Built in 2017, 242 residences across 66 floors.
130 William Street, 10038
130 William was designed by Adjaye Associates, 66 storeys and 242 residences in the Financial District, and it is the practice's first tower.
The facade is hand cast concrete, textured to a rough porous surface and darkened almost to black, with bronze at the openings. The windows are arched, oversized, and set in a rhythm drawn from the mercantile buildings that once stood in this part of the city. The floors step back slightly against each other so the elevation carries a sawtooth line rather than a flush one.
The arch is what an interior has to answer. Every window head in the building is a curve fixed by the facade, so anything mounted at the head of an opening, a track, a blind box, a valance, has a curved soffit above it rather than a flat one, and a treatment specified for a rectangular window will not fit. The arches are deep and bronze framed, which gives a real reveal to work into.
The openings are large and repeat floor to floor, so light reaches well back into the plan.
Within walking distance
Building facts
Built
2017
Floors
66
Residences
242
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1000777501.
Public records show 130 WILLIAM STREET was built in 2017 and rises 61 floors with 240 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
306
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1000777501. Violations and permits as of October 26, 2026.
10 filings in the last 24 months, last filing Sep 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
FIT-OUT TO EXISTING SHELL SPACE FOR A NEW IMAGING CENTER.
Filed estimated cost: $875,014 (as filed, not verified)
New plumbing fixtures to tenant shell space.
Filed estimated cost: $146,000 (as filed, not verified)
Modification to sprinkler system
Filed estimated cost: $119,263 (as filed, not verified)
Rigging for Industrial Rope Access
Filed estimated cost: 0 (as filed, not verified)
Modification to HVAC system
Filed estimated cost: $549,991 (as filed, not verified)
INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERIAL HOIST RACK INSIDE THE BUILDING FROM THE GROUND FLOOR TO THE 2ND FLOOR SLAB.
Filed estimated cost: $1,000 (as filed, not verified)
Minor interior renovation to apartment#63A on the 58th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $12,000 (as filed, not verified)
Minor interior renovation to apartment#63A on the 58th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $12,000 (as filed, not verified)
STRUCTURAL WORK IN CONJUNCTION WITH RETAIL SPACE TENANT FITOUT. REMOVAL OF KNOCKOUT SLABS TO ACCOMODATE NEW ELEVATOR SHAFTWAY
Filed estimated cost: $50,000 (as filed, not verified)
TENANT FITOUT ADJUSTMENTS AT CELLAR, 1st FLOOR AND 2ND FLOOR. BUILDING OUT COMMERCIAL ELEVATORS CONNECTING 3 FLOORS ENCLOSED SPACES ADJACENT TO OPEN FLOOR PLAN. THERE IS NO PROPOSED CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $689,000 (as filed, not verified)
FACADE RESTORATION VIA SUSPENDED SCAFFOLD
Filed estimated cost: 0 (as filed, not verified)
Installation of new plumbing fixtures, associated with interior renovation filed under M00972708-I1.
Filed estimated cost: $56,000 (as filed, not verified)
PROVIDE SPRINKLER HEADS AND ASSOCIATED SYSTEM PIPING CONNECTED TO EXISTING BUILDING SPRINKLER SYSTEM AS NOTED TO PROTECT THE NEW ARCHITECTURAL LAYOUT. NO NEW STANDPIPE PIPING OR RELATED APPURTENANCES ARE PART OF THIS PROJECT.
Filed estimated cost: $25,000 (as filed, not verified)
INTERIOR RENOVATION OF an EXISTING STORE AT 1ST FLOOR. INSTALLATION OF INTERIOR PARTITION WALLS, DROP CEILING, AND FLOORING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $130,000 (as filed, not verified)
INSTALLATION OF NEW WATER-SOURCE HEAT PUMPS. ITS ASSOCIATED PIPING, DUCTWORK AND CONTROLS. INSTALLATION OF NEW TOILET EXHAUST FANS AND HOT WATER AIR CURTAINS.
Filed estimated cost: $100,000 (as filed, not verified)
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $2,500 (as filed, not verified)
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $2,500 (as filed, not verified)
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
INTERIOR RENOVATION OF APT45-C.REMOVAL OF NON-BEARING WALL, DOORS. INSTALLATION OF POCKET-DOOR, CLOSET MODIFICATION & WINDOW BENCH. NO CHANGE OF USE/OCCUPANCY OR EXIT UNDER THIS APPLICATION.
Filed estimated cost: $33,344 (as filed, not verified)
FILING FOR INTERIOR RENOVATION OF PENTHOUSE A. REMOVE BATHTUB AND INSTALL NEW SHOWER IN BATHROOM. REMOVE WALK IN CLOSET IN MASTER BEDROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $9,996 (as filed, not verified)
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY CATHEAD CONSTRUCTION EQUIPMENT, AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121192903.
Filed estimated cost: $180 (as filed, not verified)
INSTALLATION OF TEMPORARY CATHEAD CONSTRUCTION EQUIPMENT, AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121192903.
Filed estimated cost: $180 (as filed, not verified)
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
Filed estimated cost: $35,000,000 (as filed, not verified)
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
Filed estimated cost: $35,000,000 (as filed, not verified)
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY STAIR TOWER FOR WORKER ACCESS DURING CONSTRUCTION. STAIR TOWER SHALL COMPLY WITH CHAPTER 33 OF THE NYC CC OF 2014. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
INSTALLATION OF TEMPORARY FENCE, AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $300,000 (as filed, not verified)
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING AT ENTIRE APARTMENT, 4th STORY, APARTMENT
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development responded to a complaint of no heat or hot water and was advised by a tenant in the building that heat and hot water had been restored. If the condition still exists, please file a new complaint.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 26, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 26, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CONFIRMED SUBMISSION. · disposed Sep 22, 2022
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DOWNGRADED TO CLASS 2 OR 3 · disposed Jun 24, 2021
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Sep 5, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
RBG PAID INVOICE 62162380 · disposed Feb 2, 2020
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
SQS PAID INVOICE_62148411 · disposed Dec 16, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Oct 24, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
JTR INV 62054283 PAID ON2/1/19 · disposed Feb 5, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Jul 4, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
JTR INV 62054293 PAID ON2/1/19 · disposed Feb 5, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
SKK INVOICE # 62054282 · disposed Feb 4, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Apr 12, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Apr 12, 2018
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY OF $1000 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
CIAKKG CANCEL, WAIVED, NOT POSTED AT CLOSING D#2014051301304002 · disposed Feb 22, 2018
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
JNW LATE PENALTY PAID INVOICE # 62036220 · disposed Dec 6, 2018
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY OF $1000 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
CYCLE 7 UNSAFE REPORT FILED
CAW DM-FULL DEMOLITION SIGNED OFF 5/9/2017 DM-FULL DEMOLITION SIGNED OFF 5/ · disposed Apr 30, 2018
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
PAID 09/06/2018 INV #13440007 · disposed Sep 6, 2018
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY OF $1000 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DELETED BY DAA ON 10/17/18 BECAUSE AMT ENTERED IN ERROR · disposed Oct 16, 2018
CAW FULL DEMOLITION OF A SIX STORY MIXED RESIDENTIAL AND COMMERCIAL BUILDI · disposed Feb 14, 2019
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DELETED BY DAA ON 10/17/18 BECAUSE AMT ENTERED IN ERROR · disposed Oct 16, 2018
JNW LATE PENALTY PAID INVOICE # 62036219 · disposed Dec 6, 2018
OK TO DISMISS DOB VIO, FULL DEMO PERMIT# 122613733 OBTAINED/SIGNED OFF · disposed Sep 9, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DAACIA DISMISSED,FULL PENALTY OF $500 PAID INV#62020869 CHK#1019359355 · disposed Oct 16, 2018
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 26, 2026.
ECB violations
Environmental Control Board · NYC Open Data
400 AMP TRANS-S INSTALLED WITHOUT A PERMIT ON FILE EPR/.EAB-SUB#17A0813CAL.#56170 AND PERMIT M00269590 DOES NOT COVER THIS WORK AND CONTRACTOR DOES NOT TAKE RESPONSIBILTY, OBTAIN PERMIT; OBTAIN ELECTRICAL PERMI
Penalty: $400 · paid: $400
AT THE TIME OF INSPECTION OBSERVED UNDERSIDE OF THE SIDEWALK SHED WAS NOT ILLUMINATED AS REQUIRED BY CODE-BC.3307.6.4.8.THIS CREATES HAZARDOUS CONDITIONS FOR PEDESTRANS AS THEY WALK UNDERNEATH: SLIPPING, TRIPP
Penalty: $2,400 · paid: $2,572 · balance due: $21
OBSERVED SIDEWALK SHED IN PLACE AT EXP#4 AND SIDEWALK SHED WITH NO LIGHTS, NOT ILLUMINATED AND WALKING WAS DARK. THIS CONDITION POSE A TRIPPING HAZARD AND COULD CAUSE IN SERIOUS INJURY.PROVIDE SIDEWALK SHED LIG
Penalty: $2,400 · paid: $2,608 · balance due: $21
AT TIME OF INSPECTION OF A 61 STORY NEW BUILDING, OBSERVED AT EXPOSURE # 1 SIDEWALK CLOSED WITH DETOUR OF PEDESTRIANS IN TO THE STREET, UPON REQUEST TO VIEW THE D O T PERMIT TO OCCUPY THE SIDEWALK AT EXPOSURE #
Penalty: $620 · paid: $620
AT TIME OF INSPECTION, OBSERVED PLASTIC BARRICADES CLOSING THE SIDEWALK AND DETOURING PEDESTRIANS INTO THE STREET, OBSERVED PLASTIC BARRICADES NOT INTERLOCKED WITH EACH OTHER, AND NOT FILLED WITH WATER OR SAND
AT TIME OF INSPECTION OBSERVED AT EXPOSURE # 1 CYCLONE FENCE INSTALLED ON TOP OF PLASTIC BARRICADES CLOSING THE COURT YARD AND SIDEWALK AT EXPOSURE # 1, UPON REQUEST TO VIEW THE DESIGN DRAWINGS FOR THE CYCLONE
Penalty: $625 · paid: $625
AT THE TIME OF INSPECTION OF AN OCCUPIED 66 STORY BUILDING, WHILE RESPONDING TO AN INCIDENT I OBSERVED THE ELECTRIC CABLE CONNECTED TO THE SUSPENDED SCAFFOLD AT THE ROOF LEVEL BROKEN/DAMAGE DUE TO THE WIND. I A
FAILURE TO NOTIFY DEPT OF ACCIDENT OR INCIDENT THAT RESULTED IN FATALITY OR INJURY NOTE:WORKER FELL FROM LADDER WORKER SUFFERING BACK PAIN.WORKER TAKEN TO HOSP.AS PER CHECK OF DEPT RECORDS PERMIT HOLDER FAILED
SEC. AC 27-1009(2) FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-ROOF WATER LEAK. I OBSERVED AT ADJ PROPERTY ROOF LEVEL,SYSTEM SCAFFOLD & SUSPENDED SCAFFOLD. ON THE LEVEL DIREC
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. I OBSERVED SEVERAL BLACK GARBAGE BAGS ACCUMULATED ON THE ROOF LEVEL OF THE ADJOINING PROPERTY AT 136 WILLIAM ST. CONTRACTOR HAS INSTALLED A SY
Penalty: $625 · paid: $625
SEC. BC 3309.10 ROOF PROTECTION AT EXP#2 ADJ PROPERTY. I OBSERVED AT ROOF LEVEL OF 136 WILLIAM ST(EXP#2 OF 130 WILLIAM ST)SYSTEM SCAFFOLD & SUSPENDED SCAFFOLD. NO OVERHEAD PROTECTION FOR MECHANICAL EQUIPMENT OF
Penalty: $625 · paid: $631
FAILURE TO MAINTAIN/DISPLAY ONSITE DOCS REQUIRED BY CH33 ATOI ON ACTIVE JOBSITE I OBSERVED BANNER W/TRAPS AROUND SWS PARAPET PANEL@EXP1 W/TRAPS ATTACED TO BEAMS,CROSS(ILLEGIBLE) UPRIGHT POST.UPON MY REQUEST WHE
Penalty: $1,250 · paid: $1,250
FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURES. NOTE: AT THE TIME OF INSPECTION RESPONDING TO A COMPLAINT OF PIECE OF SUSPENDED SCAFFOLD FELL INTO SITE. INSPECTION REVEALS THE ROLLER FROM THE SUSPENDED SCAFFOL
Penalty: $5,000 · paid: $5,000
FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE A WORKER FELL FROM A SCAFFOLD THAT COLLAPSED SUFFERING A LOWER BACK INJURY.THE WORKER WAS TRANSPORTED TO A HOSPITAL
Penalty: $1,250 · paid: $1,250
FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURES(UNSAFE SCAFFOLD). NOTEAT TIME OF MY INSPECTION OF 61 STY BLDG IN RESPONSE TO AN INCIDENT REPORTED WHERE ONE WORKER INJURED HIS BACK DURING CARPENTRY OPERATION WHE
FAILURE TO FILE ACCEPTABLE CYCLE 7B REPORT INDICATING CORRECTION OF UNSAFE CONDITION DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #700215 FILE ACCEPTABEL REPORT
BC33012-UNCAPED EXPOSED BOLTS AND COPPER PIPES.NOTE:AT THE TIME OF INSPECTION OBSERVED A 61 STORY BUILDING UNDER CONSTRUCTION AT ROOF LEVEL.WORKERS WORKING O IT.I ALSO OBSERVED UNCAPED EXPOSED BOLTS,COPPER PIPE
27-929.1 A.C. 27-929-1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDIN
FAILURE TO NOTIFY THE DEPARTMENT OF AN INDICNET THAT RESULTED IN A FATALITY OR INJURY NOTE ONE OWRKER FOREMAN WAS SLICED CUT BY ANOTHER CO WORKER WHILE REMOVING METAL STUDS WORKER WAS TAKEN TO THE HOSPITAL AS P
BC 3301.7 DOCUMENT TO BE KEPT ON SITE. AT THE TIME OF INSPECTION ON ANACTIVE JOBSITE CURRENTLY AT ROOF LEVEL,I OBSERVED TARPAULIN W/ TRAPS INSTALLED AROUND SIDEWALK SHED PARAPET WALLS,UPON MY REQUEST FOR DESIGN
Penalty: $620 · paid: $620
AT TIME OF INSPECTION INADEQUATE SAFETY MEASURES OPERATING TOWER CRANECD#5031 UNDER CN#669/17 RESPONDENT FAIL TO MAKE SURE SIGNAL PERSON BYRON GILES AND OPERATOR WILLIAM BEACH HMO LIC#5687 WERE COMMUNICATING W/
Penalty: $10,000 · paid: $10,000
@TIME OF INSP,INADEQUATE SAFETY MEASURES.OPERATING TOWER CRANE CD#3031UNDER CN#669/17.OPERATOR WILLIAM J BEACK LICE #5687 FAILED TO COMMUNICATE W/SIGNAL PERSON W/HARD WIRE COMMUNICATION AS PER CN 3RD PARTY CERT
Penalty: $10,000 · paid: $10,000
@TIME OF INSP,INADEQUATE SAFETY MEASURES OPERATIONS TOWER CRANE CD#5031 UNDER CN#669/17 LIFT DIRECTOR/SIGNAL PERSON BYRON GILES FAILED TO COMMUNICATE W/OPERATOR WILLIAM BEACH HMO LIC#5687 W/HARD WIRE COMMUNICAT
SEC. 3301.2 FAILURE TO MAINTAIN SAFETY OPERATIONS. NOTE: AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE,ANSWERING AN INCIDENT WHERE A WORKER ON SCISSOR LIFT DOING PACHING WORK ON THE CEILING,CHOPPED A BUCKET
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.AT THE TIME OF INSPECTION IT WAS OBSERVED THAT A WORKER WAS INJURED AT WORKING DECK 56 FLOOR. IT WAS OBSERVED THAT A PLYWOOD
28-103.8 MATTERS NOT PROVIDED FOR CONCRETE EMBEDDED SAFETY STRAPS. AT TIME OF INSPECTION ON A PROPOSED 61 STORY BUILDING AT 43 FLOOR LEVEL, OBSERVED SAFETY STRAPS IN PLACE ON VARIOUS FLOORS FROM FLOOR 42 AND
ESCAPE HATCHES. NOTE: AT THE TIME OF INSPECTION OF A 61 STORY BUILDINGAT 41 FLOOR LEVEL CONSTRUCTION WORK IN PROGRESS, THAT CONSIST OF CON CRETE POURING OPERATION REQUIRING HEATING EQUIPMENT/PORTABLE FUEL FIRE
Penalty: $2,500 · paid: $2,619
BC 3308.8 MODIFICATION AND ALTERNATIVE SYSTEMS.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29 FL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED A CLIMBING FORMWORK SYSTEM IN PLACE @ INTERIOR OF EXP#2
FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTION.NOTE: RESPONDING TO A REPORT OF A PARTIAL COLLAPSE AND MATERIAL FAILURE @ A 61 STY BUILDING @ 29TH FL LVL.INSPECTION REVEAL
28-401.4 ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITH A REQIURED LICENSE OR AUTHORIZATION.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDINH @ 29TH FL LEVEL CONSTRUCTION WORK IN PROGRESS.CURTAIN WAL
FAILURE TO FILE EVIDENCE OF COMPLIANCE WITH WORKERS COMP,LAW&OR DISABIILITY BENEFTITS.NOTE@THE TIME OF MY INSPECTION OF A 61 STY BUILDING @29TH FL LEVEL CONSTRUCTION WORK IN PROGRESS.I OBSERVED SUB CONTRACTOR
FAILURE TO SAFEGUARD ALL PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29THFL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED THAT THERE WERE CONCRE
Penalty: $5,000 · paid: $5,000
BC1704.10.1. SPECIAL INSPECTION.NOTE: @ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FLOOR LVL CONSTRUCTION WORK IN PROFRESS I OBSEVED CURTAIN WALL IN PLACE UP TO 10 FL LEVEL @ EXP#1,2,3,4 UPON REQUEST
BC3308.6 HORIZONTAL SAFETY NETTING SYSTEM.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED THAT THERE WERE NO HORIZONTAL NETTING IN PLACE @ EXP#3 INTE
FAILURE TO FILE EVIDENCE OF LIABILITY AND OR PROPERTY DAMAGE INSURANCENOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FL LVL CURTAIN WALL OPERATION UP TO 10 FL LEVEL CONSTRUCTION WORK IN PROGRESS
BC 3301.6 DESIGN, SIZES & CAPACITY OF MATERIALS,STRUCTURE,TEMPORARY CONSTRUCTION &EQUIPMENT.NOTE:@ THE TIME OF MY INSPECTION OF A 61 STY BUILDING @ 29TH FL LVL CONSTRUCTION WORK IN PROGRESS.I OBSERVED A MAKESHI
FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES &TEMPORARY CONSTRUCTION.NOTE:RESPONDING TO A REPORT OF A PARTIAL COLLAPSE AND MATERIAL FAILURE @ A 61 STY BUILDING @ 29TH FL LVL.INSPECTION REVEAL THAT
BC3301.2 FAILURE TO MAINTAIN(REBAR CAPS) AT TIME OF INSPECTION OF NEW 61 STORY BUILDING ACTIVE JOBSITE. I OBSERVED UNCAPPED REBARS AT EXPO#3AND AT DIFFERENT LOCATIONS THROUGHOUT SIDE. THIS CONDITION CREATES A H
WORK DOES NOT CONFORM TO SITE SAFETY PLAN(YODOK SYSTEM) AT TIME OF INSPECTION OF NEW 61 STORY BUILDING ACTIVE JOBSITE CURRENTLY AT 11 STORY.I OBSERVED YODOK SYSTEM NOT IN STRAIGHT LINE AND NOT FILLED WITH WATER
Penalty: $250 · paid: $250
SEC: BC 3301.2. FAIL TO MAINTAIN SAFE OPERATIONS. @ TIME OF INSP OF AN ACTIVE SITE, CONSTRUCTION WORK IN PROGRESS, RESPONDING TO THE COMPLAINT# 1479448 WHERE AN INCIDENT WERE REPORTED. THE INCIDENT OCCURED WHEN
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.ABOVE RESPONDENT GC ERECTED TOWER CRANE CD #5031 CN#66917 NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.CRANS WAS ERE
Penalty: $500 · paid: $500
INADEQUATE SAFETY-MEASURES.OPERATION OF CRANE HOISITNG EQUIPMENT IN UNSAFE MANNER.ABOVE GC RESPONDENT SUPERVISED /ERECTED TOWER CRANE CD#5031 CDN#66717 NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.THI
INADEQUATE SAFETY MEASURES-OPERATION OF CRANE HOISTING EQUIPMENT IN UNSAFE MANNER.ABOVE RESPONDENT/USER ERECTED TOWER,CRANE CD5031 CN #66917NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.THIS ELECTRICAL
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS ABOVE USER/RESPONDENT ERECTED TOWER CRANE CD 5031 CN#66917 NOT ACCORDING TO APPROVED 3RD PARTY AND ERECTION PLANS.CRANE WAS ER
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. 8'HIGH PLYWOOD CON STRUCTION FENCE HAS GAP APPROX 8'HIGH X 3'WIDE MAKING SITE ACCESSIBLE TO PUBLIC. RMDY: REPAIR FENCE.
Penalty: $800
FAILURE TO POST PERMIT FOR WORK AT PREMISES.NOTED:CONSTRUCTION FENCE ERECTED UNDER JOB#140097295 AND NO PERMIT POSTED. RMDY: POST PERMIT.
Penalty: $400 · paid: $400
FAILURE TO TAKE REQUIRED ACTION TO SECURE PUBLIC SAFETY-UNSAFE FACADE.*NOTED:A FAISP3-NOTIFICATION OF UNSAFE CONDITIONS FORM WAS FILED W/THE"DEPT" ON 11/16/12 & NO SAFETY MEASURES HAVE BEEN INSTALLED.RMDY:IMMED
Penalty: $2,400 · paid: $1,800
FAILURE TO MAINTAIN. NOTED: UPON INSPECTION METAL SHUTTER HANG OFF OF 3 STORY WINDOW NOT REPAIRED OR TAKEN OFF. PREVIOUS VIOLATION NOT COMPLIED W/#34934810M. REMEDY: REPAIR OR REMOVE.
Penalty: $1,000 · paid: $1,000
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A C/C W/THE DOB. DEFECT NOTED: AT TIME OF INSPECTION NO C/C FILED FOR ECB NOV #34934810M DATED: 12.30.11. REMEDY: FILE A C/C.
Penalty: $800 · paid: $800
FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH ARTICLE 28-302 OF THE BUILDING CODE & DOB RULES & REGULATIONS.36017730R. RESPONDENT HAS DEMOSTRATED A HISTORY OF NON-COMPLIANCE WITH
Penalty: $10,000 · paid: $1,000
ECB Violations (6bgk-3dad), NYC Open Data. As of October 26, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 26, 2026.
What are you trying to do here?
Public records for 130 WILLIAM STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 26, 2026.