Built in 2005, 202 residences across 37 floors.
15 Central Park West, 10023
15 Central Park West was designed by Robert A. M. Stern Architects and clad in Indiana limestone. It is two connected buildings holding 202 residences: the House, nineteen storeys fronting Central Park West, and the Tower, thirty five storeys set back along Broadway.
The two are not variants of one plan. The House is the low wide block facing the park, the Tower the slim one behind it, and they have different floor plates, different exposures and different proportions of window to wall. Which of the two an apartment sits in governs its light and its geometry, and a scheme drawn for one does not transfer to the other.
The limestone matters as much as the massing. This is a stone building with punched openings, so the wall between windows is solid and continuous, there is usable wall in every room, and the acoustic and thermal work is not thrown entirely onto soft materials the way it is in a glass tower. The building was drawn in deliberate reference to the pre-war houses further up the park, the San Remo and the Beresford among them, and it behaves like them indoors.
Within walking distance
Building facts
Built
2005
Floors
37
Residences
202
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1011147503.
Public records show 15 CENTRAL PARK WEST was built in 2005 and rises 37 floors with 229 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
231
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1011147503. Violations and permits as of October 27, 2026.
50 filings in the last 24 months, 1 open violation, last filing Aug 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Remove existing dropped ceiling and lighting in living room, dining room and foyer. Install new LED light coves and dropped soffits in living/dining room, foyer. Minimal partition work. No change in use, egress or occupancy. Unit 28B.
Filed estimated cost: $200,000 (as filed, not verified)
Remove existing dropped ceiling and lighting in living room, dining room and foyer. Install new LED light coves and dropped soffits in living/dining room, foyer. Minimal partition work. No change in use, egress or occupancy. Unit 28B.
Filed estimated cost: $200,000 (as filed, not verified)
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
Use of temporary hoisting equipment as per plans filed herewith.
Filed estimated cost: $5,000 (as filed, not verified)
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $85,000 (as filed, not verified)
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $149,996 (as filed, not verified)
General Construction work as shown on plans filed herewith.
Filed estimated cost: $280,000 (as filed, not verified)
AT 1ST FLOOR TENANT SPACE, REMOVAL OF THE EXISTING SPRINKLER HEADS AND RELATED PIPING AND INSTALLATION OF TEMP LOOP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Filed estimated cost: $10,000 (as filed, not verified)
AT 1ST FLOOR TENANT SPACE, REMOVAL OF THE EXISTING RESTROOM, PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Filed estimated cost: $8,000 (as filed, not verified)
AT 1ST FLOOR TENANT SPACE, REMOVAL OF HVAC DUCTWORK, PIPING, CONTROLS, AND AC UNITS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Filed estimated cost: $10,000 (as filed, not verified)
AT 1ST FLOOR TENANT SPACE, REMOVAL OF EXISTING PARTITIONS, CEILINGS, LIGHTING, AND FINISHES AS PER PLANS FILED HEREWITH.
Filed estimated cost: $40,000 (as filed, not verified)
Installation of contractor's shanty on existing sidewalk shed as per plan and in accordance with Chapter 33 of NYC Building Code. Existing sidewalk shed filed under application M01256018 by others. No change in use, egress, or occupancy.
Filed estimated cost: $13,000 (as filed, not verified)
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
Filed estimated cost: 0 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW PLUMBING FIXTURES AND ALL ASSOCIATED PIPING, NEW ELECTRIC WATER HEATER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $546,000 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW FIRE HOSE CABINETS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $78,000 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $156,000 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW FIRE HOSE CABINETS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $78,000 (as filed, not verified)
AT SUBCELLAR, INSTALLATION OF NEW PLUMBING FIXTURES AND ALL ASSOCIATED PIPING, NEW ELECTRIC WATER HEATER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $364,000 (as filed, not verified)
AT SUBCELLAR, INSTALLATION OF NEW AC UNITS AND ASSOCIATED DUCTWORK AND PIPING, SUPPLEMENTAL AC UNIT TO SERVE IT ROOM, AND NEW OUTSIDE AIR AND EXHAUST FANS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATIO
Filed estimated cost: $1,300,000 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, INSTALLATION OF NEW AC UNITS AND ASSOCIATED DUCTWORK AND PIPING, SUPPLEMENTAL AC UNIT TO SERVE IT ROOM, AND NEW OUTSIDE AIR AND EXHAUST FANS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATIO
Filed estimated cost: $1,950,000 (as filed, not verified)
AT SUBCELLAR, INSTALLATION OF NEW FIRE HOSE CABINETS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $52,000 (as filed, not verified)
AT SUBCELLAR, INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $104,000 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, INSTALLATION OF BEAM AND COLUMN SUPPORT, ADDITIONAL HEADERS, CONCRETE SLAB SUPPORT FOR WATER HEATERS, AND STRUCTURAL SUPPORT FOR 2 INTERIOR CONVENIENCE STAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR
Filed estimated cost: $390,000 (as filed, not verified)
AT SUBCELLAR, INSTALLATION OF BEAM AND COLUMN SUPPORT, ADDITIONAL HEADERS, CONCRETE SLAB SUPPORT FOR WATER HEATERS, AND STRUCTURAL SUPPORT FOR 2 INTERIOR CONVENIENCE STAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR
Filed estimated cost: $260,000 (as filed, not verified)
AT SUBCELLAR, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILINGS, FINISHES, MILLWORK, AND INTERIOR CONVENIENCE STAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $3,120,000 (as filed, not verified)
AT CELLAR AND 1ST FLOOR, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILINGS, FINISHES, MILLWORK, AND INTERIOR CONVENIENCE STAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPNACY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $4,680,000 (as filed, not verified)
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $10,000 (as filed, not verified)
Minor renovation of existing bank branch, including new partitions, new door and associated finishes. No change in use, egress or occupancy.
Filed estimated cost: $65,400 (as filed, not verified)
SUBSEQUENT APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 5TH FLOOR (APT 5A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $87,000 (as filed, not verified)
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 5TH FLOOR (APT 5A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Filed estimated cost: $267,640 (as filed, not verified)
SUBSEQUENT APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 5TH FLOOR (APT 5A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $9,000 (as filed, not verified)
SUBSEQUENT APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 5TH FLOOR (APT 5A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $99,000 (as filed, not verified)
Installation of suspended scaffold for facade inspection/repair.
Filed estimated cost: 0 (as filed, not verified)
SUBSEQUENT APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 5TH FLOOR (APT 5A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $99,000 (as filed, not verified)
Interior renovation proposed for an existing penthouse. PAA filed for omission of Fire-Resistant Penetration and Joints as a special inspection No change to use, occupancy or egress.
Filed estimated cost: $2,370,000 (as filed, not verified)
Interior renovation proposed for an existing penthouse. PAA filed for omission of Fire-Resistant Penetration and Joints as a special inspection No change to use, occupancy or egress.
Filed estimated cost: $2,370,000 (as filed, not verified)
Replacement of HVAC system for an existing penthouse. No change of use, occupancy or egress.
Filed estimated cost: $108,000 (as filed, not verified)
Replacement of HVAC system for an existing penthouse. No change of use, occupancy or egress.
Filed estimated cost: $108,000 (as filed, not verified)
Replacement of HVAC system for an existing penthouse. No change of use, occupancy or egress.
Filed estimated cost: $108,000 (as filed, not verified)
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE AT BROADWAY ELEVATION.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE AT BROADWAY ELEVATION.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM AT THE CELLAR BELOW THE STAIRS WITH SCAFFOLD DRAWINGS WITH STAIR TOWER AND GUARD RAILS.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM AT THE CELLAR BELOW THE STAIRS WITH SCAFFOLD DRAWINGS WITH STAIR TOWER AND GUARD RAILS.
Filed estimated cost: $1,000 (as filed, not verified)
General facade repair filing includes exterior sealant replacement, terrace door sills seal, limestone repair & replacement, limestone dutchman installation, rout limestone cracks, reseal parapets, resecure loose railing and assist in water testing.
Filed estimated cost: $615,627 (as filed, not verified)
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Filed estimated cost: $1,000 (as filed, not verified)
AT SUBCELLAR, CELLAR, AND 1ST FLOOR, THE REMOVAL OF THE EXISTING SPRINKLER SYSTEM. AT SUBCELLAR AND CELLAR INSTALLATION OF TEMPORARY SPRINKLER SYSTEM. AT FIRST FLOOR, INSTALLATION OF NEW SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCU
Filed estimated cost: $75,000 (as filed, not verified)
New reinforced concrete pad to repair and support existing storefront steel frame as shown in drawings filed herewith.
Filed estimated cost: $55,000 (as filed, not verified)
Repair entrance door as shown in drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $30,000 (as filed, not verified)
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been closed. If the condition still exists, please file a new complaint.
10 complaints total.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
DELETED BY ESE ON 08/10/2009 BECAUSE ENTERED AT WRONG ADDRESS
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
CIANOW CRM Violation Dismissed · disposed Jan 3, 2022
FAILURE TO PERFORM CATEGORY 5 INSPECTION
CAT5 2014 FAILURE TO FILE,PENALTY PAID. · disposed Jul 29, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
ACC1 PENALTY PAID · disposed Jul 15, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CAT 1 FILED 2014 INSPECTION · disposed Nov 27, 2016
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Oct 16, 2017
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 7, 2014
PPN203 AOC SUB ON 06/28/17 BY:EXCEL ELEV & ESC ROBERT BELCHER, CERT#501003 · disposed Aug 3, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 21, 2015
PVT: SATISFIED BY ISSUANCE OF FINAL CERT FOR EA/EBN · disposed Apr 1, 2014
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 5, 2014
2010 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
LL1081 PENALTY PAID IN FULL/1P45873 · disposed Mar 19, 2012
PPN203 AOC SUB ON 011112 BY THYSSENKRUPP ELEVA INSP. J CARLO CERT#083058 · disposed Mar 20, 2012
PPN203 AOC SUB ON 01/25/2011 BY THYSSENKRUPP ELEV., LARRY STIMPFEL, CERT #083- · disposed Apr 6, 2011
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#083055 · disposed May 12, 2010
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#083055 · disposed May 12, 2010
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#083055 · disposed May 12, 2010
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#083055 · disposed May 12, 2010
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#$083055 · disposed May 12, 2010
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC ELEV INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC ELEV INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVY CERT#466007 · disposed Oct 21, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC ELEV INSP T.DUNLEAVY CERT#466007 · disposed Oct 21, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC ELEV INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC INSP T.DUNLEAVYH CERT#466007 · disposed Nov 4, 2009
PPN203 AOC SUB ON 102209 BY FUJITEC ELEV INSP T.DUNLEAVY CERT#466007 · disposed Nov 4, 2009
KDA OLD BUILDING DEMO - NEW BUILDING NOT REQUIRED TO FILE IN CYCLE 6 · disposed Apr 9, 2008
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#083055 · disposed May 12, 2010
PPN203 AOC SUB ON 032410 BY THYSSENKRUPP ELEV INSP R.CINCOTTA CERT#083055 · disposed May 12, 2010
CW · disposed May 2, 2007
CMQ BUILDING DEMOLISHED SIGNED OFF 08/22/05 #104108733. · disposed Mar 13, 2007
PPN203 BUILDING DEMOLISHED DM #104108733 S/O 08/22/05 · disposed Apr 19, 2007
PPN203 DEVICE REMOVED DEMO#104108733 S/O 8/22/05 · disposed Oct 30, 2006
PPN203 DEVICE REMOVED DEMO#104108733 S/O 8/22/05 · disposed Oct 30, 2006
PPN203 DEVICE REMOVED DEMO#104108733 S/O 8/22/05 · disposed Oct 30, 2006
PPN203 DEVICE REMOVED DEMO#104108733 S/O 8/22/05 · disposed Oct 30, 2006
PPN203 DEVICE REMOVED DEMO#104108733 S/O 8/22/05 · disposed Oct 30, 2006
PPN203 BUILDING DEMOLISHED DM #104108733 S/O 8/22/05 · disposed Apr 19, 2007
PPN203 BUILDING DEMOLISHED DM# 104108733 S/O 8/22/05 · disposed Apr 19, 2007
IRICIA DISMISSED FULL PENALTY PAID $1500 CK# 3400101688 INV# 60409626 · disposed Feb 17, 2004
IRICIA DISMISSED FULL PENALTY PAID $1500 CK# 3400101688 INV# 60409626 · disposed Feb 17, 2004
IRICIA DISMISSED FULL PENALTY PAID $1500 CK# 3400101688 INV# 60409626 · disposed Feb 17, 2004
IRICIA DISMISSED FULL PENALTY PAID $1500 CK# 3400101688 INV# 60409626 · disposed Feb 17, 2004
1P15062
AS PER INSPECTOR ROUTE SHEET · disposed Feb 9, 2003
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 100004481 HAS BEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER,1,2016.REM:FILE ANNUAL CERT
Penalty: $1,000 · paid: $1,000
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 100004479 HAS BEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER,1,2016.REM:FILE ANNUAL CERT
Penalty: $1,000 · paid: $1,000
SEC. 3307.6.4.10 FOLLOWING. INSUFFICIENT SUPPORT SURFACE FOR SIDEWALK SHED. NOTED: AT TIME OF INSPECTION SEVERAL VETICAL POSTS FOR SIDEWALK SHED ON W 62 ST SIDE INSTALLED ON TOP OF SIDEWALK GRILL WHICH DOES NOT
NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED BY AUTHORIZED PERSON AT SITE. - FOREMAN ON SITE. - MAN SUSPENDED IN 1 MAN BASKET OFF OUTRIGGER. - NO DAILY LOG ON SITE AT TIME OF INSPECTION. REMEDY
Penalty: $2,400 · paid: $2,400
3314.6.3)LIFELINES,TIEBACKS,& SUSPENSION.ROPES SHALL EACH BE ATTACHED TO A DIFFERENT POINT OF ANCHORAGE.2 TIE BACKS FOR OUTRIGGER BEAMS & 3 LIFELINES TIED TO THE SAME DOUBLE LOOPED CABLE.COMPLY W/ CODE.PARTIAL
Penalty: $1,600 · paid: $1,600
68M7.81M07.80B14.40M PROVIDE FIRE EXTINGUISHER IF M/R 42N REMOVE JUMPER TERMIONAL 06 & 7 16B ADJUST DOOR OPENING ON 26.31.35.FL 08R REPAIR GROUT 17 AND 20 FL SADDLE IN FRONT OF HOISTWAY DOOR 80B SHORTEN CWT ROP
Penalty: $500 · paid: $547
FAIL TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & DOB RULES AND REGULATIONS. REMEDY:
FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED.AS NOTED:DEMOLITION OPERATION IN PROGRESS,HOWEVER NO SITE SAFETY MANAGER PRESENT ON SITE.STOP ALL WORK REMEDY:MAINTAIN SITE SAFETY MANAGER AT ALL TIMES AS
Penalty: $2,000 · paid: $2,000
FAILURE TO PROEPRTY STORE COMBUSTABLE MATERIALS AND EQUIPMENT DURING DEMOLITION OPERATIONS AS NOTED:EXCESSIVE AMOUNT OF COMBUSTIBLE DEBRIS STORED IN VARIOUS ROOMS ROOMS AND CLOSETS ON 12TH THROUGHOUT NOETH & SO
Penalty: $1,000 · paid: $1,000
NO PERMIT FOR USE & STORAGE OF ACETYLYNE & OXYGEN TANKS FROM FIRE DEPTOXYGEN WERE STORED ON 1ST FLOOR, SEVERAL TANKS APPROX 6 WITHOUT PERMITFROM FIRE DEPT. REMEDY: STOP STORAGE AND USE. OBTAIN PERMIT.
Penalty: $500 · paid: $500
WORK W/O PERMIT. SCAFFOLD WAS BUILT ON TOP OF SIDEWALK SHED (OVER 75 FT.), HOWEVER, AS PER DOB RECORDS NO PERMIT WAS ISSUED. REMEDY: OBTAIN PERMIT.
Penalty: $2,500 · paid: $2,500
FAILURE TO NOTIFY THE DEPT. PRIOR TO COMMENCEMENT OF DEMOLITION. ASNOTED,NO 24 HR. NOTICE RECEIVED BY THE DEPT. REMEDY: NOTIFY DEPT.
Penalty: $500 · paid: $500
NO ELEVATOR IN READINESS.AS NOTED, DEMOLITION IN PROGRESS @ 15TH FL.,HOWEVER, THERE'S NO ELEVATOR IN READINESS FOR FIRE DEPT.USE. & NO VARIANCE APPROVED BY FIRE DEPT.TO USE NORTH BLDG. ELEV.(17 CENTRAL PK. WEST
Penalty: $1,000 · paid: $1,000
FAILURE TO COMPLY WITH SITE SAFETY PROGRAM/PLAN.DEMO.IN-PROGRESS @ ABOVE ADDRESS AND THE BLDG IS DOWN 15TH FLR. AT THE TIME BUT NO SITE SAFETY PLAN/PROGRAM SUBMITTED @ DOB OR BEST SQUAD. "STOP ALL WORK"REMEDY:
Penalty: $1,000 · paid: $1,000
FAILURE TO HAVE SITE SAFETY MGR. PRESENT AS REQUIRED. AS NOTED,NO SITE SAFETY MGR. PRESENT @ THE TIME. REMEDY:PROVIDE/MAINTAIN SITE SAFETY MGR.
Penalty: $2,000 · paid: $2,000
DESIGN REQUIRED. UPON INSP. SIDEWALK SHED ERECTED WITH PIPE SCAFFOLDING ON TOP. SCAFFOLDING APPROX 90 FT IN HIGHT FOR APPROX. 100'ALONG CENTRAL PARK WEST AND 90'HIGH AND 75'ALONG W 61 ST. NO DESIGN DRAWING ON
Penalty: $500 · paid: $500
SIDEWALK SHED NOT TO BLD. CODE STANDARDS SHED PERMIT #103975673. UPON INSPECTION SIDEWALK SHED DOES NOT EXTEND CODE DISTANCE BLD IS 15 STORIES HIGH 100' PLUS 75 IN HIGHT SHED ALONG CENTRAL BARK WEST DOES NOT
Penalty: $2,000 · paid: $2,000
POSTING OF PERMITS. UPON INSPECTION PERMIT FOR SIDEWALK SHED NOT POSTED. SIDEWALK SHED HAS BEEN ERECTED ALONG CENTRAL PARK WEST APPROX 100' AND APPROX 75'ALONG W 61 ST SIDE.NO PERT POSTED SHED PERMIT #103975673
Penalty: $250 · paid: $250
09H11/03H11/36D09/84W07/59M07 09-REPAIR CAR FLOOR 03-REPLACE CAR SADDLE 36-REMOVE ALL WIRING IN OVER HEAD SACH & TOP OF HOISTWAY NOT RELATEDTO OPERATION OF ELEVATORS 84-ELIMINATE NOISE AT TOP OF HOISTWAY RUNNI
Penalty: $180 · paid: $180
19M07. 19-PROVIDE ALL MISSING INTER COCH COVERS FLOORS B TO 18.
9M07. PROVIDE ALL MISSING INTERLOCK COVERS FLOORS B TO 17.
9M07. PROVIDE ALL MISSING INTERLOUC COVERS FLOORS B TO 17.
19M07. 19-PROIVDE ALL MISSING INTERLOCK COVERONS FLOORS B TO 18.
16H12. REPLACE SOOR GIBBS. 16FL 17FL 18 FLOOR.
Penalty: $350 · paid: $350
39H11. REGROOVE TRACTION MACHINE.
Penalty: $350 · paid: $350
74B11. REPAIR INTERCOM SUSTEM IN ELEVATOR.
Penalty: $350 · paid: $350
73O02,40B09,50Y11,30O02.40B REMOVE NOISE GOVERNOR.CLEAN ENTIRE INSTALLATION.
16H12,73O02,30O02,35O02.CLEAN ENTRIE INSTALLATION.
30O02,50O02,35O02,73O02,46K12.CLEAN ENTIRE INSTALLATION.
50Y02,30O02,35O02,73O02.73-CLEAN ENTIRE INSTALLATION.
74#. PROVIDE SAFE AND CONVENIENT ACCESS TO OVERHEAD SHEAVE ROOM.
Penalty: $100 · paid: $100
05L,15J,18J,20L,74J. 74 ADJUST MANUAL SWITCH IN CAR.
05L,15J,18J,20L.
46H.
50F
39H
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 15 CENTRAL PARK WEST, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.