Built in 2024, 62 residences across 36 floors.
255 East 77th Street, 10075
255 East 77th Street was designed by Robert A. M. Stern Architects with Hill West as architect of record, thirty six storeys holding 62 residences, with amenity interiors by Yabu Pushelberg.
The tower draws on Gothic and Art Deco precedent, and the elevation carries arcades, loggias and a decorative crown, with sculpted detail and carved wildflowers worked into the masonry.
It is a covered outdoor room cut into the building rather than a balcony hung off it, so the apartment behind opens into a recess that is roofed and walled on three sides. That changes the light reaching the room considerably, and it gives an outdoor floor level and a threshold to resolve where another apartment would simply have a window.
Masonry construction with punched openings means the wall between windows is solid throughout rather than a glazed panel.
Within walking distance
Building facts
Built
2024
Floors
36
Residences
62
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1014327502.
Public records show 255 EAST 77TH STREET was built in 2024 and rises 33 floors with 62 residential units (NYC MapPLUTO, version 26v2). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
63
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1014327502. Violations and permits as of October 27, 2026.
35 filings in the last 24 months, last filing Sep 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Plumbing work filed in conjunction with Apt 4B general construction renovation M01407562-I1.
Filed estimated cost: $23,004 (as filed, not verified)
Interior demolition and construction of partitions, and renovation of Master Bathroom in existing apartment #4B. PL is filed under the subsequent app. No change in use, occupancy or egress.
Filed estimated cost: $423,016 (as filed, not verified)
MECHANICAL ELECTRIC HOIST PLACED ON 25TH FLOOR SLAB TO HOIST AND INSTALL FACADE PANELS
Filed estimated cost: $1,500 (as filed, not verified)
Use of mini crane for building construction. This application is filed in conjunction with NB M00798756-I1
Filed estimated cost: $5,000 (as filed, not verified)
Suspended Scaffold for facade restoration as shown on plans
Filed estimated cost: 0 (as filed, not verified)
FILING ADDITIONAL SUBSEQUENT MECHANICAL APPLICATION FOR CERTIFICATE OF COMPLIANCE FOR REMAINING MECHANICAL UNITS ONLY. ALL CODE REVIEW AND COMPLIANCE COMPLETED UNDER DOMINANT MECHANICAL FILING M00798756-S5
Filed estimated cost: 0 (as filed, not verified)
3 NEW GAS BOILERS IN CONJUNCTION WITH NB M00798756-I1
Filed estimated cost: $1,000 (as filed, not verified)
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002-Option B
Filed estimated cost: $20,000 (as filed, not verified)
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Filed estimated cost: 0 (as filed, not verified)
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Filed estimated cost: 0 (as filed, not verified)
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Filed estimated cost: 0 (as filed, not verified)
SUSPENDED SCAFFOLDING DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: 0 (as filed, not verified)
SUSPENDED SCAFFOLDING DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: 0 (as filed, not verified)
SUSPENDED SCAFFOLDING DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: 0 (as filed, not verified)
INSTALLATION OF A TEMPORARY SCAFFOLD SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF A TEMPORARY SCAFFOLD SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Filed estimated cost: $5,000 (as filed, not verified)
EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Filed estimated cost: $10,000 (as filed, not verified)
EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Filed estimated cost: $10,000 (as filed, not verified)
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $2,000 (as filed, not verified)
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $2,000 (as filed, not verified)
Working platform/access platform to construct the exterior shear walls at the facade of the building. No change of use or occupancy
Filed estimated cost: $40,000 (as filed, not verified)
Suspended Scaffold for facade restoration as shown on plans
Filed estimated cost: 0 (as filed, not verified)
Suspended Scaffold for facade restoration as shown on plans
Filed estimated cost: 0 (as filed, not verified)
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $2,000 (as filed, not verified)
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Filed estimated cost: $20,000 (as filed, not verified)
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS
Filed estimated cost: $10,000 (as filed, not verified)
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Filed estimated cost: $20,000 (as filed, not verified)
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS
Filed estimated cost: $10,000 (as filed, not verified)
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
Filed estimated cost: $2,000 (as filed, not verified)
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
Filed estimated cost: $2,000 (as filed, not verified)
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
Filed estimated cost: $2,000 (as filed, not verified)
TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING NB CONST, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING NB CONST, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF NEW SPRINKLER STANDPIPE FOR NEW BUILDING FILED IN CONJUNCTION WITH M00798756-I1
Filed estimated cost: 0 (as filed, not verified)
INSTALLATION OF NEW SPRINKLER STANDPIPE FOR NEW BUILDING FILED IN CONJUNCTION WITH M00798756-I1
Filed estimated cost: 0 (as filed, not verified)
INSTALLATION OF VERTICAL FORMWORK AND PLATFORMS
Filed estimated cost: $20,000 (as filed, not verified)
Suspended Scaffold for facade restoration as shown on plans
Filed estimated cost: 0 (as filed, not verified)
TEMPORARY SYSTEM SCAFFOLD AT THE ADJACENT PROPERTY ROOF DURING NB CONST, FILED SEPARATELY. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $3,000 (as filed, not verified)
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $2,000 (as filed, not verified)
PLACING BOOM INSTALLATION. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $7,525 (as filed, not verified)
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Filed estimated cost: $20,000 (as filed, not verified)
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS
Filed estimated cost: $10,000 (as filed, not verified)
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
Filed estimated cost: $2,000 (as filed, not verified)
PLATFORM INSTALLATION . THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $7,525 (as filed, not verified)
TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING NB CONST, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,000 (as filed, not verified)
INSTALLATION OF NEW SPRINKLER STANDPIPE FOR NEW BUILDING FILED IN CONJUNCTION WITH M00798756-I1
Filed estimated cost: 0 (as filed, not verified)
INSTALLATION OF NEW SPRINKLER STANDPIPE FOR NEW BUILDING FILED IN CONJUNCTION WITH M00798756-I1
Filed estimated cost: 0 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
RESPONDING TO AN INCIDENT WHERE A WORKER GOT HIT IN HIS RIGHT EYE WITH A BAKER SCAFFOLD LOCKING PIN WHILE ATTEMPTING TO DISMANTLE ON THE 32ND FLOOR. INSPECTION REVEALED THAT THE INCIDENT OCCURRED APPROXIMATELY
Penalty: $5,000 · paid: $5,000
AT THE TIME OF INSPECTION OF A 36 STORY NEW BUILDING, WITH A FOOT PRINT OVER 5000 SQ.FT. I OBSERVED THERE WAS NO COMPETENT WATCH PERSON WITH CODE COMPLIANT CREDENTIALS AVAILABLE. COMPLY WITH CODE BC3303.3 AND M
Penalty: $2,500 · paid: $2,500
RESPONDED TO WORKER FELL OFF LADDER & TRANSPORTED OFFSITE BY AMBULANCEOBSERVE GC FAILED TO ENSURE SAFE LADDER USE TO SPECS&SAFETY STANDARDS IN RESPONSE TO AN INCIDENT WHERE WORKER WAS CARRYING UP A BUCKET OF WE
Penalty: $1,250 · paid: $1,250
AT TIME OF MY INSPECTION I OBSERVED A CONSTRUCTION FENCE AT A NEW 33 STORY BUILDING.I NOTICED CONSTRUCTION FENCE IS NOT AS PER CODE COLOR.IT IS PAINTED BLACK AND NOT GREEN AS SECTION OF LAW.ENSURE CONSTRUCTION
Penalty: $1,000 · paid: $1,000
HORIZONTAL NETTING ON 14TH FLOOR STRIPPING ON 19TH FLOOR CONTRARY TO 3305.3.6.6 STRIPPING OPERATION. DEBRIS GENERATED AS A RESULT OF STRIPPING OPERATIONS SHALL BE IMMEDIATELY CONTAINED AND REMOVED AT REASONABLE
FAILURE TO COMPLY WITH BC-3307.6.4.11 SPECIFICATIONS. TEMPORARY CONSTRUCTION EQUIPMENT SIDEWALK SHED AT MULTI EXPOSURES SOLID PARAPET PANELS WERE PAINTED BLACK IN CONTRARY WITH CODE AS REQUIRED TO BE PAINTED HU
Penalty: $2,400 · paid: $2,400
BC 3307.6.4.11 COLOR: AT TIME OF INSPECTION AT NEW 36 STORY BUILDING I OBSERVED SIDEWALK SHED ERECTED AND NOT PAINTED HUNTER GREEN AS REQUIRED.PAINT AND MAINTAIN SIDEWALK SHED AS REQUIRED
Penalty: $2,400 · paid: $2,400
28-110.2 OBSERVED MOBILE CRANE PERFORMING AERIAL OPERATIONS @ EXPOSURE ( ) AFTER REVIEW SITE SAFETY PLAN EQUIPMENT NOT SPECIFIED W/ SWING RADIUS. HOISTING OPERATIONS W/ CRANES AREN'T PART OF THE INDUSTRY NOTICE
Penalty: $625 · paid: $625
AT THE TIME OF THE INSPECTION FOR THE NB /SOE JOB SITE, I OBSERVED ACTIVE JOB SITE WITH EXCESSIVE ACCUMULATION OF DEBRIS AND MATERIALS AS CUT PACES OF PILE AND CONCRETE CLOSE TO THE STEPS AROUND THE WORKERS, CR
AT THE TIME OF THE INSPECTION FOR NB /SOE JOBSITE, I OBSERVED THE SOE PHASE WITH SHORING THE FENCE WITH A DIFFERENT COLOR (BLACK) WITH THE COMPANY LOGO (NAFTALI GROUP) DOES NOT COMPLY WITH CODE BC 3307.7
Penalty: $1,000 · paid: $1,000
AT THE TIME OF THE INSPECTION FOR NB 36 STORIES, I OBSERVED THE WELDING MACHINE AND OTHER EQUIPMENT ON THE UNDRILLED PILL NEAR THE WATER TANK FOR DRILLING PURPOSES, THIS IS CREATING AN IMMEDIATE HAZARDS FOR ELE
Penalty: $2,500 · paid: $2,500
AT THE TIME OF THE INSPECTION FOR NB /SOE JOB SITE 36 STORIES, I OBSERVED THE SOE PHASE WITH SHORING THE RAMP FOR THE EXCAVATORS MISSING THE CURBS AND GUARDRAILS AS PER SITE SAFETY PLAN APPROVAL- COMPLY WITH C
Penalty: $2,500 · paid: $2,500
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 255 EAST 77TH STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.