Built in 2014, 39 residences across 11 floors.
520 West 28th Street, 10001
520 West 28th Street was designed by Zaha Hadid Architects, eleven storeys and 39 residences beside the High Line. It was the practice's only building in New York.
The facade is hand worked steel, brushed and tinted, laid in interlocking chevrons with laser cut stainless trim, and the chevrons are not decoration. They express the split levels inside, so the pattern on the elevation follows where floors step against each other. No two apartments share a shape.
Two conditions follow. Ceilings are coffered and run around eleven feet, so anything mounted overhead sits within the coffer grid rather than on a flat plane, and lighting is laid out to that grid or it fights it. And because levels split within apartments, a plan here has changes of floor level inside the residence, which decides circulation and rules out long uninterrupted runs of anything.
Within walking distance
Building facts
Built
2014
Floors
11
Residences
39
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1006997503.
Public records show 520 WEST 28 STREET was built in 2014 and rises 25 floors with 40 residential units (NYC MapPLUTO, version 26v2). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 35 job filings on record for this lot (NYC Open Data).
Public record
Total units
41
Total permits
35
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1006997503. Violations and permits as of October 27, 2026.
7 filings in the last 24 months, 1 open violation, last filing Oct 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
UPGRADE EXISTING HVAC UNITS IN CONJUNCTION WITH THE MODIFICATION TO COMMERCIAL SPACE AT 1ST FLOOR , WORK INVOLVE RE-UTILIZING OF (2) EXISTING AIR HANDLER , PROVIDE 3 NEW TOILET EXHASUTFANS FOE NEW BATHROOM , AND INSTALLATION OF VARIABLE AIR VOLUME..
Filed estimated cost: $60,000 (as filed, not verified)
MODIFY EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Filed estimated cost: $67,750 (as filed, not verified)
REMOVE AND INSTALL NEW PLUMBING FIXTURES IN A REMODELING OF COMMERCIAL SPACE AT 1ST FLOOR , ALL AS PER PLAN . NO CHANGE IN USE EGRESS OR OCCUPANCY .
Filed estimated cost: $60,000 (as filed, not verified)
COMMERCIAL SPACE ALTERATION ON THE 1ST FLOOR TO INCLUDE REMOVAL AND CONSTRUCTION OF PARTITIONS AND FINISHES. ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $240,000 (as filed, not verified)
FILING TO RELOCATE AN OPENING BETWEEN THE RETAIL SPACE AND BACK-OF-HOUSE SPACE AT 514 WEST 28TH STREET AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $10,000 (as filed, not verified)
Interior renovation of existing apartment. Modify non-load bearing partitions and finishes. No change in use, egress, or occupancy.
Filed estimated cost: $20,000 (as filed, not verified)
Application being filed to show the installation of Plumbing and Gas fixtures on the outdoor terrace of Apartment 34 on the17th Floor as per plans filed herewith. No change in use, egress, or occupancy
Filed estimated cost: $4,000 (as filed, not verified)
Application being filed to show the installation of Plumbing and Gas fixtures on the outdoor terrace of Apartment 34 on the17th Floor as per plans filed herewith. No change in use, egress, or occupancy
Filed estimated cost: $4,000 (as filed, not verified)
Application being filed to show the installation of Plumbing and Gas fixtures on the outdoor terrace of Apartment 34 on the17th Floor as per plans filed herewith. No change in use, egress, or occupancy
Filed estimated cost: $4,000 (as filed, not verified)
INTERIOR RENOVATION IN UNIT 5 ON THE 4TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $175,525 (as filed, not verified)
Filing application for installation of outdoor terrace kitchen and wood decking for a hot tub.All plumbing work to be filed separately in DOB NOW. No change to use, egress, or occupancy.
Filed estimated cost: $350,000 (as filed, not verified)
Filing application for installation of plumbing fixtures for outdoor terrace kitchen and a drain for a hot tub.
Filed estimated cost: $20,001 (as filed, not verified)
INTERIOR RENOVATION FOR TENANT FITOUT IN TWO RETAIL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $335,000 (as filed, not verified)
MECHANICAL WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF TWO RETAIL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $10,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF TWO RETAIL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $20,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF TWO RETAIL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $20,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF TWO RETAIL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $20,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF TWO RETAIL SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $20,000 (as filed, not verified)
New steel framed pergola and platform at sauna.
Filed estimated cost: $18,000 (as filed, not verified)
New roof drains and leader for solar canopy, and cut and connect domestic water piping &sanitary/vent to proposed fixtures.
Filed estimated cost: $21,000 (as filed, not verified)
New roof drains and leader for solar canopy, and cut and connect domestic water piping &sanitary/vent to proposed fixtures.
Filed estimated cost: $21,000 (as filed, not verified)
Roof terrace renovation for a penthouse unit, including on-structure gathering space, seating, outdoor kitchen, spa & cold plunge pool, paving, built-in raised planters, green walls, water features, furnishings, and accent lighting.
Filed estimated cost: $94,000 (as filed, not verified)
PROJECT TO BE AN ALTERATION TYPE 2. EXTERIOR WORK TO INCLUDE NEW PHOTOVOLTAIC CANOPY, PLUNGE POOL, HOT TUB AND WATER FEATURE4. EXISTING NATURAL GAS BBQ ISLAND TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $764,000 (as filed, not verified)
PROJECT TO BE AN ALTERATION TYPE 2. EXTERIOR WORK TO INCLUDE NEW PHOTOVOLTAIC CANOPY, PLUNGE POOL, HOT TUB AND WATER FEATURE4. EXISTING NATURAL GAS BBQ ISLAND TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $764,000 (as filed, not verified)
PROJECT TO BE AN ALTERATION TYPE 2. EXTERIOR WORK TO INCLUDE NEW PHOTOVOLTAIC CANOPY, PLUNGE POOL, HOT TUB AND WATER FEATURE4. EXISTING NATURAL GAS BBQ ISLAND TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $764,000 (as filed, not verified)
PROJECT TO BE AN ALTERATION TYPE 2. EXTERIOR WORK TO INCLUDE NEW PHOTOVOLTAIC CANOPY, PLUNGE POOL, HOT TUB AND WATER FEATURE4. EXISTING NATURAL GAS BBQ ISLAND TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $764,000 (as filed, not verified)
PROJECT TO BE AN ALTERATION TYPE 2. EXTERIOR WORK TO INCLUDE NEW PHOTOVOLTAIC CANOPY, PLUNGE POOL, HOT TUB AND WATER FEATURE4. EXISTING NATURAL GAS BBQ ISLAND TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $764,000 (as filed, not verified)
Application being filed to perform minor work including a new outdoor terrace kitchen and to tap and install a new outdoor gas, electric and water lines from existing. No change in use, egress or occupancy.
Filed estimated cost: $18,400 (as filed, not verified)
Application being filed to perform minor work including a new outdoor terrace kitchen and to tap and install a new outdoor gas, electric and water lines from existing. No change in use, egress or occupancy.
Filed estimated cost: $18,400 (as filed, not verified)
FILING HEREWITH PLUMBING WORK TO RELOCATE STAND ALONE FLAME ENCLOSED STANILESS STEEL GAS BBQ AT 022 FLOOR OSP CONCRETE PAVERED ROOF AREA OF A NEW NON FIREPROOF BUILDING. ALL AS PER PLAN.
Filed estimated cost: $3,000 (as filed, not verified)
REMOVAL OF AN EXISTING BATHROOM AND WALK-IN CLOSET, MINOR PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $95,195 (as filed, not verified)
PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $4,500 (as filed, not verified)
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF A CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $5,000 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development contacted an occupant of the apartment and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DELETED BY CAW ON 05/23/23 BECAUSE REMOVE FROM FISP 9A
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
CIANOW CRM Violation Dismissed · disposed Feb 9, 2022
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
000810 PAID INVOICE 90348141 · disposed Nov 15, 2020
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
NB W/ 1ST TCO LESS THAN10 YRS OLD AT TIME DUE TO COMPLY · disposed Sep 10, 2020
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
000810 PAID INVOICE 90348139 · disposed Nov 15, 2020
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY PD $1000 INV#62170201 CHK#20003505 · disposed Feb 27, 2020
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY PD $1000 INV#62170201 CHK#20003505 · disposed Feb 27, 2020
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY PD $1000 INV#62170201 CHK#20003505 · disposed Feb 27, 2020
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT1 FINAL ISSUED 5/24/2017 · disposed Aug 27, 2018
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT1 FINAL ISSUED 05/24/2017 · disposed Aug 27, 2018
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Jun 18, 2017
VIOL RE-INSPECTED & COMPLIED WITH · disposed Jul 28, 2016
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed Apr 28, 2016
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed Apr 28, 2016
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed Apr 28, 2016
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed Apr 28, 2016
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed Apr 28, 2016
VIOLATION RE-INSPECTED & COMPLIED WITH · disposed Apr 28, 2016
CANCELLED VACANT LAND · disposed Oct 27, 1997
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #917387.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE
ANNUAL BRAKE TAG/EXPIRED/TAG DEVICE
Penalty: $625 · paid: $754
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR JOB #12310551Z. NOTED: SPRINKLER HEAD COUNT NOT AS PER PLAN (SCHEDULE B & PLAN SHOWS 29 HEADS, FOUND 25. REM: CONFORM TO A
FILED A CERTIFICATE, FORM, APPLICATION ETC. CONTAINING A MATERIAL FALSE STATEMENT(S). DURING MY INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE I OBSERVED ON THE 21ST FLOOR SPRINKLER HEADS WITH 2X2 PIECE OF S
PSWO SUSPENDED SCAFFOLD WORK DOESN'T CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS.NOTED:@TIME OF INSPECTION SUSPENDEDSCAFFOLD IN USE PLAND NOT A REMOTE W.20 FOOT THE ONE IN USE IS 16FT NO
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY BY CONSTRUCTION OPERATIONS. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT EXCAVATION AT EXP1 UNDERMINE THE SIDEWALK WHERE THE SIDEWALK SHED IS LOCATED.THE EXCAVATI
Penalty: $10,000 · paid: $10,000
FAILURE TO MAINTAIN. NOTED: ROTOR WHEEL CAME OFF THE HOIST (#1V23354, SOUTH WEST CORNER) DWRNY OPERATION & LANDED ONTO ADJACENT PROPERTY. HOIST PERMIT# 122379318. PSWO ISSUED PURSUANT TO 28-207.2 & POSTED @ PRE
Penalty: $1,600 · paid: $1,600
SEC. 3301.2 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES ORTEMPORARY CONSTRUCTION. NOTE: AT THE TIME OF MY INSPECTION OF A 25 STY BLDG AT BULKHEAD LEVEL CONSTRUCTION WORK IN PROGRESS. I OBSERVED WORK
SEC. 3308.6.2.11 HORIZONTAL NETTING HOUSEKEEPING/CLEANING. NOTE: AT THE TIME OF MY INSPECTION OF A 25 STY BLDG AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED HORIZONTAL NETTING AT EXP#4 THAT IS IN
Penalty: $1,600 · paid: $1,600
SEC. 3301.4 INSPECTION. NOTE: AT THE TIME OF MY INSPECTION OF A 25 STYBLDG AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED SAFETY EMBEDED STRAPS BEING USE BY MASONRY & WINDOW OPERATION CREW,UPON REQ
Penalty: $1,600 · paid: $1,600
SEC. 3301.1.1 RESPONSIBILITY OF SAFETY. NOTE: AT THE TIME OF MY INSPECTION OF A 25 STY BLDG AT BULKHEAD,CONSTRUCTION WORK IN PROGRESS. I OBSERVED WORKERS AT PERIMETER EDGE PERFORMING WINDOW INSTALLATION. I ALSO
Penalty: $1,600 · paid: $1,600
SEC. 3310.10.2 TRAINING-OSHA. NOTE: AT THE TIME OF MY INSPECTION OF A 25 STY BLDG AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED A WORKER AT PERIMETER EDGE ON ROOF LEVEL PERFORMING MASONRY OPERATIO
Penalty: $1,600 · paid: $1,600
SEC. 3301.1.3 MANUFACTURER SPECIFICATIONS. NOTE: AT THE TIME OF MY INSPECTION OF A 25 STY BLDG AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED FALL PROTECTION SYSTEM BEING USE AT PERIMETER EGDES BY
Penalty: $1,600 · paid: $1,600
SEC. 3307.6.3 AREA TO BE PROTECTED. NOTE: AT THE TIME OF MY INSPECTIONOF A 25 STY BLDG AT BULKHEAD LEVEL,APPROX 135FEET IN HEIGHT CONSTRUCTION WORK IN PROGRESS. I OBSERVED SIDEWALK SHED INSTALED DID NOT EXTEND
Penalty: $1,600 · paid: $1,600
WORK DOES NOT CONFORM TO APPROVED SITE SAFETY PLAN OR JOBSITE-NOTE-AT TIME OF INSP.OBSERVED HOIST INSTALLED AT SOUTH ELEVATION STOREING NETTING BETWEEN HIGH AND NEW BLDG INSTEAD OF SIDEWALK SHED AND NO INDICATI
DESIGN DRAWING REQUIRED.NOTE AT TIME OF INSP.ACTIVE JOBSITE OBSERVED PALNK PLATFORM WITH GOING LADDER INSTALLED IN ELEVATOR SHFT WAY BETWEEN A & B BUILDING WHERE FLOOR ARE AT DIFFERENT HEIGHT ELEVATION.NO DESIG
Penalty: $1,600 · paid: $1,600
FAILUE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.NOTE OBSERVED ON 9/10/11 FOR ACCUMILATION OF DEBRIS PILES CONSIST OF VARIOUS TYPES OF WOODEN MATERIAL AND DRIED UP CONCRETE FROM POUR THAT HAS LE
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NOTE: AT THE TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS. I OBSERVED THAT THERE WERE NO OVERHEAD PROTECTION PROVIDED FOR
Penalty: $1,000 · paid: $1,000
SEC. 3307.3.2 FAILURE TO PROVIDE FENCE AS REQUIRED. NOTE: AT THE TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS OF A 25 STY BLDG AT 2NDFL LEVEL,I OBSERVED THAT THERE WERE NO FENCE PROVIDED AT EXP#4 TO ENCL
3301.7,FAILURE TO PROVIDE PE APPROVED DESIGN DRAWINGS.AS NOTED @ TIME OF INSP,MAKING REPAIR TO CAR LIFT BY CHOPPING OUT CONCRETE THAN WAS POURED IN ERROR.NO PR DESIGN FOR REPAIR WORK BEING CONDUCTED ON SHEAR WA
FAILURE TO SAFEGUARD ALL PERSONS/PROPERTY AFFECTED BY CONST OPERATIONS.NO REBAR CAPS.@ TIME OF INSP I OBSERVED ACTIVE CONCRETE ;05 W/ FOUNDATION WORK IN PROGRESS.MEN WORKING ON FORMS REBAR WORK CHIPPING ROCK.TH
Penalty: $2,400 · paid: $2,400
SEC. 3301.7 DESIGN DRAWING REQUIRED BY PROVISION CHAPTER 33 OF NYC B.C.AT TIME OF INSPECTION I OBSERVED A CONCRETE JOBSITE IN FOUNDATION/CELLAR PHASE. MEN WORKING ON FORM WORK,DEBRIS BEING REMOVAL,MEN CHIPPING
Penalty: $1,600 · paid: $1,600
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ATTIME OF INSPECTION I OBSERVED ACTIVE CONCRETE JOB W/I FOUNDATION PHASE,MEN WORKING ON FORM WORK,MEN CHIPPING(RAH). IN VARIOUS AREA'S OF THE
Penalty: $2,400 · paid: $2,400
SEC. 3301.2;27-1009(A) HOLES/OPENINGS NOT CONVERED. AT TIME OF INSPECTION I OBSERVED ACTIVE CONCRETE JOB IN PROGRESS. FOUNDATION WORK ON GOING. MEN DOING FORM WORK,REBAR WORK,MEN CHIPPING ROCK. VARIOUS AREAS OF
Penalty: $400 · paid: $400
BC3367.2.1 FAILURE TO INSTALL TEMPORARY LIGHTING IN PEDESTRICAN WALKWAY AT EXP1 OF CONSTRUCTION SITE AS REQUIRED BY CODE.AT TIME OF INSPECTION OBSERVED NO LIGHTING AFFIXED TO CONSTRUCTION FENCE.RMDY:COMPLY W/CO
Penalty: $400 · paid: $400
SEC. 3301.7 DESIGN REQUIRED; TEMPORARY PLATFORMS. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. 2 TEMPORARY PLATFORMS BUILT AT EXPOSURE 1 OF JOBSITE. PLATFORMS ARE BUILT ON OUTRIGGER BEAMS APPROX 4FT WIDE BY
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 520 WEST 28 STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.