← Buildings

40 Bleecker Street

Built in 2018, 61 residences across 12 floors.

40 Bleecker Street, 10012

40 Bleecker St

40 Bleecker was designed by Rawlings Architects, twelve storeys and 61 residences built new inside the NoHo Historic District, with interiors by Ryan Korban.

The facade is hand finished limestone with bronze detailing, and it curves. Corners are rounded, the top three floors step back, and the windows are grouped vertically in pairs spanning two storeys within a narrow grid that runs across the long Mulberry Street elevation and the shorter Bleecker Street front.

The two storey pairing is what an interior meets. A window belongs to a vertical group rather than standing alone, so the pier between groups is a fixed solid running the height of the building and appears in the same position on every floor. Rooms at a rounded corner meet the glass on a curve, so a straight run of casework stops short of the turn.

Floors are engineered oak milled from reclaimed Italian wine barrels, a finish with a wear layer thick enough to be refinished rather than replaced.

Within walking distance

72 mLindsey Adelman Studio · studio
154 mThe Hole · gallery
392 mBulthaup · showroom
484 mGalerie Timonier · gallery
643 mOchre · showroom
705 mPeter Freeman Inc · gallery

Building facts

Built

2018

Floors

12

Residences

61

New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1005217506.

Public records show 40 BLEECKER STREET was built in 2018 and rises 12 floors with 61 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 34 job filings on record for this lot (NYC Open Data).

Public record

Total units

73

Total permits

34

NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1005217506. Violations and permits as of October 27, 2026.

4 filings in the last 24 months, 1 open violation, last filing Apr 2025

The record

Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.

DOB NOW filings from June 2016.

SprinklersFiled by ADVANCED PLUMBING LLClic. 000313Signed-off · Mar 19, 2025 · job M01186692-S3

APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $20,100 (as filed, not verified)

PlumbingFiled by ADVANCED PLBG LLClic. 001306Signed-off · Mar 19, 2025 · job M01186692-S2

APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $13,000 (as filed, not verified)

Mechanical SystemsFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Mar 19, 2025 · job M01186692-S1

APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $40,000 (as filed, not verified)

General ConstructionFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Mar 9, 2025 · job M01186692-I1

APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR (RETAIL SPACE C) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $150,000 (as filed, not verified)

28 earlier filings, 2018–2024
SignFiled by N.Y. SIGN ART INClic. 000239Signed-off · Apr 29, 2024 · job M01031427-I1

NON ILLUMINATED, NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL. SIGN WORDING: GREAT MANY

Filed estimated cost: $300 (as filed, not verified)

SprinklersFiled by ADVANCED PLUMBING LLClic. 000313Signed-off · Jan 1, 2024 · job M00971174-S2

MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS

Filed estimated cost: $38,000 (as filed, not verified)

Mechanical SystemsFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Jan 1, 2024 · job M00971174-S1

MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS

Filed estimated cost: $90,000 (as filed, not verified)

General ConstructionFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Jan 1, 2024 · job M00971174-I1

INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS

Filed estimated cost: $70,000 (as filed, not verified)

PlumbingFiled by ADVANCED PLUMBING LLClic. 000313Signed-off · Jan 1, 2024 · job M00971174-S2

MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS

Filed estimated cost: $38,000 (as filed, not verified)

SignFiled by NATIONAL MAINTENANCE, INClic. 000224Signed-off · Apr 20, 2023 · job M00827559-I1

ERECT ACCESSORY BUSINESS WALL SIGN FOR PEACHY, NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $480 (as filed, not verified)

SprinklersFiled by GO GREENER PLUMBING LLClic. 000606Signed-off · Nov 20, 2022 · job M08001618-I1

SPRINKLER INSTALLATION FOR FIRST FLOOR OFFICE

Filed estimated cost: $29,000 (as filed, not verified)

PlumbingFiled by GO GREENER PLUMBING LLClic. 000699Signed-off · Nov 20, 2022 · job M08001608-I1

Installation of fixtures and related piping and drains for interior renovation of office space

Filed estimated cost: $29,000 (as filed, not verified)

Mechanical SystemsFiled by A. BONADUCE, INClic. 600037Signed-off · Nov 20, 2022 · job M08002404-I1

Ventilation and associated ducts & piping for First Floor office

Filed estimated cost: $135,000 (as filed, not verified)

General ConstructionFiled by A. BONADUCE, INClic. 600037Signed-off · Oct 31, 2022 · job M08002685-I1

Interior renovation of partitions and walls floors and finishes for office space

Filed estimated cost: $225,000 (as filed, not verified)

SignFiled by R.G.M. SIGNS INClic. 000168Signed-off · Apr 18, 2022 · job M00707775-I1

INSTALL NON-ILLUMINATED WALL SIGN (CLEAN MARKET)

Filed estimated cost: $200 (as filed, not verified)

SignFiled by R.G.M. SIGNS INClic. 000168Signed-off · Apr 17, 2022 · job M00707758-I1

INSTALL NON-ILLUMINATED WALL SIGN (CLEAN MARKET)

Filed estimated cost: $200 (as filed, not verified)

PlumbingFiled by METROTECH MECHANICAL CORPlic. 002213Signed-off · Jan 26, 2022 · job M00630615-I1

NEW BATHROOM, SINK, AND DRINKING FOUNTAIN ADDED TO EXISTING RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $34,950 (as filed, not verified)

SprinklersFiled by UNIVERSAL FIRE SPR LLClic. 000931Signed-off · Jan 24, 2022 · job M00630619-I1

ADDITIONS/MODIFICATIONS TO AN EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $24,800 (as filed, not verified)

Mechanical SystemsFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Jan 21, 2022 · job M00630604-I1

Mechanical modifications to include HVAC replacement and replacement of associated ductwork. No change in use, egress or occupancy under this application.

Filed estimated cost: $61,200 (as filed, not verified)

Mechanical SystemsFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Jan 21, 2022 · job M00630604-I1

Mechanical modifications to include HVAC replacement and replacement of associated ductwork. No change in use, egress or occupancy under this application.

Filed estimated cost: $61,200 (as filed, not verified)

General ConstructionFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Jan 20, 2022 · job M00631256-I1

INTERIOR RENOVATION TO COMMERCIAL SPACE, INCLUDING NEW PARTITIONS,MILLWORK, FINISHES, AND PLUMBING FIXTURES IN COMPLIANCE WITH REQUIRED BOARD OF PHARMACY APPROVALS. NO WORK TO BUILDING EXTERIOR, ADA RAMP, TENANT DEMISING WALLS, OR USE/ EGRESS OR OCCUPANCY

Filed estimated cost: $489,828 (as filed, not verified)

General ConstructionFiled by DARBY CONSTRUCTION SVC LLlic. 619974Signed-off · Jan 20, 2022 · job M00631256-I1

INTERIOR RENOVATION TO COMMERCIAL SPACE, INCLUDING NEW PARTITIONS,MILLWORK, FINISHES, AND PLUMBING FIXTURES IN COMPLIANCE WITH REQUIRED BOARD OF PHARMACY APPROVALS. NO WORK TO BUILDING EXTERIOR, ADA RAMP, TENANT DEMISING WALLS, OR USE/ EGRESS OR OCCUPANCY

Filed estimated cost: $489,828 (as filed, not verified)

General ConstructionFiled by EPC CONTRACTING INClic. 605786Signed-off · Oct 17, 2021 · job M00611377-I1

MINOR DEMOLITION OF INTERIOR NON-BEARING WALLS, TRIM, DOORS AND FINISHES IN UNIT 6D. INSTALLATION OF NEW WALLS, TRIM AND CLOSET DOORS. EXISTING FLOOR TO BE PATCHED AND REPAIRED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $37,500 (as filed, not verified)

General ConstructionFiled by EPC CONTRACTING INClic. 605786Signed-off · May 6, 2021 · job M00485764-I1

PROPOSED MINOR DEMOLITION OF NON-BEARING WALLS, DOORS AND TRIM IN UNIT 4B. INSTALLATION OF NEW PARTITIONS, DOORS, TRIM AND MILLWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $69,000 (as filed, not verified)

Construction FenceFiled by FOUNDATIONS GROUP I, INClic. 614983Signed-off · Nov 7, 2020 · job M00424126-I1

TEMPORARY CONSTRUCTION FENCE

Filed estimated cost: $3,000 (as filed, not verified)

Supported ScaffoldFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Jan 24, 2019 · job M00079889-I1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Supported ScaffoldFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Jan 23, 2019 · job M00079889-I1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Supported ScaffoldFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Jan 23, 2019 · job M00079889-I1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Sep 25, 2018 · job M00079884-I1

INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Sep 25, 2018 · job M00079884-I1

INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Sep 24, 2018 · job M00079884-I1

INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Sep 24, 2018 · job M00079884-I1

INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $1 (as filed, not verified)

11 resolved
HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

HPD Violation · Class AVIOLATION DISMISSED · issued May 10, 2026

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

HPD Violation · Class AVIOLATION DISMISSED · issued Apr 17, 2024

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

HPD Violation · Class AVIOLATION DISMISSED · issued Mar 30, 2023

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

HPD Violation · Class AVIOLATION DISMISSED · issued Mar 9, 2022

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

HPD Violation · Class AVIOLATION DISMISSED · issued Apr 19, 2021

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

HPD Violation · Class AVIOLATION CLOSED · issued Jun 14, 2015

§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY

HPD Violation · Class AVIOLATION CLOSED · issued Jun 14, 2015

§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY

HPD Violation · Class AVIOLATION CLOSED · issued Jun 14, 2015

§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY

Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.

Condo documents are recorded at unit level. Search a unit to see them.

HPD maintenance complaints

HPD · NYC Open Data

HEAT/HOT WATER — ENTIRE BUILDINGCLOSE · Feb 15, 2015

The Department of Housing Preservation and Development responded to a complaint of no heat or hot water and was advised by a tenant in the building that heat and hot water had been restored. If the condition still exists, please file a new complaint.

HEAT/HOT WATER — APARTMENT ONLYCLOSE · Jan 7, 2015

More than one complaint was received for this building-wide condition. This complaint status is for the initial complaint.The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.

DOOR/WINDOW — WINDOW FRAMECLOSE · Jan 7, 2015

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

HEAT/HOT WATER — APARTMENT ONLYCLOSE · Jan 7, 2015

The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.

PLUMBING — WATER SUPPLYCLOSE · Nov 5, 2008

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

22 complaints total.

HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.

Pre-2016 DOB filings

DOB legacy · NYC Open Data

4 NB filings2015–2016
1 SI filing1990
10 A2 filings2003–2019
12 A3 filings2003–2020
1 SC filing2020
1 DM filing2016
1 A1 filing1991

DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.

DOB legacy violations

DOB BIS · NYC Open Data

38 resolved, most recent Jun 14, 2026
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED — V*-DOB VIOLATION - DISMISSEDFeb 21, 2024

FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

CIANOW CRM Violation Dismissed · disposed Jun 14, 2026

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDJun 19, 2023

VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

CIANOW CRM Violation Dismissed · disposed Jul 19, 2023

EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE — V*-DOB VIOLATION - DISMISSEDNov 30, 2022

FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

CIANOW CRM Violation Dismissed · disposed Jul 19, 2023

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDAug 20, 2022

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021

NB W/ 1ST TCO LESS THAN 10 YRS OLD AT TIME DUE TO COMPLY · disposed Oct 17, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedApr 15, 2021

PPN203 AOC SUB 11/12/2021 BY PRECISION ELEVATORCERT 429011 ROMAN SHYPUTA · disposed Nov 22, 2021

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDAug 1, 2020

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CHALLENGE APPROVED · disposed Oct 20, 2020

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 1, 2020

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

CHALLENGE APPROVED · disposed Oct 20, 2020

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDFeb 1, 2020

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PD INV#62182761 · disposed Jun 7, 2020

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDNov 26, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE #_62148329 · disposed Dec 15, 2019

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDNov 1, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PD INV#62182760 · disposed Jun 7, 2020

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDAug 1, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PD INV#62182759 · disposed Jun 7, 2020

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 1, 2019

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PD INV#62182758 · disposed Jun 7, 2020

FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED — V*-DOB VIOLATION - DISMISSEDApr 29, 2019

FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019

JNW DEMO SIGN-OFF JOB #122789143 9/2/2016 · disposed May 17, 2020

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDFeb 5, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE #62108391 · disposed Jul 22, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJan 22, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE #62108390 · disposed Jul 22, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDJan 22, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE #62108389 · disposed Jul 22, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDSep 18, 2018

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

ECB DOWNGRADED TO CLASS 2 OR 3 · disposed Apr 4, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDSep 18, 2018

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE #62108388 · disposed Jul 22, 2019

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDSep 18, 2018

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

SQS PAID INVOICE #62108388 · disposed Jul 22, 2019

EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDNov 30, 2016

VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST

CAT 1 PAID PENALTY FAILURE TO FILE · disposed Dec 5, 2017

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDNov 1, 2016

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PAID 12/06/2017 INV# 13311719 · disposed Dec 6, 2017

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDAug 1, 2016

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PAID 12/06/2017 INV#13311718 · disposed Dec 6, 2017

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDJun 1, 2016

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PAID 12/06/2017 INV# 13311714 · disposed Dec 6, 2017

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 23, 2015

PPN203 AOC SUB ON 7/23/15 BY SLADE INDUSTRIES CERT# 377023 ALFRED MARINGIONE · disposed Aug 16, 2015

LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMay 14, 2014

VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

RASCIA DISMISSED FULL PENALTY PAID $1000 INV#61648518 · disposed Feb 24, 2016

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDJun 2, 2013

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

DISMISSED · disposed Oct 29, 2013

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 2, 2012

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

PAID 12317687 · disposed Aug 22, 2012

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMay 6, 2008

PPN203 AOC SUB ON 121611 BY SLADE INDUSTRIES INSP ALFRED MARINGIONE CERT#37702 · disposed Mar 5, 2012

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedSep 14, 2006

PPN203 AOC SUB ON 121611 BY SLADE INDUSTRIES INSP ALFRED MARINGIONE CERT#37702 · disposed Mar 5, 2011

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedAug 8, 2005

PPN203 AOC SUB ON 121611 BY SLADE INDUSTRIES INSP ALFRED MARINGIONE CERT#37702 · disposed Mar 5, 2012

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 7, 2004

PPN203 AOC SUB ON 121611 BY SLADE INDUSTRIES INSP ALFRED MARINGIONE CERT#37702 · disposed Mar 5, 2011

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMar 18, 2003

IRICIA DISMISSED FULL PENALTY PAID $1500 INV# 60492463 CK# 162278883/50945 · disposed May 24, 2005

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMar 18, 2003

IRICIA DISMISSED FULL PENALTY PAID $1500 INV# 60492463 CK# 162278883/50945 · disposed May 24, 2005

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 3, 2000

1P606

CIAKST THE ADDRESS WAS SPELLED WRONG ON THIS VIOLATION. SEE NEW VIOLATION PVT#28 · disposed Oct 31, 2000

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 3, 2000

1P606

CIAESE ADM DISMISSAL/CURRENT 5YR TEST DONE ON 081309 · disposed Oct 10, 2011

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 17, 1999

1P606

AS PER INSPECTOR ROUTE SHEET · disposed Feb 15, 2000

LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED — V*-DOB VIOLATION - DISMISSEDMay 3, 1998

JMACIA OP49 SUBMITTED ATTESTING BLDG IS HEATED BY 304 MULBERRY ST · disposed Nov 4, 1998

LL10/80-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL — V*-DOB VIOLATION - DISMISSEDFeb 24, 1997

CAW AN AMENDED REPORT WAS FILED FOR THIS BLDG. AND THE VIOL. DISSM. ON 01- · disposed Jan 22, 1998

DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.

ECB violations

Environmental Control Board · NYC Open Data

Local Law — CLASS - 2ACTIVE · Apr 7, 2025

FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #900988. REMEDY: SUBMIT ACCEPTABLE REQUIRE

Penalty: $2,500 · balance due: $2,500

45 resolved, most recent Feb 12, 2020
Local Law — CLASS - 2RESOLVE · Feb 12, 2020

FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #800988.REM:SUBMIT ACCEPTABLE REQUIRED TECHNICAL REP

Construction — CLASS - 1RESOLVE · Feb 10, 2020

HOUSEKEEPING.AT TIME FO INSPECTION OF NEW 12 TSORY BUILDING ACTIEV JOBSIET BUILDING TOPPED OFF I OBSERVED ON NUMEROUS FOORS INADEQAUET HOUSEKEEPING CONSISTING IF SCATTERED CONSTRUCTION DEBRIS AND MATERIALS CAUS

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Feb 10, 2020

BC3301.2-NO CONTROLLLED ACCESS ZONE/GUARDRAILS AT TIME OF INSPECTION OF NEW 12 STORY BUILDING ACTIEV JOBSIET BUIDLING TOPPED OOF I OBSERVED WINDOWS BEING INSTALLED ON 11TH & 12TH STORY WITHOUT ANY GUARDRAIL SYS

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Feb 10, 2020

BC3314.8-SCAFFOLD GUARDRAIL/TOE VOARDS AT TIME OF INSPECTION OF NEW 12 STORY BUILDING ACTIVE JOBSITEBUILDING TOPPED OFF I OBSERVED SUPPORTE D PIPE SCAFFOLD AT EXPO #4 WITH MISSING TOE BOARDS THIS CONDITIONS CRE

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Oct 27, 2019

WORK WITHOUT A PERMIT AT THE TIME OF INSPECTION ON AN ACTIEV JOB SITE CURRENTLY AT ROOF LEVEL I OBSERVED TWO APARTMENTS 3A AND 3B AT 3RD STORY IN A RESIDENTIAL BUIDLING FULLY FURNISH WITH HOUSEHOLD ITEMS UPON M

Penalty: $1,250 · paid: $1,250

Unknown — CLASS - 1RESOLVE · Aug 30, 2019

FAILURE TO COMMUNICATE REQUIRED SAFETY ORIENTATION INFO. IN RESPONSE TO INCIDENT INVOLVING TZUL IXCOL OF GBS CARPENTERS,EMPLOYEE WAS RIPPINGSHIMS WHILE USING CIRCULAR SAW W/O STRAIGHT EDGE GUIDE. ORIENTATION WA

Penalty: $5,030 · paid: $5,030

Construction — CLASS - 2RESOLVE · Aug 30, 2019

3301.1.3 MANUFACTURE SPECIFICATIONS. IN RESPONSE TO INCIDENT INVOLVINGTZUL IXCOL OSHA#12-602089082. CARPENTER WAS RIPPING SHIMS W/ CIRCULAR SAW OPERATING AGAINST MANUFACTURE SPECIFICATIONS. WORKER WAS USING BUC

Penalty: $1,280 · paid: $1,280

Unknown — CLASS - 1RESOLVE · Aug 30, 2019

FAILURE TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. A WORKER CUT HIS FINGER EHEN JE WAS USING A HAND HELD POWER SAW. THE WORKER WAS TRANSPORTED TO A HOSPITAL BY AN AMBULANCE. AS

Penalty: $5,000 · paid: $5,000

Construction — CLASS - 1RESOLVE · Jul 15, 2019

WORK W/O PERMIT. AT THE TIME OF MY INSPECTION I OBSERVED A 12 STY NB @12 STY LEVEL-TOPPED OFF. THERE WAS NEEDLE BEAMS INSTALLED @ THE 10TH STY LEVEL @ EXP#3 W/SUPPORTED SCAFFOLD INSTALLED ON IT. UPON MY REQUEST

Penalty: $1,250 · paid: $1,250

Construction — CLASS - 1RESOLVE · Jul 15, 2019

SEC. 1704.1 FAILURE TO FILE SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO START OF WORK UNDER SPECIAL INSPECTION REQUIREMENTS 12 STY NEW BLDG @ ROOF LEVEL. AT THE TIME OF MY INSPECTION I OBSERVED A CO

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jul 15, 2019

SEC. 3308.5 FAILURE TO MAINTAIN VERTICAL SAFETY NETTING SYSTEM AS REQUIRED. 12 STY NEW BLDG @ ROOF LEVEL. AT THE TIME OF MY INSPECTION I OBSERVED THE VERTICAL NETTING SYSTEM THROUGHOUT THE JOBSITE WAS NOT BEING

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jul 15, 2019

FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING AS PER SECTION 12 STY NEW BLDG @ ROOF LEVEL. AT THE TIME OF MY INSPECTION I OBSERVED THE JOBSITES HOUSEKEEPING WAS INADEQUATE GARBAGE/DEBRIS & MATERIALS WAS DISORDELY

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jul 15, 2019

SEC. 3310.8.4 CONSTRUCTION SITE SAFETY MANAGER FAILED TO PERFORM DUTIES AS PER SITE. AT THE TIME OF MY INSPECTION I OBSERVED THE HAZARDOUS CONDITIONS ON THIS SITE THAT INDICATED THAT THE SITE SAFETY MANAGER WAS

Plumbing — CLASS - 1RESOLVE · Jul 15, 2019

FAILURE TO PERFORM HYDROSTATIC PRESSURE TEST-STANDPIPE. AT THE TIME OFMY INSPECTION I OBSERVED 12 STY BLDG @ 12TH STY LEVEL APPROX 178FT. UPON MY REQUEST FOR FINAL HYDROSTATIC TEST TO VERTIFY COMPLIANCE W/CODE

Unknown — CLASS - 2RESOLVE · Mar 19, 2019

FAILURE NOTIFY DEPARTMENT FOR MOBILE CRANE AFTER MAY 1, 2018. NO CRANEON SITE AT TIME OF INSPECTION. RESPONDENT WILLINGLY AND KNOWINGLY FAILED TO NOTIFY DEPT OF CRANES DEPARTURE AS REQUIRED NYC DOB CRANE NOTIFI

Unknown — CLASS - 2RESOLVE · Feb 25, 2019

RESPONDENT FAILED TO MAKE THE PROPER NOTIFICATION FOR MOBILE CRANES AFTER MAY 1ST2018. AT TIME OF INSPECTION IT WAS DISCOVERED NO MOBILE CRANE (CN:821/18) WAS ON SITE. NOTIFICATION WASMADE ON (10/02/2018) OF TH

Penalty: $5,000 · balance due: $5,000

Construction — CLASS - 2RESOLVE · Feb 4, 2019

UNCAPPED REBARS AT THE TIME OF MY INSPECTION AT AN ACTIVE JOBSITE,I OBSERVED UNCAPPED REBARS AT 9TH,10,11 & 12TH FL,CREATING A HAZARDOUS CONDITION FOR WORKERS & PERSONS WALKING BY. REMEDY: COMPLY W/CODE.

Construction — CLASS - 1RESOLVE · Feb 4, 2019

FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: AT THE TIME OF MY INSPECTION AT AN ACTIVE JOBSITE,RESPONDING TO COMPLAINT 1500890 WHERE SITE SAFETY MANAGER REPORTED THAT A

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 2RESOLVE · Feb 4, 2019

HOLES. NOTE: AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE,I OBSERVED HOLE LARGER THAT OF APPROX 6 INCHES AT DIFFERENT LOCATIONS AT MULTIPLE FLOORS. REMEDY: COVER & MARK THE HOLES.

Construction — CLASS - 1RESOLVE · Feb 4, 2019

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION &/OR APPROVED AMENDMENT. NOTE: AT THE TIME OF MY INSPECTION OF AN ACTIVE CONSTRUCTION SITE,I OBSERVE THAT THE HORIZONTAL NETTING IN PLACE WAS TIED BACK TO VERTICAL

Penalty: $2,500 · paid: $2,500

Unknown — CLASS - 2RESOLVE · Dec 17, 2018

AT THE TIME OF INSPECTION CRANE USER OF CRANE CD# 5027 CN #821/18 BENCHMARK CONTRACTING FAILED TO NOTIFY THE DEPARTMENT OF CRANES DEPARTUREFROM THE JOBSITE AT 304 MULBERRY ST AS REQUESTED BY LAW NO DEPARTURE

Penalty: $5,000 · balance due: $5,000

Construction — CLASS - 1RESOLVE · Nov 7, 2018

BC3301.2 UNSAFE MATERIAL HANDLING. IN RESPONSE TO AN INCIDENT WHERE A PIECE OF REBAR STRUCK A SUBWAY LAMP. IT WAS OBSERVED THAT SAFETY MEASURES FOR SAFE MATERIAL HANDLING WERE INADEQUATE DUE TO REBAR NOT BEING

Penalty: $2,530 · paid: $2,530

Construction — CLASS - 1RESOLVE · Oct 30, 2018

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AT THE TIME OF MY INSPECTION OF THE PROPOSED 12 STORIES BUILDING AT 3RD FL, I OBSERVED THE ENTRANCE TO THE SITE BETWEEN FENCE AN

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 1RESOLVE · Oct 30, 2018

BC 3301.5 UNSAFE CONDITIONS AND EQUIPMENT. AT THE TIME OF MY INSPECTION OF THE PROPOSED 12 STORIES BUILDING AT 3RD FL, I OBSERVED REBARS COVERED W/ WOOD NOT DESIGNED TO PROTECT INDIVIDUAL FROM BEING IMPALED IF

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jun 25, 2018

SEC: BC 3307.4. WARNING SIGNS,PERSONAL & BARRIERS. NOTE: @ TIME OF INSP OF A 12 STORY BLDG @ PARTIAL EXCAVATION & FOUNDATION PHASE, CONSTRUCTION WORK IN PROGRESS. OBSERVED WORK ZONE & STORAGE AREA ADJACENT TO T

Penalty: $1,250 · paid: $1,250

Construction — CLASS - 1RESOLVE · Jun 25, 2018

SEC: BC 3315.1.5. GUARDRAILS REQUIRED. NOTE: @ TIME OF INSP OF A 12 STORY BLDG IN PARTIAL EXCAVATION & FOUNDATION PHASE APPROX 18FT BELOW GRADE CONSTRUCTION WORK IN PROGRESS. OBSERVED AN EARTH FILL RAMP BEING U

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jun 25, 2018

SEC: BC 3307.7.5. DESIGN OF FENCE. NOTE: @ TIME OF MY INSP OF A 12 STORY BLDG @ PARTIAL FOUNDATION & EXCATION PHASE, CONSTRUCTION WORK IN PROGRESS. OBSERVED APPROX 50 LINEAR FEET OF CONSTRUCTION FENCE ERECTED @

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 1RESOLVE · Jan 16, 2018

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS. NOTE: @ TIME OF INSP OF A 12 STORY BLDG @ EXCAVATION PHASE, CONSTRUCTION WORK IN PROGRESS. OBSERVED ADJACENT PROPERTY EMERGENCY

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 1RESOLVE · Jan 16, 2018

SEC: BC 3307.7. FENCES. NOTE: @ TIME OF INSP OF A 12 STORY BLDG @ EXCAVATION PHASE CONSTRUCTION WORK IN PROGRESS. OBSERVED THAT THERE WERE NO FENCE IN PLACE @ EXP#4 AS REQUIRE TO ENCLOSED SITE. FAILURE TO PROVI

Penalty: $1,600 · paid: $1,600

Construction — CLASS - 1RESOLVE · Jan 16, 2018

SEC: BC 3301.1.2. FAILURE TO COMPLY W/ NYC FIRE CODE, GENERAL, NO FIRE WATCH FIRE GUARD. NOTE: @ TIME OF INSP OF A 12 STORY BLDG @ EXCAVATION PHASE, CONSTRUCTION WORK IN PROGRESS. OBSERVED TORCHING, BURNING & C

Penalty: $1,600 · paid: $1,600

Unknown — CLASS - 1RESOLVE · Jul 11, 2017

CONSTRUCTION SUPER FAILED TO PERFORM DUTIES. AT TIME OF INSPECTION FORA COMPLAINT ON AN ACTIVE SITE I ASKED TO VIEW SUPERLOG BOOK AT WHICH TIME I OBSERVED THAT LOGBOOK WAS INADEQUATE AND NOT UP TO DATE.RMDY:STO

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · Jul 11, 2017

3307.5 FLAG PERSON.AT TIME OF INSPECTION ON AN ACTIVE SITE OBSERVED WORKERS,WORKING ON TOP OF A TRUCK PASSING MATERIAL ONTO THE SIDEWALK SHED ON A BUSY STREET AT NO TIME DURING THE UNLOADING DID I OBSERVE FLAG

Penalty: $1,600 · paid: $1,601

Construction — CLASS - 1RESOLVE · Jul 11, 2017

NO SUPER ONSITE.@ TIME OF INSPECTION FOR A COMPLAINT OF AN ACTIVE JOB SITE,I REQUESTED TO SPEAK W/ JOB SUPER,I WAS INSTRUCTED BY A WORKER THAT THE SUPER WAS NOT PRESENT NOR HAD HE BEEN THERE ALL DAY.REM STOP AL

Unknown — CLASS - 1RESOLVE · Jul 11, 2017

DESIGN DRAWING.AT TIME OF INSPECTION FOR A COMPLAINT,OBSERVED WORKERS HOISTING STELL BEAM UPTHE BACK OF THE PIPE SCAFFOLD USING A ROPE AND APULLEY WHEEL WHEN I ASKED IF THERE WAS A DESIGN DRAWING FOR THAT SYST

Penalty: $500 · paid: $500

Construction — CLASS - 1RESOLVE · Jul 11, 2017

3307.4.7WORK OR STORAGE ZONES.AT TIME OF INSPECTION ON AN ACTIVE SITE I OBSERVED THAT A MATERIAL TRUCK BEING UNLOADED CLOSE TO THE SIDWALK SHED WITH NO PROTECTIVE BARRICADE TO PROTECT PEDESTRIANS WALKING ON THE

Penalty: $1,600 · paid: $1,601

Construction — CLASS - 1RESOLVE · Jul 11, 2017

3307.4.3VEHICLE TRAFFIC.AT TIME OF INSPECTION ON AN ACTIVE SITE I OBSERVED THAT A YODDA=OCK BARRIER SYSTEM WAS IN PLACE IN THE STREET TO BARRICADE OFF MATERIAL TRUCK.UPON THE STREET TO BARRICADE OFF MATERIAL

Penalty: $1,600 · paid: $1,601

Construction — CLASS - 1RESOLVE · Jul 11, 2017

3307.4NO WARNING LIGHTS ON BARRICADES.AT TIME OF INSPECTION ON AN ACTIVE SITE OBSERVED THAT A MATERIAL TRUCK WAS PARKED ON STREET SURROUNDED BY TRAFFIC BARRIERS BLOCKING PART OF THE STREET WITH NO WARNING LIGHT

Penalty: $1,600 · paid: $1,601

Construction — CLASS - 2RESOLVE · Jul 11, 2017

FAILURE TO PROVIDE/POST SIGN ON JOBSITE FENCE:AT TIME OF INSLPECTION FOR A COMPLAINT ON AN ACTIVE SITE OBSERVED THAT JOBSITE FENCE DID NOT HAVE PROJECT PANEL POSTED AT MULBERRY ST ENTRANCE TO SITE.REMEDY:POST

Penalty: $400 · paid: $400

Elevators — Non-HazardousRESOLVE · Nov 28, 2007

25B07.25B-PROVIDE SUFFICIENT ACCESS THRU EMG - EXIT OPENING.

Penalty: $180 · paid: $180

Elevators — Non-HazardousRESOLVE · Apr 8, 2007

86M5/.MISSING 2YR TEST TAG-PERFORM FILE TEST.

Site Safety — HazardousRESOLVE · Mar 12, 2006

APPROVED PLANS NOT AVAILABLE FOR INSPECTION EXPIRED (2/27/06) LICENSED RIGGER DESIGNATED AN UNQUALIFIED FOREMAN. A. NO FOREMAN ON SITE. 2PT. SUSUPENDED SCAFFOLDS HANGING WITH EXPIRED PLANS.

Penalty: $750 · paid: $750

Local Law — HazardousRESOLVE · Jan 20, 1998

FAILURE TO FILE AN AMENDED ROUND FOUR REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. B(5),INDICATING CORRECTION OF HAZARDOUS CONDITIONS DESCRIBED INITIAL LL10/80 REPORT.REMEDY FILE AN AMENDED

Penalty: $400 · paid: $400

Local Law — HazardousRESOLVE · Nov 25, 1997

FAILURE TO FILE AN AMENDED ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT PUSUANT TO RULE R.C.N.Y 32-03B(5), INDICATING CORRECTION OF HAZARDOUS CONDITIONS DESCRIBED IN INITIAL LL10/80 REPORT. REMEDY: FILE AN AMENDE

Penalty: $1,000 · paid: $1,000

Local Law — HazardousRESOLVE · Aug 6, 1997

FAILURE TO FILE AN AMENDED ROUND FOUR REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO R.C.N.Y 32-03B(5), INICATING CORRECTION OF HAZARDOUS CONDITIONS DECRIBED IN INITIAL LL10/80 REPORT REMEDY FILE AN AMENDED R

Local Law — HazardousRESOLVE · May 29, 1997

FAILURE TO FILE AN AMENDED ROUND FOUR REPORT ACCETABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5) INDICATING CORRECTION OF HAZARDOUS CONDITIONS DESCRIBED IN INITIAL LL10/80 REPORT. REMEDY: FILE AN

Penalty: $500 · paid: $500

ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.

Certificates of occupancy

DOB · NYC Open Data

Renewal Without Change61 dwelling unitsCO Issued · Nov 3, 2021 · DOB NOW
10 earlier certificates
Final61 dwelling unitsCO Issued · Nov 2, 2023 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Oct 17, 2022 · DOB NOW
Renewal With Change61 dwelling unitsCO Issued · Aug 11, 2021 · DOB NOW
Renewal With Change61 dwelling unitsCO Issued · Aug 5, 2022 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Jul 14, 2022 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Jun 26, 2023 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Apr 11, 2022 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Apr 4, 2023 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Jan 20, 2022 · DOB NOW
Renewal Without Change61 dwelling unitsCO Issued · Jan 10, 2023 · DOB NOW

DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.

What are you trying to do here?

Public records for 40 BLEECKER STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.