Built in 2015, 117 residences across 70 floors.
220 Central Park South, 10019
220 Central Park South was designed by Robert A. M. Stern Architects. The frame is cast in place reinforced concrete on mat foundations carried to bedrock, with spandrel beams around the perimeter and ten inch slabs, which together keep interior columns to a minimum. The cladding is Alabama silver shadow limestone cut two inches thick and hung on stainless anchors off welded steel frames.
The windows are unitized and they are not consistent from floor to floor. They run about ten feet wide throughout, but their height changes with the floor, from a little under nine feet up to twenty two and a half feet where a room is double height. Ceilings reach fourteen feet.
Two things follow. Nothing at the window transfers between floors, so a treatment or a run of joinery drawn for one apartment has to be redrawn for another even in the same line. And the windows include inward opening sections for ventilation, so the swing of those leaves has to stay clear. Anything low set under a window, a bench or a radiator cover or a run of storage, is planned around that swing rather than against the glass.
Within walking distance
Building facts
Built
2015
Floors
70
Residences
117
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1010307501.
Public records show 220 CENTRAL PARK SOUTH was built in 2015 and rises 70 floors with 117 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
117
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1010307501. Violations and permits as of October 27, 2026.
15 filings in the last 24 months, 1 open violation, last filing Sep 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Removal of interior partition wall and millwork as shown on drawings. No change in use, egress or occupancy.
Filed estimated cost: $158,920 (as filed, not verified)
Removing existing walls to rebuild with sound dampened walls as shown on drawings. No change in use, egress or occupancy.
Filed estimated cost: $500,000 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Filed estimated cost: $2,895 (as filed, not verified)
Remove and construct interior partitions, doors and ceilings as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,472,161 (as filed, not verified)
Remove and construct interior partitions, doors and ceilings as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,472,161 (as filed, not verified)
Modification to existing HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $824,792 (as filed, not verified)
Modification to existing HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $824,792 (as filed, not verified)
Slab opening for new stair and elevator with associated reinforcement of existing structure as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $192,560 (as filed, not verified)
Slab opening for new stair and elevator with associated reinforcement of existing structure as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $192,560 (as filed, not verified)
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $112,500 (as filed, not verified)
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $112,500 (as filed, not verified)
Modification/additions to plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Filed estimated cost: $501,327 (as filed, not verified)
Modification/additions to plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Filed estimated cost: $501,327 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $75,000 (as filed, not verified)
Construction of new non load bearing partitions and ceiling, new finishes on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $1,020,000 (as filed, not verified)
Modification to existing HVAC ductwork and related piping on construction floor 54th/marketing floor 64th as shown on drawings. No change in use, egress or occupancy.
Filed estimated cost: $10,360 (as filed, not verified)
Remove and construction interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
Filed estimated cost: $136,778 (as filed, not verified)
Remove and construct interior partitions, doors and ceilings as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,472,161 (as filed, not verified)
Modification to existing HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $824,792 (as filed, not verified)
Slab opening for new stair and elevator with associated reinforcement of existing structure as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $192,560 (as filed, not verified)
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $112,500 (as filed, not verified)
Modification/additions to plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Filed estimated cost: $501,327 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $75,000 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $75,000 (as filed, not verified)
Install plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Filed estimated cost: $27,000 (as filed, not verified)
Hereby filing to construct interior partitions, ceilings and door for apt renovation on construction floor 61/marketing floor 71 as shown on plans filed herewith. No change to use, occupancy or egress.
Filed estimated cost: $200,000 (as filed, not verified)
Hereby filing to construct interior partitions, ceilings and door for apt renovation on construction floor 61/marketing floor 71 as shown on plans filed herewith. No change to use, occupancy or egress.
Filed estimated cost: $200,000 (as filed, not verified)
Hereby filing to remove, replace, and install plumbing fixtures with related piping for apartment renovation on construction floor61/marketing floor 71 as shown on plans filed herewith. No change to use, occupancy or egress.
Filed estimated cost: $50,000 (as filed, not verified)
New wall and fire rated door at service corridor as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $150,000 (as filed, not verified)
RELOCATION OF EXISTING FAN COIL UNITS, DUCTWORK AND GRILLES. ADDITION OF HUMIDIFICATION SYSTEM, LEAK DETECTION AND MOTORIZED VALVE CLOSURE AT ALL EXISTING FAN COILS UNITS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $100,000 (as filed, not verified)
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $20,000 (as filed, not verified)
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $20,000 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $200,000 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $200,000 (as filed, not verified)
Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $200,000 (as filed, not verified)
Interior non bearing partition alteration to existing apartment as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $2,700,000 (as filed, not verified)
Renovation to existing apartment as shown drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,000 (as filed, not verified)
Renovation to existing apartment as shown drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,000 (as filed, not verified)
Interior non bearing partition alteration to existing apartment as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $2,700,000 (as filed, not verified)
Interior non bearing partition alteration to existing apartment as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $2,700,000 (as filed, not verified)
Renovation to existing apartment as shown drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,000 (as filed, not verified)
Temporary tent accessory to the amenity dining room. Removed at the end of the programing. No changes to existing structures, use or egress.
Filed estimated cost: $5,000 (as filed, not verified)
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $25,000 (as filed, not verified)
Modification to fan coil units and relocate chilled water and condensate drain piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $7,500 (as filed, not verified)
Remove and install plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $10,000 (as filed, not verified)
Remove and construct interior walls, doors and ceilings as shown on drawings filed herewith. No change in use, egress or occupancy,
Filed estimated cost: $25,000 (as filed, not verified)
Construction of new non load bearing partitions and ceiling, new finishes on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $1,020,000 (as filed, not verified)
Construction of new non load bearing partitions and ceiling, new finishes on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $1,020,000 (as filed, not verified)
Modification to sprinkler system and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $16,500 (as filed, not verified)
Modification to HVAC ductwork and related piping on construction floors 7th & 8th/marketing floors 8th & 9th as shown on drawings filed herewith. No change in use, egress or occupancy.
Filed estimated cost: $75,000 (as filed, not verified)
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
50 complaints total.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
DELETED BY MTH ON 05/01/2007 BECAUSE DEVICE # IS INCORRECT
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 28, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 21, 2023
UNABLE TO VERIFY WORK DONE UNDER LAA M00531911 DUE TO NO ACCESS AND UNRESPONSIVE AUDIT OBJECTIONS. 0 PERCENT OF WORK DONE
PLUMBING WORK UNDER LAA #M00531911 HAS HAD ALL OBJECTIONS APPROVED BY LAA UNIT · disposed Jan 31, 2022
UNABLE TO VERIFY WORK DONE UNDER LAA M00531911 DUE TO NO ACCESS AND UNRESPONSIVE AUDIT OBJECTIONS. 0 PERCENT OF WORK DONE
PLUMBING WORK UNDER LAA #M00531911 HAS AD ALL OBJECTIONS APPROVED BY LAA UNIT · disposed Jan 31, 2022
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
NB W/ 1ST TCO LESS THAN 10 YRS OLD AT TIME DUE TO COMPLY · disposed Apr 14, 2022
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90401779 · disposed Mar 3, 2021
PPN203 AOC SUB ON 1/28/2020 BY:OTIS GUDESHWAR PERSAUD, CERT#055716 · disposed Feb 10, 2020
PPN203 AOC SUB ON 1/28/2020 BY:OTIS GUDESHWAR PERSAUD, CERT#055716 · disposed Feb 10, 2020
PPN203 AOC SUB ON 1/28/2020 BY:OTIS GUDESHWAR PERSAUD, CERT#055716 · disposed Feb 10, 2020
PPN203 AOC SUB ON 1/28/2020 BY:OTIS GUDESHWAR PERSAUD, CERT#055716 · disposed Feb 10, 2020
PPN203 AOC SUB ON 1/28/2020 BY:OTIS GUDESHWAR PERSAUD, CERT#055716 · disposed Feb 10, 2020
PPN203 AOC SUB ON 1/28/2020 BY:OTIS GUDESHWAR PERSAUD, CERT#055716 · disposed Feb 10, 2020
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13353149 · disposed Apr 11, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DOWNGRADED TO CLASS 2 OR 3 · disposed Feb 22, 2018
OKAY TO DIMISS. COMPLIED WITH VIOLATION. · disposed Aug 9, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Nov 9, 2017
VIOLATIONS RE-INSPECTED & COMPLIED WITH · disposed May 21, 2017
OK TO DISMISS. VIOLATION COMPLIED WITH · disposed Aug 28, 2016
OK TO DISMISS. VIOLATION COMPLIED WITH · disposed Aug 28, 2016
OK TO DISMISS. VIOLATION COMPLIED WITH. · disposed Aug 28, 2016
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
JNW LATE PENALTY PAID INVOICE # 61903646 · disposed Nov 7, 2017
PVT: SATISFIED BY ISSUANCE OF FINAL CERT FOR EA/EBN · disposed Jul 31, 2013
PVT: SATISFIED BY ISSUANCE OF FINAL CERT FOR EA/EBN · disposed Jul 31, 2013
PVT: SATISFIED BY ISSUANCE OF FINAL CERT FOR EA/EBN · disposed Jul 31, 2013
PVT: SATISFIED BY ISSUANCE OF FINAL CERT FOR EA/EBN · disposed Jul 31, 2013
PPN203 AOC SUB. ON 90110 BY PS MARCATO ELEV. L.BETZ CERT. #412001 · disposed Oct 5, 2010
PPN203 AOC SUB. ON 90110 BY PS MARCATO ELEV. L.BETZ_CERT. #412001 · disposed Oct 5, 2010
PPN203 AOC SUBMITTED 1/21/10 BY PS MARCATO ELEVCERT # 412-001 INSP LAWRENCE F BE · disposed Feb 2, 2010
PPN203 AOC SUBMITTED 1/21/10_ BY PS MARCATO ELECERT # 412-001 INSP LAWRENCE F BE · disposed Feb 2, 2010
PPN203 AOC SUBMITTED 1/21/10 BY PS MARCATO ELEVCERT # 412-001 INSP LAWRENCE F BE · disposed Feb 2, 2010
PPN203 AOC SUBMITTED 1/21/10 BY PS MARCATO ELEVCERT # 412-001 INSP LAWRENCE F BE · disposed Feb 2, 2010
PPN203 AOC SUBMITTED 1/21/10 BY PS MARCATO ELEVCERT # 412-001 INSP LAWRENCE F BE · disposed Feb 2, 2010
CAW AMENDED ROUND 6 REPORT WAS SUBMITTED ANDAPPROVED · disposed Mar 30, 2008
PPN203 AOC SUBMITTED ON 08/29/2007 BY PS MARCATO ELEVATOR. CERT#412-001 · disposed Sep 3, 2007
PPN203 AOC SUBMITTED ON 9/12/07 PS MARCATO ELEV. CERT. #412-001 · disposed Sep 16, 2007
PPN203 AOC SUBMITTED ON 08/29/2007 BY PS MARCATO ELEVATOR. CERT#412-001 · disposed Sep 3, 2007
PPN203 AOC SUBMITTED ON 1/4/05 BY CENTENNIAL ELEV. CERT. #249-001 · disposed Jan 6, 2005
PPN203 AOC SUBMITTED ON 1/4/05 BY CENTENNIAL ELEV. CERT. #249-001 · disposed Jan 6, 2005
PPN203 AOC SUBMITTED ON 063004 BY CENTENNIAL ELEV IND,CERT#L249-001 · disposed Jun 30, 2004
1P23060
AS PER INSPECTOR ROUTE SHEET · disposed Dec 30, 2002
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
2/X/10 OUT SIDE COMM INOPERATIVE REPAIR,57/BB/7FIRE EXTINGUISHER TAG EXPIRED PROVIDE,70/L/10 PIT LIGHT DEFECTIVE REPAIR.
28-201.1 INADEQUATE TENANT PROTECTION PLAN AT TIME OF INSPECITON,OBSERVED WORK BEING PERFORMED UNDER THE AFOREMENTIONED JOB NUMBER.THE SUBMITTED TAA LACKS SPECIFIC MEANS AND METHODS OF PROTECTING TENANTS ON THE
Penalty: $2,500 · paid: $2,500
TEMPORARY ELECTRICAL WORK WITHOUT A PERMIT AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR INSTALL TEMPORARY LIGHTING,OUTLETS,SWITCHES THROUGHOUT UNIT PERTAINING TO AFOREMENTIONED JOB NUMBER.UPON
Penalty: $1,600 · paid: $1,600
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 7B AND 8B REPORT OF CRITICAL EXAMINATION CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #803229 SUBMIT ACCEPTABLE REQUIRED TECHNICAL
PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRESHIFT SAFETY MEETING.NOTE AT THE TIME OF MY INSPECTION OF A NB CONSTRUCTION WORK IN PROGRESS THAT CONSIST OF MASONRY CARPENTRY & MINOR ELECTRICAL WORK UPON REQUE
Penalty: $2,500 · paid: $2,500
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY & PUBLIC AFFECTED BY CONSTRUCTION OPERATIONS.RESPONDING TO A COMPLAINT WHERE A (SSM) REPORTED THAT A PEDESTRIAN GOT STRUCK BY THE ELECTRICAL PANEL ON THE HEAD.
NOTIFICATION OF ADJUSTABLE SUSPENDED SCAFFOLD INSTALLATION AND REMOVALIN RESPONSE TO INCIDENT OF WORKER BEING INJURED I OBSERVED SUSPENDED SCAFFOLD SYSTEM BEING USE UPON RESEARCH IN BIS IT SHOWED THAT NO NOTIF
Penalty: $1,250 · paid: $1,250
NOTIFICATION OF ADJUSTABLE SUSPENDED SCAFFOLD INSTALLATION AND REMOVALIN RESPONSE TO INCIDENT OF WORKER BEING INJURED I OBSERVED A MONORAILSYSTEM IN UE AT ROOF LEVEL. UPON RESEARCH IN BIS SYSTEM IT SHOWED NO
FAILURE TO SAFEGUARD PUBLIC AND PROPERTY IN RESPONSE TO AN INCIDENT WHERE IT WAS REPORTED THAT A WORKER HAD SCATTER INJURED BY A INCIDENT BY A FAILING DRILL BIT.THE OBJECT (DRILL BIT) FELL FROM 9TH STORY BOUNCE
FAILURE TO SAFEGUARD PUBLIC & PROPERTY IN RESPOSE TO AN INCIDENT WHEREA PIECE OF INTERIOR WINDOW TRIM FELL FROM THE 58TH STY OF A 70 STY NEWBLDG & LANDING ON 2ND STY BALCONY AT EXP#3. NO INJURIES OR PROPERTY
3301.5 UNSAFE CONDITIONS AND EQUIPMENT. AT TIME OF INSPECTION OBSERVED FAILURE TO MAINTAIN UNSAFE CONDITION AND EQUIPMENT. LOCATION OF INCIDENT 2ND FLOOR BALCONY BREEZEWAY NORTH OF TOWER BLDG AT 8:56AM 03/16/18
Penalty: $625 · paid: $625
SEC. 3310.8.4.1 STANDPIPE/C.S.F.S.M. LOG BOOK. AT THE TIME OF INSPECTION OF NEW BLDG UNDER CONSTRUCTION. I OBSERVED UPON REVIEW OF THE LOG BOOKS-THAT THE FIRE SAFETY MANAGERS LOG BOOK HAD MISSING/NO ENTRIES ON
UNSAFE STORAGE COMBUSTABLE EQUIPMENT. AT THE TIME OF INSPECTION OF NEW BLDG UNDER CONSTRUCTION I OBSERVED A TANK OF FLAMMABLE GAS(ACETYLENE)ON THE GROUND NOT IN USE OR IN ADEQUATE CAGE/HAND TRUCK. THIS CREATES
Penalty: $2,400 · paid: $2,400
NO CONTROLLED ACCESS ZONE. AT THE TIME OF INSPECTION OF NEW BLDG UNDER CONSTRUCTION. CONSTRUCTION AT ROOF/BULKHEAD LEVEL,AT THE 4TH FL(MECHANICAL ROOM) I OBSERVED WORKER(PLUMBER)PERFORMING OVERHEAD WORK W/NO
SEC. 3303.7.2 FIRE EXTINGUISHERS. AT TIME OF INSPECTION OF NEW BLDG UNDER CONSTRUCTION,I OBSERVED FIRE EXTINGUISHERS ON VARIOUS FLOORS & AT VARIOUS LOCATIONS THROUGHOUT BLDG ON THE FLOOR/NOT MOUNTED ON HANGERS
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35294652J ISSUED ON 11/16/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. SUSPENDED SCAFFOLD STACK A TOWER CRANE,WHICH CREATED DANGER TO
FAILURE TO SAFEGUARD PUBLIC & PROPERTY @ TIME OF INSPECTION,OBSERVED AFUEL STORAGE TANK BEING STORED ON SIDEWALK SHED,TANK CAPACITY IS APPROX 200 GALS,(TANK IS USED TO REFUEL TOWER CRANE)THIS CONDITION OF COMBU
3301.2.FDNY PERMIT FAILURE TO MAINTAIN OBSERVED,COMBUSTIBLE LIQUID FUEL ON SITE IN STORAGE TANK APPROX 200 GALS,UPON REQUEST FOR FDNY PERMIT.FOR STORAGE & USE OF DIESEL FUEL TO OPERATE TOWER CRANE.NONE WERE GIV
Penalty: $250 · paid: $250
UNSAFE STORAGE OF COMBUSTIBLE MATERIAL OBSERVED,OIL TANK FOR REFUEL OFTOWER CRANE BEING STORED ON SWS OVER PEDESTRIAN & VEHICLE TRAFFIC.TANKSIZE IS APPROX 200 GALS CAPACITY,THIS CONDITION CREATES A HAZARD FOR P
NO PERMIT.OBSERVED,NO PERMIT TO STORE MATERIAL ON SWS,@ TIME OF INSPECTION,I REQUESTED TO SEE PERMITS FOR STORAGE OF MATERILA ON SIDEWALK SHED.NONE WERE GIVEN,(COMBUSTIBLE FUEL TANK,FORM WORK).STORAGE OF MATERI
Penalty: $1,600 · paid: $1,600
PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES. SCAFFOLD INSTALLATION DOES NOT MEET APPROVED PLAN. NOTE: OBSERVED A WIRE ROPE WINDERS INSTALLED ON SCAFFOLD PLA
Penalty: $1,000 · paid: $1,000
PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES. UNSAFE CONDITIONS. NOTE: OBSERVED THE FOLLOWING EQUIPMENT ERECTED WITHOUT A MANUFACTURE LABEL OR TAG: -TURNBUCK
Penalty: $400 · paid: $400
FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AT 62 FLOOR SUSPENDED SCAFFOLD STRUCK TOWER CRANE CREATING DANGER TO PUBLIC SAFETY.REM:SAFEGUARD PUBLIC&PROPERTY.
FAILURE TO INSTITUTE AND MAINTAIN TEMPORARY CONSTRUCTION EQUIPMENT AND SAFETY MEASURES. NOTE:AT THE TIME OF MY INSPECTION RESPONDING TO COMPLAINT #1457179 WHERE ELEVATOR WORKER WAS HIT IN CHIN FROM FALLING META
FAILURE TO NOTIFY OF CATHEAD RAISE THE TRAVEL OF THE PERSONNEL HOIST IS INCREASED AS PER ANSI A10.4 SECTION 26 AS MODIFIED BY RS 18.7 AND FAILURE TO SUBMIT A STATEMENT ON A DEPARTMENT FORM TO THE ELEVATOR DIVIS
3318.3-97M07,97M07-FAILURE TO SUBMIT A STATEMENT ON A DEPARTMENT FORM TO THE ELEVATOR DIVISION CERTIFYING A TEST HAS BEEN CONDUCTED AND THE RESULT THEREOF WERE SUBMITTED WITHIN 24 HOURS OF TEST BEING PERFORMED
26X10,16B10,100B07-26X10)CEASE USE ITEM. TOP EMERGENCY EXIT SWITCH IS BROKEN AND WAS BYPASS TO ALLOW OPERATION OF HOIST. THIS IS A SAFETY DEVICE TO PROTECT OPERATOR AND PASSENGER'S. REPAIR SWITCH AND CONTACT NY
PSWO SUSPENDED SCAFFOLD.SUSPENDED SCAFFOLD SHALL BE INSTALLED AND USEDIN SUCH A MANNER THAT THE ROPES OR SIMILAR SUSPENSION ELEMENTS ARE PARLLEL TO THE WALL AT ALL TIMES.NOTED:SUSPENDED SCAFFOLD CABLES ARE NOT
Penalty: $400 · paid: $400
PSWO SUSPENDED SCAFFOLD.WORK DOES NOT CONFORM TO APPROVED CONSTRUCTIONDOCUMENTS.NOTED:AT TIME OF OUTRIGGER RAIL TYPE SYSTEM WITH SUSPENDED SCAFFOLD NOT TO PLANS.MISSING BOLTS TO SLAB AT FRONT OF BEAMS.LIFE LINE
Penalty: $1,250 · paid: $2,559
WORK-DOES NOT CONFORM TO APPROVED CD5.NOTED:TIE BACK CABLES ARE ON MORE THAN 450 THEY ARE ABOUT 750 CD5 SAYS 450.BEAMS ON ANGLES NOT TO CD5;CD5 SHOW FRAMES FOR OUTRIGGER BEAMS TO BE 2 FRAME IN HEIGHT IT IS 3 FR
Penalty: $250 · paid: $250
BC3301.1/OSHA 1926.251(A)(4)SPECIAL CUSTOM DESIGN CLAMPS,HOOKS,OR OTHER LIFTING ACCESSORIES SHALL BE MARKED TO INDICATE THE SAFE WORKING ROAD AND SHALL BE PROOF-TESTED TO USE TO 125 PERCENT OF THEIR RATED LOAD
Penalty: $2,000 · paid: $4,095
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPERATIONS. NOTE: 70 STY BLDG TOPPED OUT. AT GRADE LEVEL A WORKER WAS INJURED WHEN A STEEL BOX BEAM 20 FEET LONG BY 1FT TALL FELL OVER W/O A FRAME
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS:CONCRETE BLOW OUT NOTED:DOB COMPLIANT CONCRETE HITTING ADJACENT PROPERTY YESTERDAY AT APPROX 4PM AT THE 70TH FL POURING WALLS-CON
Penalty: $1,600 · paid: $1,600
SITE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPARMENT OF CONDITIONS REQUIRED:CONCRETE DEBRIS/ADJACENT PROPERTY.NOTED:DOB CM#1447176-DEBRIS HITTING ADJACENT PROPERTY.INSPECTION REVEALS-CONCRETE OPERATIN
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY EFFECTED BY CONSTRUCTIONOPERATIONS.REBAR CAPS-NOT IN PLACE.NOTED-AT THE 70TH FLR-REBAR IN PROGRESS FORM WORK IN PROGRESS,CRANE OPERATIONS WORKERS ON DECK OBSERVED.
Penalty: $1,600 · paid: $1,600
SITE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPT OF CONDITIONS AS REQUIRED:CONCRETE DEBRIS-ADJACENT BUILDING NOTED:AT TIME OF INSPECTION OF DOB CM#1447178 WHERE CONCRETE DEBRIS HITTING ADJACENT PROPERT
BC3301.1.1/FAILURE TO MAINTAIN CLEAR/FREE EGRESS/RESPONSIBILITY FOR SAFETY.AT THE TIME OF INSPECTION OF AN ACTIVE SITE OF A,70 STORY BUILDING OBSERVED OBSTRUCTED EGRESS ON 69,68,67,65 AND 64 BY CONSTRUCTION ACT
Penalty: $400 · paid: $400
FAILURE TO MAINTAIN HOUSEKEEPING.AT THE TIME OF INSPECTION OF AN ACTIVE SITE OF A 70 STORY BUILDING OBSERVED DEBRIS(NAILS,CONCRETE CHIPPIGS)ON THE LEADING EDGES/EYEBROW AT 66 THRU 63 FLOOR.ALSO COMBUSTIBLE DEBR
Penalty: $400 · paid: $400
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. SES SWO# 022217RH01 ISSUED @ TIME OF INSP USER ABOVE USED CRANE CD 3773 CN 69415 TO SET CURTAIN WALL PANELS. CRANE WAS SET UP CO
Penalty: $1,250 · paid: $2,518
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS. SEE SWO# 022217RH01 ISSUED ACCORDING TO PERMITS, ORIGINAL CRANE USER ABOVE ERECTED/USED CRANE CD 3773 CN 64915 CONTRARY TO PLAN
SEC. 3314.8 PSWO SUPPORTED SCAFFOLD. ALL OPEN SIDES & ENDS OF SCAFFOLDPLATFORMS SHALL BE PROVIDED W/GUARDRAIL SYSTEM & DEBRIS NETTING. NOTEDAT TIME OF INSPECTION SCAFFOLD ON MULTIPLE EXPOSURE IS MISSING GUARDRA
Penalty: $1,600 · paid: $1,600
SEC. 3314.4.4.4 DISLODGEMENT MATERIAL & EQUIPMENT SUSCEPTIBLE TO DISLODGMENT SHALL NOT BE STORED ON A SCAFFOLD & TO ANY OBJECT FROM FALLING OFF SCAFFOLD. NOTED: AT TIME OF INSPECTION THERE IS MATERIAL ON SCAFFO
Penalty: $400 · paid: $400
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NOTED: AT TIME OF INSPECTION SIDEWALK SHED UNDER PERMIT#140322906 IS MISSING DETAILS FOR SPLICING OF BEAM. MISSING DETAILS FOR
SEC. 3314.5 PLATFORM ON ALL WORKING LEVELS OF A SCAFFOLD SHALL BE FULLY PLANKED. NOTED: AT TIME OF INSPECTION SCAFFOLD HAS MULTIPLE LEVELS THAT ARE MISSING PLANKING NOT FULLY PLANKED. SOME OF THE PLANKING IS
Penalty: $1,600 · paid: $1,600
INADEQUATE SAFETY MEASURES:OPERATION OF CRANE EQUIPMENT IN AN UNSAFE MANNER(SEE CEASE USE ORDER#CUO#122816RH01)UBER/RESPONDENT ABOVE OVERRIDE CRANE OPERATING RADIUS(26),USING RIGGING MODE TO ACCOMMODATE AND C,D
Penalty: $10,000 · paid: $10,000
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. SEE SWO #111716RH01. AT TIME OF INSPECTION TOWER CRANE CD 3597 CN 36615 W/150' +10'BOOM, 813'9"TOWER MAS SECTIONS WAS HOISTING
Penalty: $10,000 · paid: $10,000
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.NOTE:@THE TIMNE OF MY INSPECTION OF A 66STRY BLDG,CONSTRUCTION WORK IN PROGRESS.RESPONDING TO COMPLAINT #1432384 WHERE SSM REPORTED WORKER WAS HIT ON HEAD &NECK BY POLE
COLLECTION &CONTAINMENT.NOTE: @THE TIME OF MY INSPECTION OF A 70 STRY BLDG @51ST FLR LEVEL, CONSTRUCTION WORK IN PROGRES. I OBSERVED CONCRETE WAHOUT, COLLECTING &CONTAINMENT BEING PERFORM @EXP#1 INTO A MAKESHIF
Penalty: $1,200 · paid: $1,200
3303.11 STAIRS DURING CONSTRUCTION NOTED:@TIME OF INSPECTION OF A 70 STRY BLDG @ 51ST FLR LEVEL,CONSTRUCTION WORK IN PROGRESS.I OBSERVED WORKING DECK WAS ON 51ST FLRS &55 FT BEHIND WORKING DECK.FAILURE TO PROVI
Penalty: $400 · paid: $400
WORK CONTRARY TO APPROVED PLANS &DOCUMENTS.NOTE:@TIME OF MY INSPECTIONOF A 70STRY BLDG @51ST FLR LEVEL,CONSTRUCTION WORK IN PROGRESS.I OBSERVED A FORKLIFT W. A BOOM ATTACHMENT BEING USE ON 26TH FLR LEVEL @EXP#1
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 220 CENTRAL PARK SOUTH, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.