 · disposed Feb 5, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJan 22, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Jul 4, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJan 22, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

JTR INV 62054293 PAID ON2/1/19 · disposed Feb 5, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJan 22, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SKK INVOICE # 62054282 · disposed Feb 4, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDMar 6, 2018

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Apr 12, 2018

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDMar 6, 2018

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DISMISSED · disposed Apr 12, 2018

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMar 2, 2015

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT

DAACIA DISMISSED,FULL PENALTY OF $1000 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMay 14, 2014

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

CIAKKG CANCEL, WAIVED, NOT POSTED AT CLOSING D#2014051301304002 · disposed Feb 22, 2018

FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED — V*-DOB VIOLATION - DISMISSEDAug 29, 2013

FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012

JNW LATE PENALTY PAID INVOICE # 62036220 · disposed Dec 6, 2018

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDFeb 28, 2013

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT

DAACIA DISMISSED,FULL PENALTY OF $1000 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL — V*-DOB VIOLATION - DISMISSEDFeb 20, 2013

CYCLE 7 UNSAFE REPORT FILED

CAW DM-FULL DEMOLITION SIGNED OFF 5/9/2017 DM-FULL DEMOLITION SIGNED OFF 5/ · disposed Apr 30, 2018

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 2, 2012

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PAID 09/06/2018 INV #13440007 · disposed Sep 6, 2018

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDDec 12, 2011

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT

DAACIA DISMISSED,FULL PENALTY OF $1000 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDDec 30, 2009

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDDec 31, 2008

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDDec 31, 2008

DELETED BY DAA ON 10/17/18 BECAUSE AMT ENTERED IN ERROR · disposed Oct 16, 2018

LL2604E-EMERGENCY POWER NONE — V*-DOB VIOLATION - DISMISSEDMar 30, 2008

CAW FULL DEMOLITION OF A SIX STORY MIXED RESIDENTIAL AND COMMERCIAL BUILDI · disposed Feb 14, 2019

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2008

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2008

DELETED BY DAA ON 10/17/18 BECAUSE AMT ENTERED IN ERROR · disposed Oct 16, 2018

LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL — V*-DOB VIOLATION - DISMISSEDNov 29, 2007

JNW LATE PENALTY PAID INVOICE # 62036219 · disposed Dec 6, 2018

C-CONSTRUCTION OTHER OPTIONAL — V*-DOB VIOLATION - DISMISSEDOct 15, 2007

OK TO DISMISS DOB VIO, FULL DEMO PERMIT# 122613733 OBTAINED/SIGNED OFF · disposed Sep 9, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDJan 18, 2007

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDJan 5, 2006

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDJan 30, 2005

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMar 25, 2002

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDAug 28, 1995

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMar 17, 1993

DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018

DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 26, 2026.

ECB violations

Environmental Control Board · NYC Open Data

50 resolved, most recent May 23, 2025
Unknown — CLASS - 2RESOLVE · May 23, 2025

400 AMP TRANS-S INSTALLED WITHOUT A PERMIT ON FILE EPR/.EAB-SUB#17A0813CAL.#56170 AND PERMIT M00269590 DOES NOT COVER THIS WORK AND CONTRACTOR DOES NOT TAKE RESPONSIBILTY, OBTAIN PERMIT; OBTAIN ELECTRICAL PERMI

Penalty: $400 · paid: $400

Construction — CLASS - 2RESOLVE · Apr 25, 2024

AT THE TIME OF INSPECTION OBSERVED UNDERSIDE OF THE SIDEWALK SHED WAS NOT ILLUMINATED AS REQUIRED BY CODE-BC.3307.6.4.8.THIS CREATES HAZARDOUS CONDITIONS FOR PEDESTRANS AS THEY WALK UNDERNEATH: SLIPPING, TRIPP

Penalty: $2,400 · paid: $2,572 · balance due: $21

Construction — CLASS - 2RESOLVE · Mar 14, 2024

OBSERVED SIDEWALK SHED IN PLACE AT EXP#4 AND SIDEWALK SHED WITH NO LIGHTS, NOT ILLUMINATED AND WALKING WAS DARK. THIS CONDITION POSE A TRIPPING HAZARD AND COULD CAUSE IN SERIOUS INJURY.PROVIDE SIDEWALK SHED LIG

Penalty: $2,400 · paid: $2,608 · balance due: $21

Construction — CLASS - 2RESOLVE · Dec 18, 2022

AT TIME OF INSPECTION OF A 61 STORY NEW BUILDING, OBSERVED AT EXPOSURE # 1 SIDEWALK CLOSED WITH DETOUR OF PEDESTRIANS IN TO THE STREET, UPON REQUEST TO VIEW THE D O T PERMIT TO OCCUPY THE SIDEWALK AT EXPOSURE #

Penalty: $620 · paid: $620

Construction — CLASS - 1RESOLVE · Dec 18, 2022

AT TIME OF INSPECTION, OBSERVED PLASTIC BARRICADES CLOSING THE SIDEWALK AND DETOURING PEDESTRIANS INTO THE STREET, OBSERVED PLASTIC BARRICADES NOT INTERLOCKED WITH EACH OTHER, AND NOT FILLED WITH WATER OR SAND

Construction — CLASS - 1RESOLVE · Dec 18, 2022

AT TIME OF INSPECTION OBSERVED AT EXPOSURE # 1 CYCLONE FENCE INSTALLED ON TOP OF PLASTIC BARRICADES CLOSING THE COURT YARD AND SIDEWALK AT EXPOSURE # 1, UPON REQUEST TO VIEW THE DESIGN DRAWINGS FOR THE CYCLONE

Penalty: $625 · paid: $625

Construction — CLASS - 2RESOLVE · Nov 29, 2022

AT THE TIME OF INSPECTION OF AN OCCUPIED 66 STORY BUILDING, WHILE RESPONDING TO AN INCIDENT I OBSERVED THE ELECTRIC CABLE CONNECTED TO THE SUSPENDED SCAFFOLD AT THE ROOF LEVEL BROKEN/DAMAGE DUE TO THE WIND. I A

Unknown — CLASS - 1RESOLVE · Jun 28, 2022

FAILURE TO NOTIFY DEPT OF ACCIDENT OR INCIDENT THAT RESULTED IN FATALITY OR INJURY NOTE:WORKER FELL FROM LADDER WORKER SUFFERING BACK PAIN.WORKER TAKEN TO HOSP.AS PER CHECK OF DEPT RECORDS PERMIT HOLDER FAILED

Construction — CLASS - 2RESOLVE · Dec 29, 2021

SEC. AC 27-1009(2) FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-ROOF WATER LEAK. I OBSERVED AT ADJ PROPERTY ROOF LEVEL,SYSTEM SCAFFOLD & SUSPENDED SCAFFOLD. ON THE LEVEL DIREC

Construction — CLASS - 2RESOLVE · Dec 29, 2021

FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. I OBSERVED SEVERAL BLACK GARBAGE BAGS ACCUMULATED ON THE ROOF LEVEL OF THE ADJOINING PROPERTY AT 136 WILLIAM ST. CONTRACTOR HAS INSTALLED A SY

Penalty: $625 · paid: $625

Construction — CLASS - 2RESOLVE · Dec 29, 2021

SEC. BC 3309.10 ROOF PROTECTION AT EXP#2 ADJ PROPERTY. I OBSERVED AT ROOF LEVEL OF 136 WILLIAM ST(EXP#2 OF 130 WILLIAM ST)SYSTEM SCAFFOLD & SUSPENDED SCAFFOLD. NO OVERHEAD PROTECTION FOR MECHANICAL EQUIPMENT OF

Penalty: $625 · paid: $631

Construction — CLASS - 2RESOLVE · Sep 14, 2021

FAILURE TO MAINTAIN/DISPLAY ONSITE DOCS REQUIRED BY CH33 ATOI ON ACTIVE JOBSITE I OBSERVED BANNER W/TRAPS AROUND SWS PARAPET PANEL@EXP1 W/TRAPS ATTACED TO BEAMS,CROSS(ILLEGIBLE) UPRIGHT POST.UPON MY REQUEST WHE

Penalty: $1,250 · paid: $1,250

Construction — CLASS - 2RESOLVE · Mar 22, 2021

FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURES. NOTE: AT THE TIME OF INSPECTION RESPONDING TO A COMPLAINT OF PIECE OF SUSPENDED SCAFFOLD FELL INTO SITE. INSPECTION REVEALS THE ROLLER FROM THE SUSPENDED SCAFFOL

Penalty: $5,000 · paid: $5,000

Unknown — CLASS - 1RESOLVE · Mar 10, 2021

FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE A WORKER FELL FROM A SCAFFOLD THAT COLLAPSED SUFFERING A LOWER BACK INJURY.THE WORKER WAS TRANSPORTED TO A HOSPITAL

Penalty: $1,250 · paid: $1,250

Construction — CLASS - 1RESOLVE · Feb 24, 2021

FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURES(UNSAFE SCAFFOLD). NOTEAT TIME OF MY INSPECTION OF 61 STY BLDG IN RESPONSE TO AN INCIDENT REPORTED WHERE ONE WORKER INJURED HIS BACK DURING CARPENTRY OPERATION WHE

Local Law — CLASS - 2RESOLVE · Jun 2, 2020

FAILURE TO FILE ACCEPTABLE CYCLE 7B REPORT INDICATING CORRECTION OF UNSAFE CONDITION DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #700215 FILE ACCEPTABEL REPORT

Construction — CLASS - 1RESOLVE · Jan 13, 2020

BC33012-UNCAPED EXPOSED BOLTS AND COPPER PIPES.NOTE:AT THE TIME OF INSPECTION OBSERVED A 61 STORY BUILDING UNDER CONSTRUCTION AT ROOF LEVEL.WORKERS WORKING O IT.I ALSO OBSERVED UNCAPED EXPOSED BOLTS,COPPER PIPE

Construction — CLASS - 2RESOLVE · Nov 14, 2019

27-929.1 A.C. 27-929-1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDIN

Unknown — CLASS - 1RESOLVE · Sep 22, 2019

FAILURE TO NOTIFY THE DEPARTMENT OF AN INDICNET THAT RESULTED IN A FATALITY OR INJURY NOTE ONE OWRKER FOREMAN WAS SLICED CUT BY ANOTHER CO WORKER WHILE REMOVING METAL STUDS WORKER WAS TAKEN TO THE HOSPITAL AS P

Construction — CLASS - 2RESOLVE · Aug 26, 2019

BC 3301.7 DOCUMENT TO BE KEPT ON SITE. AT THE TIME OF INSPECTION ON ANACTIVE JOBSITE CURRENTLY AT ROOF LEVEL,I OBSERVED TARPAULIN W/ TRAPS INSTALLED AROUND SIDEWALK SHED PARAPET WALLS,UPON MY REQUEST FOR DESIGN

Penalty: $620 · paid: $620

Cranes and Derricks — CLASS - 1RESOLVE · Apr 18, 2019

AT TIME OF INSPECTION INADEQUATE SAFETY MEASURES OPERATING TOWER CRANECD#5031 UNDER CN#669/17 RESPONDENT FAIL TO MAKE SURE SIGNAL PERSON BYRON GILES AND OPERATOR WILLIAM BEACH HMO LIC#5687 WERE COMMUNICATING W/

Penalty: $10,000 · paid: $10,000

Cranes and Derricks — CLASS - 1RESOLVE · Apr 18, 2019

@TIME OF INSP,INADEQUATE SAFETY MEASURES.OPERATING TOWER CRANE CD#3031UNDER CN#669/17.OPERATOR WILLIAM J BEACK LICE #5687 FAILED TO COMMUNICATE W/SIGNAL PERSON W/HARD WIRE COMMUNICATION AS PER CN 3RD PARTY CERT

Penalty: $10,000 · paid: $10,000

Cranes and Derricks — CLASS - 1RESOLVE · Apr 18, 2019

@TIME OF INSP,INADEQUATE SAFETY MEASURES OPERATIONS TOWER CRANE CD#5031 UNDER CN#669/17 LIFT DIRECTOR/SIGNAL PERSON BYRON GILES FAILED TO COMMUNICATE W/OPERATOR WILLIAM BEACH HMO LIC#5687 W/HARD WIRE COMMUNICAT

Construction — CLASS - 1RESOLVE · Apr 16, 2019

SEC. 3301.2 FAILURE TO MAINTAIN SAFETY OPERATIONS. NOTE: AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE,ANSWERING AN INCIDENT WHERE A WORKER ON SCISSOR LIFT DOING PACHING WORK ON THE CEILING,CHOPPED A BUCKET

Construction — CLASS - 1RESOLVE · Mar 26, 2019

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.AT THE TIME OF INSPECTION IT WAS OBSERVED THAT A WORKER WAS INJURED AT WORKING DECK 56 FLOOR. IT WAS OBSERVED THAT A PLYWOOD

Construction — CLASS - 1RESOLVE · Feb 5, 2019

28-103.8 MATTERS NOT PROVIDED FOR CONCRETE EMBEDDED SAFETY STRAPS. AT TIME OF INSPECTION ON A PROPOSED 61 STORY BUILDING AT 43 FLOOR LEVEL, OBSERVED SAFETY STRAPS IN PLACE ON VARIOUS FLOORS FROM FLOOR 42 AND

Construction — CLASS - 1RESOLVE · Jan 28, 2019

ESCAPE HATCHES. NOTE: AT THE TIME OF INSPECTION OF A 61 STORY BUILDINGAT 41 FLOOR LEVEL CONSTRUCTION WORK IN PROGRESS, THAT CONSIST OF CON CRETE POURING OPERATION REQUIRING HEATING EQUIPMENT/PORTABLE FUEL FIRE

Penalty: $2,500 · paid: $2,619

Construction — CLASS - 1RESOLVE · Nov 1, 2018

BC 3308.8 MODIFICATION AND ALTERNATIVE SYSTEMS.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29 FL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED A CLIMBING FORMWORK SYSTEM IN PLACE @ INTERIOR OF EXP#2

Construction — CLASS - 1RESOLVE · Nov 1, 2018

FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTION.NOTE: RESPONDING TO A REPORT OF A PARTIAL COLLAPSE AND MATERIAL FAILURE @ A 61 STY BUILDING @ 29TH FL LVL.INSPECTION REVEAL

Construction — CLASS - 1RESOLVE · Nov 1, 2018

28-401.4 ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITH A REQIURED LICENSE OR AUTHORIZATION.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDINH @ 29TH FL LEVEL CONSTRUCTION WORK IN PROGRESS.CURTAIN WAL

Cranes and Derricks — CLASS - 1RESOLVE · Nov 1, 2018

FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKERS COMP,LAW&OR DISABIILITY BENEFTITS.NOTE@THE TIME OF MY INSPECTION OF A 61 STY BUILDING @29TH FL LEVEL CONSTRUCTION WORK IN PROGRESS.I OBSERVED SUB CONTRACTOR

Construction — CLASS - 2RESOLVE · Nov 1, 2018

FAILURE TO SAFEGUARD ALL PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29THFL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED THAT THERE WERE CONCRE

Penalty: $5,000 · paid: $5,000

Construction — CLASS - 1RESOLVE · Nov 1, 2018

BC1704.10.1. SPECIAL INSPECTION.NOTE: @ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FLOOR LVL CONSTRUCTION WORK IN PROFRESS I OBSEVED CURTAIN WALL IN PLACE UP TO 10 FL LEVEL @ EXP#1,2,3,4 UPON REQUEST

Construction — CLASS - 1RESOLVE · Nov 1, 2018

BC3308.6 HORIZONTAL SAFETY NETTING SYSTEM.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED THAT THERE WERE NO HORIZONTAL NETTING IN PLACE @ EXP#3 INTE

Cranes and Derricks — CLASS - 1RESOLVE · Nov 1, 2018

FAILURE TO FILE EVIDENCE OF LIABILITY AND OR PROPERTY DAMAGE INSURANCENOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FL LVL CURTAIN WALL OPERATION UP TO 10 FL LEVEL CONSTRUCTION WORK IN PROGRESS

Construction — CLASS - 1RESOLVE · Nov 1, 2018

BC 3301.6 DESIGN, SIZES & CAPACITY OF MATERIALS,STRUCTURE,TEMPORARY CONSTRUCTION &EQUIPMENT.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED A MAKESHI

Construction — CLASS - 1RESOLVE · Nov 1, 2018

FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES &TEMPORARY CONSTRUCTION.NOTE:RESPONDING TO A REPORT OF A PARTIAL COLLAPSE AND MATERIAL FAILURE @ A 61 STY BUILDING @ 29TH FL LVL.INSPECTION REVEAL THAT

Construction — CLASS - 1RESOLVE · Jul 20, 2018

BC3301.2 FAILURE TO MAINTAIN(REBAR CAPS) AT TIME OF INSPECTION OF NEW 61 STORY BUILDING ACTIVE JOBSITE. I OBSERVED UNCAPPED REBARS AT EXPO#3AND AT DIFFERENT LOCATIONS THROUGHOUT SIDE. THIS CONDITION CREATES A H

Construction — CLASS - 1RESOLVE · Jul 20, 2018

WORK DOES NOT CONFORM TO SITE SAFETY PLAN(YODOK SYSTEM) AT TIME OF INSPECTION OF NEW 61 STORY BUILDING ACTIVE JOBSITE CURRENTLY AT 11 STORY.I OBSERVED YODOK SYSTEM NOT IN STRAIGHT LINE AND NOT FILLED WITH WATER

Penalty: $250 · paid: $250

Construction — CLASS - 1RESOLVE · May 17, 2018

SEC: BC 3301.2. FAIL TO MAINTAIN SAFE OPERATIONS. @ TIME OF INSP OF AN ACTIVE SITE, CONSTRUCTION WORK IN PROGRESS, RESPONDING TO THE COMPLAINT# 1479448 WHERE AN INCIDENT WERE REPORTED. THE INCIDENT OCCURED WHEN

Construction — CLASS - 2RESOLVE · Dec 4, 2017

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.ABOVE RESPONDENT GC ERECTED TOWER CRANE CD #5031 CN#66917 NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.CRANS WAS ERE

Penalty: $500 · paid: $500

Cranes and Derricks — CLASS - 1RESOLVE · Dec 4, 2017

INADEQUATE SAFETY-MEASURES.OPERATION OF CRANE HOISITNG EQUIPMENT IN UNSAFE MANNER.ABOVE GC RESPONDENT SUPERVISED /ERECTED TOWER CRANE CD#5031 CDN#66717 NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.THI

Cranes and Derricks — CLASS - 1RESOLVE · Dec 4, 2017

INADEQUATE SAFETY MEASURES-OPERATION OF CRANE HOISTING EQUIPMENT IN UNSAFE MANNER.ABOVE RESPONDENT/USER ERECTED TOWER,CRANE CD5031 CN #66917NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.THIS ELECTRICAL

Construction — CLASS - 2RESOLVE · Dec 4, 2017

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS ABOVE USER/RESPONDENT ERECTED TOWER CRANE CD 5031 CN#66917 NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.CRANE WAS ER

Construction — CLASS - 1RESOLVE · Mar 9, 2014

FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. 8'HIGH PLYWOOD CON STRUCTION FENCE HAS GAP APPROX 8'HIGH X 3'WIDE MAKING SITE ACCESSIBLE TO PUBLIC. RMDY: REPAIR FENCE.

Penalty: $800

Construction — CLASS - 2RESOLVE · Sep 13, 2013

FAILURE TO POST PERMIT FOR WORK AT PREMISES.NOTED:CONSTRUCTION FENCE ERECTED UNDER JOB#140097295 AND NO PERMIT POSTED. RMDY: POST PERMIT.

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · Nov 25, 2012

FAILURE TO TAKE REQUIRED ACTION TO SECURE PUBLIC SAFETY-UNSAFE FACADE.*NOTED:A FAISP3-NOTIFICATION OF UNSAFE CONDITIONS FORM WAS FILED W/THE"DEPT" ON 11/16/12 & NO SAFETY MEASURES HAVE BEEN INSTALLED.RMDY:IMMED

Penalty: $2,400 · paid: $1,800

Construction — CLASS - 1RESOLVE · Jun 14, 2012

FAILURE TO MAINTAIN. NOTED: UPON INSPECTION METAL SHUTTER HANG OFF OF 3 STORY WINDOW NOT REPAIRED OR TAKEN OFF. PREVIOUS VIOLATION NOT COMPLIED W/#34934810M. REMEDY: REPAIR OR REMOVE.

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 2RESOLVE · Jun 10, 2012

FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A C/C W/THE DOB. DEFECT NOTED: AT TIME OF INSPECTION NO C/C FILED FOR ECB NOV #34934810M DATED: 12.30.11. REMEDY: FILE A C/C.

Penalty: $800 · paid: $800

Local Law — CLASS - 2RESOLVE · May 14, 2012

FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH ARTICLE 28-302 OF THE BUILDING CODE & DOB RULES & REGULATIONS.36017730R. RESPONDENT HAS DEMOSTRATED A HISTORY OF NON-COMPLIANCE WITH

Penalty: $10,000 · paid: $1,000

ECB Violations (6bgk-3dad), NYC Open Data. As of October 26, 2026.

Certificates of occupancy

DOB · NYC Open Data

Renewal With Change241 dwelling unitsCO Issued · Nov 16, 2021 · DOB NOW
19 earlier certificates
Renewal With Change241 dwelling unitsCO Issued · Nov 15, 2022 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Nov 8, 2023 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Oct 21, 2024 · DOB NOW
Final241 dwelling unitsCO Issued · Oct 20, 2025 · DOB NOW
Renewal With Change241 dwelling unitsCO Issued · Sep 1, 2021 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Aug 4, 2023 · DOB NOW
Renewal With Change241 dwelling unitsCO Issued · Aug 4, 2022 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Aug 1, 2024 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Jul 17, 2025 · DOB NOW
Renewal With Change241 dwelling unitsCO Issued · Jun 10, 2021 · DOB NOW
Renewal With Change241 dwelling unitsCO Issued · May 13, 2022 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · May 8, 2023 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · May 3, 2024 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · May 3, 2022 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Apr 10, 2025 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Feb 13, 2024 · DOB NOW
Renewal With Change241 dwelling unitsCO Issued · Feb 13, 2023 · DOB NOW
Renewal With Change241 dwelling unitsCO Issued · Feb 9, 2022 · DOB NOW
Renewal Without Change241 dwelling unitsCO Issued · Jan 13, 2025 · DOB NOW

DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 26, 2026.

What are you trying to do here?

Public records for 130 WILLIAM STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 26, 2026.