150 East 58th Street
Around 40 kitchen, bath and tile showrooms, open to the public on weekdays.
150 East 58th Street, 10155
ALSO KNOWN AS The A&D Building
150 East 58th Street is the Architects and Designers Building, a tower of 1968 running to thirty nine floors, with the design showrooms occupying the lower part of it. Around forty showrooms trade here, weighted towards kitchens, bathrooms, appliances, tile, flooring and shading rather than towards furniture and textiles.
The building is open to the public, Monday to Friday, and says so without qualification. That is the difference from the D&D three blocks away, and it is the reason to send a client here first when the decision is a kitchen or a bathroom rather than a sofa.
Appliances, cabinetry, tile and stone are specified against each other rather than in sequence, and getting them into the same morning is the difference between a coherent specification and four that were each chosen well alone. A client who has seen one appliance line in a suburban showroom has not made a comparison.
Holly Hunt keeps a second New York showroom here alongside its D&D suite, and Poliform trades here as well as on Madison Avenue, so a few houses can be seen in either building.
An open door changes who the building is for. A designer loses nothing by it, and a homeowner gains the ability to do the early looking without an appointment and without an account, which is the part of a project where most of the wrong decisions get made.
Who trades here
The showrooms and galleries in this building that the guide covers. Not the full tenant list.
Within walking distance
Public records show 150 EAST 58 STREET was built in 1968 and rises 39 floors (NYC MapPLUTO, version 26v2). No HPD violations are recorded for this lot (NYC Open Data, as of October 30, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Last altered
2013
Total units
144
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1013120041. Violations and permits as of October 30, 2026.
27 filings in the last 24 months, last filing Jun 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
HEREWITH FILING MODIFICATION TO EXISTING MECHANICAL SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATIONS OF 11TH FLOOR RESTROOM AND CORRIDOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $33,300 (as filed, not verified)
CORRIDOR AND RESTROOM RENOVATION WORK TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITION, CEILING, FINISHES AND DOOR WORK AS INDICATED ON PLANS FILED HEREWITH .NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Filed estimated cost: $134,000 (as filed, not verified)
HEREWITH FILING MODIFICATION TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATIONS OF 11TH FLOOR RESTROOM AND CORRIDOR.
Filed estimated cost: $5,000 (as filed, not verified)
PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH IN CONJUNTION WITH INTERIOR RENOVATIONS OF 11TH FLOOR RESTROOM AND CORRIDOR.
Filed estimated cost: $14,900 (as filed, not verified)
Construction work on the 11th floor (Tai Ping Edward Fields showroom as indicated on drawings.
Filed estimated cost: $1,999,982 (as filed, not verified)
Structural work on the 11th floor (Tai Ping Edward Fields showroom) as indicated on drawings.
Filed estimated cost: $72,452 (as filed, not verified)
Mechanical work on the 11th floor (suite 1101-Tai Ping/Edward Fields showroom) as indicated on drawings.
Filed estimated cost: $134,948 (as filed, not verified)
Plumbing work on the 11th floor (Tai Ping Edward Fields showroom) as indicated on drawings.
Filed estimated cost: $35,000 (as filed, not verified)
Sprinkler work on the 11th floor (Tai Ping Edward Fields showroom) as indicated on drawings.
Filed estimated cost: $54,999 (as filed, not verified)
Suspended Scaffold Installation for Facade Restoration and Inspection
Filed estimated cost: 0 (as filed, not verified)
Mechanical work on the 5th floor (Sub-Zero) as indicated on drawings
Filed estimated cost: $406,190 (as filed, not verified)
Sprinkler work on the 5th floor (Sub-Zero) as indicated on drawings.
Filed estimated cost: $52,200 (as filed, not verified)
Plumbing work on the 5th floor (Sub-Zero) as indicated on drawings.
Filed estimated cost: $165,440 (as filed, not verified)
Plumbing work on the 5th floor (Sub-Zero) as indicated on drawings.
Filed estimated cost: $165,440 (as filed, not verified)
Construction work on the 5th floor (Sub-Zero) as indicated on drawings.
Filed estimated cost: $1,720,559 (as filed, not verified)
Mechanical work associated with relocating demising wall on the 11th floor as indicated on drawings
Filed estimated cost: $4,900 (as filed, not verified)
Architectural changes associated with relocating demising wall on the 11th floor as indicated on drawings.
Filed estimated cost: $12,700 (as filed, not verified)
Sprinkler work on the 23rd floor (LLW Michele Gerson) as indicated on drawings.
Filed estimated cost: $4,000 (as filed, not verified)
Construction work on the 23rd floor (LLW Michelle Gerson) as indicated on drawings
Filed estimated cost: $105,000 (as filed, not verified)
Plumbing work on the 23rd floor (LLW Michelle Gerson) as indicated on drawings.
Filed estimated cost: $19,763 (as filed, not verified)
Mechanical work on the 23rd floor (LLW Michelle Gerson) as indicated on drawings.
Filed estimated cost: $9,800 (as filed, not verified)
Mechanical modifications to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $134,521 (as filed, not verified)
Plumbing modifications to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $133,135 (as filed, not verified)
Sprinkler modifications to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $37,256 (as filed, not verified)
General construction to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $1,731,783 (as filed, not verified)
Sprinkler work on the 14th floor (Gameday Men's Health) as indicated on drawings
Filed estimated cost: $10,000 (as filed, not verified)
Plumbing work on the 14th floor (Gameday Men's Health) as indicated on drawings.
Filed estimated cost: $34,500 (as filed, not verified)
23 earlier filings, 2024
Architectural work on the 14th floor (Gameday Men's Health) as indicated on drawings.
Filed estimated cost: $111,500 (as filed, not verified)
Mechanical work on the 14th floor (Gameday Men's Health) as indicated on drawings.
Filed estimated cost: $37,500 (as filed, not verified)
Plumbing work on the 28th floor (prebuild) as indicated on drawings.
Filed estimated cost: $27,000 (as filed, not verified)
Sprinkler work on the 28th floor (prebuild) as indicated on drawings.
Filed estimated cost: $18,000 (as filed, not verified)
Plumbing work on the 29th floor (Moulinos & Levinas) as indicated on drawings.
Filed estimated cost: $22,000 (as filed, not verified)
Sprinkler work on the 29th floor (Moulinos & Levinas) as indicated on drawings.
Filed estimated cost: $11,500 (as filed, not verified)
Mechanical work on the 29th floor (Moulinos & Levinas) as indicated on drawings.
Filed estimated cost: $23,000 (as filed, not verified)
Construction work on the 29th floor (Moulinos & Levinas) as indicated on drawings.
Filed estimated cost: $121,000 (as filed, not verified)
Demolition of non-bearing partitions on the 14th floor as indicated on drawings.
Filed estimated cost: $2,393 (as filed, not verified)
Propose to perform a Tenant Fit out work as shown on the plans new flooring, lighting and power outlets at the existing showroom on 9th floor. No partition walls. Existing HVAC and Sprinkler system shall remain intact. No changes in use and occupancy
Filed estimated cost: $85,000 (as filed, not verified)
Interior demolition of non load bearing partitions on the 28th floor as indicated on drawings.
Filed estimated cost: $16,525 (as filed, not verified)
Interior demolition of non load bearing partitions on the 29th floor as indicated on drawings.
Filed estimated cost: $15,675 (as filed, not verified)
Interior demolition of non load bearing partitions and demising wall on the 3rd floor as indicated on drawings.
Filed estimated cost: $16,875 (as filed, not verified)
Plumbing work on the 7th floor (Bosch showroom expansion) as indicated on drawings.
Filed estimated cost: $33,000 (as filed, not verified)
Mechanical work on the 7th floor (Bosch showroom expansion) as indicated on drawings
Filed estimated cost: $29,990 (as filed, not verified)
Sprinkler work on the 7th floor (Bosch showroom expansion) as indicated on drawings.
Filed estimated cost: $11,000 (as filed, not verified)
Architectural work on the 7th floor (Bosch showroom expansion) as indicated on drawings. EN drawings for lighting submitted under M01025354-I1
Filed estimated cost: $399,992 (as filed, not verified)
Mechanical work on the 4th floor (Cuzine Kitchen) as indicated on drawings.
Filed estimated cost: $24,966 (as filed, not verified)
Plumbing work on the 4th floor (Cuzine Kitchen ) as indicated on drawings
Filed estimated cost: $30,000 (as filed, not verified)
Construction work on the 4th floor (Cuzine Kitchen) as indicated on drawings. EN drawings for lighting are submitted under M01021535-I1.
Filed estimated cost: $224,968 (as filed, not verified)
Sprinkler work on the 4th floor (Cuzine Kitchen) as indicated on drawings
Filed estimated cost: $20,000 (as filed, not verified)
Florense Demise - Construction work on the 3rd floor as indicated on drawings
Filed estimated cost: $62,000 (as filed, not verified)
Florense Demise - Sprinkler work on the 3rd floor as indicated on drawings
Filed estimated cost: $5,000 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Recorded documents
ACRIS · NYC Department of Finance
Party 2: VORNADO RTR, INC.
Party 1: VORNADO REALTY L.P.
ACRIS document ID: 2026030400817001 · Search ACRIS
Party 1: LEVEL 3 COMMUNICATIONS LLC
Party 2: CENTURY LINK INC.
ACRIS document ID: 2017122900276001 · Search ACRIS
5 individual parties not shown
ACRIS document ID: 2016070100930003 · Search ACRIS
5 individual parties not shown
ACRIS document ID: 2016070100930004 · Search ACRIS
Party 2: 962 THIRD AVENUE ASSOCIATES LLC
2 individual parties not shown
ACRIS document ID: 2016070100930001 · Search ACRIS
Party 2: 962 THIRD AVENUE ASSOCIATES LLC
2 individual parties not shown
ACRIS document ID: 2016070100930002 · Search ACRIS
Party 2: HAIER US APPLIANCE SOLUTIONS, INC.
Party 1: GENERAL ELECTRIC COMPANY
ACRIS document ID: 2016060700826001 · Search ACRIS
Party 2: 962 THIRD AVENUE ASSOCIATES LLC
6 individual parties not shown
ACRIS document ID: 2014102700543001 · Search ACRIS
Party 1: MACQUARIE NEW YORK PARKING 2, LLC
Party 2: CITIZENS ICON HOLDINGS, LLC
Party 1: MACQUARIE NEW YORK PARKING 2, LLC
Party 2: CITIZENS ICON HOLDINGS, LLC
ACRIS document ID: 2014102301202001 · Search ACRIS
Party 1: MACQUARIE NEW YORK PARKING 2, LLC
Party 2: CITIZENS ICON HOLDINGS, LLC
Party 1: MACQUARIE NEW YORK PARKING 2, LLC
Party 2: CITIZENS ICON HOLDINGS, LLC
ACRIS document ID: 2014102301202001 · Search ACRIS
4 individual parties not shown
ACRIS document ID: 2013121600812001 · Search ACRIS
Party 1: VORNADO REALTY L.P.
Party 2: MERCHANDISE MART HOLDCO LLC
1 individual party not shown
ACRIS document ID: 2010052600926001 · Search ACRIS
4 individual parties not shown
ACRIS document ID: 2010040800792001 · Search ACRIS
3 individual parties not shown
ACRIS document ID: 2009100700576003 · Search ACRIS
Party 2: HOLLY HUNT ENTERPRISES, INC.
1 individual party not shown
ACRIS document ID: 2009100100999001 · Search ACRIS
3 individual parties not shown
ACRIS document ID: 2008100900320001 · Search ACRIS
Party 2: ELI ACQUISITION LLC
Party 1: MCI, INC, ON BEHALF OF ITS FORMER SHAREHOLDERS
Party 1: SHAREHOLDERS OF MCI INC
Party 1: SHAREHOLDERS OF MCI INC.
Party 1: MCI, INC., ON BEHALF OF ITS FORMER SHAREHOLDERS
Party 2: ELI ACQUISITION LLC
ACRIS document ID: 2006121901803001 · Search ACRIS
Party 2: ELI ACQUISITION LLC
Party 1: MCI, INC, ON BEHALF OF ITS FORMER SHAREHOLDERS
Party 1: SHAREHOLDERS OF MCI INC
Party 1: SHAREHOLDERS OF MCI INC.
Party 1: MCI, INC., ON BEHALF OF ITS FORMER SHAREHOLDERS
Party 2: ELI ACQUISITION LLC
ACRIS document ID: 2006121901803001 · Search ACRIS
Party 1: 150 E. 58TH ST. PARTNERS, L.P.
Party 1: 250 BROADWAY ASSOCIATES CORP.
1 individual party not shown
ACRIS document ID: FT_1230006225923 · Search ACRIS
Party 1: 150 E. 58TH ST. PARTNERS, L.P.
1 individual party not shown
ACRIS document ID: FT_1300006224730 · Search ACRIS
Party 1: 150 E. 58TH ST. PARTNERS, L.P.
1 individual party not shown
ACRIS document ID: FT_1390006224739 · Search ACRIS
Party 1: 150 E. 58TH ST. PARTNERS, L.P.
Party 2: BROADWAY CORP.
2 individual parties not shown
ACRIS document ID: FT_1880006225888 · Search ACRIS
Party 1: 150 E. 58TH ST. PARTNERS, L.P.
Party 1: 250 BRAODWAY ASSOCIATES CORP.
1 individual party not shown
ACRIS document ID: FT_1300006199130 · Search ACRIS
Party 1: 250 BROADWAY ASSOCIATES CORP.
Party 1: 150 E. 58TH ST. PARTNERS L.P.
1 individual party not shown
ACRIS document ID: FT_1860006200586 · Search ACRIS
Party 1: 150 E. 58TH ST. PARTNERS, L.P.
1 individual party not shown
ACRIS document ID: FT_1710005694271 · Search ACRIS
Party 1: 150 E. 58TH ST. PRTNERS, L.P.
1 individual party not shown
ACRIS document ID: FT_1900005694490 · Search ACRIS
Party 2: KIMBALL INTERNATIONAL, INC.
1 individual party not shown
ACRIS document ID: FT_1890004207689 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1880000451888 · Search ACRIS
Party 1: EASTRICH NO. 81 CORP.
1 individual party not shown
ACRIS document ID: FT_1470000451147 · Search ACRIS
Party 2: EASTRICH NO. 81 CORP
1 individual party not shown
ACRIS document ID: FT_1480000451148 · Search ACRIS
Party 1: EASTRICH NO. 81 CORP.
1 individual party not shown
ACRIS document ID: FT_1490000451149 · Search ACRIS
Party 1: EASTRICH NO. 81 CORP
3 individual parties not shown
ACRIS document ID: FT_1510000451151 · Search ACRIS
Party 1: EASTRICH NO. 81 CORP
Party 2: 150 E 58TH ST PARTNRS LP
ACRIS document ID: FT_1530000451153 · Search ACRIS
Party 1: EASTRICH NO. 81 CORP
Party 2: 150 E. 58TH ST PRTNRS LP
ACRIS document ID: FT_1540000451154 · Search ACRIS
Party 1: EASTRICH # 81 CORP
1 individual party not shown
ACRIS document ID: FT_1700000451270 · Search ACRIS
Party 1: AR DE RLTY CORP. N.V.
Party 2: BANK NEW YORK TRST
1 individual party not shown
ACRIS document ID: FT_1710000451271 · Search ACRIS
Party 1: BANK OF NEW YORK TR
5 individual parties not shown
ACRIS document ID: FT_1100000399810 · Search ACRIS
3 individual parties not shown
ACRIS document ID: FT_1730000397873 · Search ACRIS
3 individual parties not shown
ACRIS document ID: FT_1740000397874 · Search ACRIS
3 individual parties not shown
ACRIS document ID: FT_1750000397875 · Search ACRIS
Party 1: ONE FIFTH REALTY N..
2 individual parties not shown
ACRIS document ID: FT_1310000389831 · Search ACRIS
Party 2: EASTRICH NO.81 CORP
1 individual party not shown
ACRIS document ID: FT_1320000389832 · Search ACRIS
ACRIS real property records, NYC Department of Finance via NYC Open Data. As of October 30, 2026.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 30, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 30, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
50 resolved, most recent Oct 25, 2023
THE OCCUPIED PARKING STRUCTURE OBSERVED TO BE IN THE STATE OF DISREPAIR. CRACKS IN CONCRETE UNDER RAMPS, REBAR DETERIORATED SOME AREAS UNDER RAMP, TEMPORARY SHORING INSTALLED TO SUPPORT RAMP.
OKAY TO DISMISS VIOLATION · disposed Oct 25, 2023
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
PD 5/10/23 INV62392733 · disposed May 9, 2023
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90778210 · disposed Aug 13, 2023
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
CIALHE 2017 AOC PAID FEE FAIL TO CORR DEF ON 2017 CAT1 INSP INV.V# 62165289 · disposed Feb 17, 2020
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
CIANOW CRM Violation Dismissed · disposed Oct 26, 2020
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC VIOL DISMISSED SEE EBN 2182/17SO/083118#2657 · disposed Dec 12, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC VIOL DISMISSED. SEE PERMIT EBN 2182/17SO/083118#2657 · disposed Dec 12, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
CIANOW CRM Violation Dismissed · disposed Oct 26, 2020
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC VIOL DISMISSED. EBN 2182/17SO/083118#2657 · disposed Dec 12, 2019
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
JNW SPRINKLER REPORT FILED. PENALTY PAID INV # 62395776/62395778 · disposed Jun 21, 2023
FAILURE TO PERFORM CATEGORY 5 INSPECTION
CAT 5 DEVICE HAS NO GOVERNOR, NO SAFTEY.LETTERFROM BP ELEVATOR CO., · disposed Jul 10, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CAT 1 2016 AOC, PAID LATE FEE · disposed Mar 18, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CAT 1 2016 AOC, PAID LATE FEE · disposed Mar 18, 2019
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Oct 16, 2017
PPN203 KIRK J. MAYER, CERT#038064 · disposed May 15, 2017
PPN203 GEORGE ZIUGZDA, CERT#366001 · disposed May 16, 2017
PPN203 AOC SUB ON 11/8/17 BY:NOUVEAU ELEVTOR GEORGE ZIUGZDA, CERT#366001 · disposed Nov 14, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 12, 2017
PPN203 AOC SUB ON 11/8/17 BY:NOUVEAU ELEVATOR GEORGE ZIUGZDA, CERT#366001 · disposed Nov 15, 2017
PPN203 AOC SUB ON 11/3/17 BY:NOUVEAU ELEVATOR GEORGE ZIUGZDA, CERT#366001 · disposed Nov 21, 2017
PPN203 AOC SUB ON 01/16/18 BY:NOUVEAU ELEVATOR GEORGE ZIUGZDA, CERT#366001 · disposed Jan 31, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Apr 24, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Apr 24, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Apr 24, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Apr 24, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Apr 24, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT1 2015 AOC, PAID LATE FEE · disposed Apr 24, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
ACC1 2014 AOC INSPECTION PROFORMED 12/3/14 · disposed Jan 9, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 26, 2016
PPN203 AOC SUB ON 9-16-16 BY NOUVEAU ELEVATOR INSP. G. ZIUGZDA, CERT# 366001 · disposed Sep 22, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 26, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PPN203 AOC SUB ON 11/8/17 BY:NOUVEAU ELEVATOR GEORGE ZIUGZDA, CERT#366001 · disposed Nov 14, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 26, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 26, 2016
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTIONS · disposed Jul 26, 2016
PPN203 GEORGE ZIUGZDA, CERT#366001 · disposed Oct 24, 2016
PPN203 GEORGE ZIUGZDA,CERT#366001 · disposed Oct 24, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 26, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PPN203 THOMAS COUTU, CERT#038058 · disposed Nov 27, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 26, 2016
PPN203 AOC SUB ON 2-19-16 BY NOUVEAU ELEVATOR NSP G. ZIUGDA CERT # 366001 · disposed Feb 22, 2016
PPN203 AOC SUB.030416 BY KONE INC. INSP.K.J.MAYER,CERT#038064 · disposed Mar 8, 2016
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTIONS · disposed Jul 26, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 21, 2015
PPN203 AOC SUB. 081315 BY TRANSEL ELEV. INSP. D. KIRK, CERT#402-010 · disposed Aug 20, 2015
PPN203 AOC SUB ON 6/1/15 BY NOUVEAU ELEVATOR CERT# 366001 GEORGE ZIUGZDA · disposed Jul 8, 2015
PPN203 AOC SUB ON 6/1/15 BY NOUVEAU ELEVATOR CERT# 366001 GEORGE ZIUGZDA · disposed Jul 8, 2015
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 30, 2026.
ECB violations
Environmental Control Board · NYC Open Data
32 resolved, most recent Oct 10, 2023
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01750,DATED 6/1/2023.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023,A
CRACKS IN OVERHEAD CONCRETE THROUGHOUT CELLULAR LEVEL, CONCRETE FALLING OFF AND RUSTED EXPOSED REBAR UNDER MAIN ENTRANCE RAMP TO ENTER PARKING GARAGE., REPAIR AND/OR REPLACE
Penalty: $625 · paid: $625
SIDEWALK SHED DOES NOT MEET COLOR SPECIFICATION AT TIME OF INSPECTION ON A 39 STY OBSERVED SIDEWALK SHED IN PLACE OBSERVED THE PARAPET WALL WAS NOT PAINTED IN HUNTER GREEN AS PER CODE.REM:COMPLY WITH CODE.
Penalty: $1,250 · paid: $1,250
FAILURE TO MAINTAIN BLDG EXTERIOR WALLS/FACADE & APPURTENANCES: NOTE AT THE TIME OF INSPECTION VIEW AT EXP#1,2 FLOOR CRACK,SPALLING & OPEN JOINT AT DECORATIVE STONE. ROOF OPEN COLUMN JOINT EXP#2. REMEDY: MAINTA
Penalty: $625 · paid: $625
27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O
Penalty: $1,250 · paid: $1,250
1RCNY 103-04 FAILURE TO REPAIR SWARMP CONDITIONS IN A TIMELY MANNER. OWNER FAILED TO REPAIR "DETERIORATING MASONRY AND CRACKS AT PARAPETS AND NON COMPLIANT PARAPET GUARDRAILS" WITHIN TIME FRAME RECOMMENDED BY Q
Penalty: $2,500 · paid: $2,504
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE
Penalty: $3,125 · paid: $3,125
A.C. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLER AN DFILE SPRINKLER REPORT PREOPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1, 2019 IN AN OFFICE BUILDING 100 FEET
Penalty: $1,250 · paid: $1,250
CU-79A10; 71M07; 57BB07, 10D06. 79A-COMPENSATION SWITCH HAS TAPE AND CABLE TIE ON SWITCH BOX, ELEVATOR LEFT SHUT DOWN DUE TO POSSIBLE ENTRAPMENT-REPAIR- CALL 212-393-2488; 57BB-FIRE EXTINGUISHER IN PIT AREA.
Penalty: $1,000 · paid: $1,000
100H11,100M07,100B10,100M07,100B07. 100H11-REPLACE WORN ROLLERS AND STEPS; 100,7-PROVIDE RESET BUTTON ON BZ FLOOR; 100B10-MANLIFT SHUTS DOWNWHILE PERSON IS RIDING LOFT.REPAIR. 100M07-PROVIDE COMPANY EMERGENCY
Penalty: $500 · paid: $500
FAILURE TO FILE AN ARCHITECT / ENGINEER REPORT CERTIFYING EXIT / DIRECTIONAL SIGNAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE / STORAGE BATTERY EQUIPMENT. REMEDY: FILE ARCHITECT / ENGINEER REPORT.
Penalty: $400 · paid: $400
ALTERED / CHANGED BLDG OCCUPIED W/O A VALID CERT. OF OCCUPANCY. ILLEGAL OCCUPANCY NOTED: BLDG ALT. UNDER APPLICATION # 102150538 ALT.1 FOUNDTO BE OCCUPIED, W/O A VALID CERT. OF OCCUPANCY UNDER TEMPORARY T-1 EXP
Penalty: $1,000 · paid: $1,000
WORK W/O A PERMIT. ILLEGAL WORK NOTED: @ GARAGE'S CELLAR LEVEL FOUND W. DEMOLITION OF FULL HEIGHT PARTITIONS BEING W/ CINDER BLOCK WALLS WHICH WAS USED A L-SHAPE ENCLOSURE FOR A ROOM IMPROPERLY COMPLETED LEAVI
Penalty: $1,600 · paid: $1,600
FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER! @ GARAGE LEVELS VARIOUS LOCATIONS FOUND W/ NUMEROUS CRACKS @ CEILINGS SLABS, PANS, & JOISTS BEING W/ STRESS & EVIDENCE OF CONCEALED WATER LEAKS @ CEILING & WSU
Penalty: $1,000 · paid: $1,000
FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER; NO FIRE STOPPING ASPER BC 712.3! DEFECTS NOTED: INADEQUATE FIRE STOPPING AS GARAGE LEVELS@ VARIOUS LOCATIONS W/ EXPOSED STRUCTURAL STEEL @ FREIGHT ELEVATOR CEL
Penalty: $500 · paid: $500
FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER ! @ GARAGE CELLAR LEVEL FOUND W/ AN ELEVATOR & IN FRONT OF DOOR FOUND W/ THE INSTALLATION OF A ROLL DOWN GATE W/ MECHANISMS FOR PADLOCK IN USE CONSISTING OF ILL
Penalty: $250 · paid: $250
ALTERED BLDG OCCUPIED W/O A VALID C OF O. UNDER JOB #102150538 TEMP C/O EXPIRED MARCH 22, 2005. REMEDY: OBTAIN VALID C/O.
Penalty: $180 · paid: $180
83X10.(83) RETURN UNIT TO SERVICE SO FULL INSPECTION BE MADE.
Penalty: $350 · paid: $350
APPROVED PLANS NOT AVAILABLE FOR INSPECTION (EXPIRED) REMEDY: PROVIDE APPROVED PLANS.
{#X10/#M07} 84M07/#J10/63M07. CEAUSE USE. ITEMS {#) MANUAL RESET INOPERATIVE AT TOP LANDING UNIT AUTOMATICALLY RESETS; REPAR (#) MANUAL RESET MISSING AT BOTTOM LANDING; PROIVED} (84) HARDWARE MISSING FROM BELT
Penalty: $500 · paid: $500
84M07/84X10/84M07/84X10 84M-MISSING MANUAL RESET LOWER LANDING 84X TOPRESET INOPERTIVE 84M-INSTALL OVERHEAD SAFTEY STOP 84X-TREADLE SAFTEY STOP INOPRETIVE.
Penalty: $350 · paid: $350
79R9. 79-R-9-DEVICE REMOVED ILLEGALLY. FILE FOR PERMIT FOR REMOVEL
50M07/ 74M07/ 73B07/ 50X12/ (50-M-07) PROVIDE COVER BRAKE MAIN MACHINE (74-M-07) PROVIDE BOX COVER 4 X 4 AND LIGHT SWITCH COVER ( 73-B-07) PROVIDE CORRECT CITY "ID" NUMBER MAIN LINE & MOTOR ( MACHINE ) THE
Penalty: $350 · paid: $350
75U05
75U05
75U05
STAIR "NO REENTRY "SIGNS MISSING OR DEFECTIVE SIGNS MISSING ON OCCUPANCY SIDE ON(2,6,10,14,18,22,26,30,&34TH FLOOR)REMEDY:INSTALL ALL SIGNS
Penalty: $400 · paid: $400
STAIR RE-ENTRY SIGNS MISSING OR DEFECTIVE: SIGNS MISSING ON (2,6,10,14,18,22,26,30,34 & 38TH FLOORS OR INSPECTION). REMEDY: INSTALL OR REPAIR ALL SIGNS ON FLOORS OF INSPECTION & ALL OTHER FLOORS THAT DO NOT COM
Penalty: $400 · paid: $400
STAIR AND/OR ELEVATOR SIGNS MISSING OR DEFECTIVE SIGNS MISSING ON (2,6,10,14,18,22,26,30,34 &38TH FLOORS OF INSPECTION). REMEDY: INSTALL ORREPAIR ALL SIGNS ON FLOORS OF INSPECTION & ALL OTHER FLOORS THAT DO NO
Penalty: $400 · paid: $400
FLOOR NUMBERING SIGNS MISSING OR DEFECTIVE: SIGNS MISSING ON (2,6,10,14,18,22,26,30,34 & 38TH FLOORS OF INSPECTION). REMEDY: INSTALL OR RE-PAIR ALL SIGNS ON FLOORS INSPECTION &AND ALL OTHER FLOORS THAT DO NOT
Penalty: $400 · paid: $400
SIGNS AT ELEVATOR LANDING MISSING OR DEFECTIVE: SIGNS MISSING ON (2,6,10,14,18,22,26,30,34,& 38TH FLOOR OF INSPECTION). REMEDY: INSTALL OR REPAIR ALL SIGNS ON FLOORS OF INSPECTION & ALL OTHER FLOORS THAT DO NO
WORK DONE WITHOUT A PERMIT. REMEDY: OBTAIN A PERMIT.
Penalty: $125 · paid: $125
ECB Violations (6bgk-3dad), NYC Open Data. As of October 30, 2026.
Certificates of occupancy
DOB · NYC Open Data
30 earlier certificates
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 30, 2026.
What are you trying to do here?
Public records for 150 EAST 58 STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 30, 2026.