← Buildings

Lantern House

Built in 2018, 181 residences across 21 floors.

515 West 18th Street, 10011

515 West 18th St

Lantern House was designed by Heatherwick Studio with SLCE Architects as architect of record. It is two buildings, of ten and twenty two storeys, standing either side of the High Line and joined beneath it, with 181 residences between them.

The idea is a bay window taken from Victorian and Edwardian terraces and rebuilt at a scale the terraces never attempted. Bays are stacked in pairs across two storeys and held between heavy brick piers, so the elevation reads as a run of bulging glass alternating with masonry. The brickwork is custom and the metalwork bronze.

A bay changes a room more than a flat window does. It pushes the glass out past the face of the building, so the floor area at the perimeter gains a shallow alcove with glass on three sides and light arriving from angles a flat window cannot deliver. That alcove is the natural place for seating and the hardest place to fit storage, because the walls that would carry it are glazed. Ceilings run around ten feet.

Within walking distance

107 mDavid Zwirner · gallery
153 mJack Shainman Gallery · gallery
475 mGladstone Gallery · gallery
475 mMatthew Marks Gallery · gallery
480 mLuhring Augustine · gallery
500 mGagosian · gallery

Building facts

Built

2018

Floors

21

Residences

181

New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1006907503.

Public records show 515 WEST 18TH STREET was built in 2018 and rises 21 floors with 181 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).

Public record

Total units

183

Total permits

50 or more

NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1006907503. Violations and permits as of October 27, 2026.

15 filings in the last 24 months, 2 open violations, last filing Sep 2026

The record

Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.

DOB NOW filings from June 2016.

SignFiled by CITY SIGNS INClic. 000198Signed-off · Aug 3, 2026 · job M01422481-I1

ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - LA CABRA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $600 (as filed, not verified)

StructuralFiled by BR CONSTRUCTION GROUP INClic. 621363Permit Issued · Apr 30, 2026 · job M01281712-I1

Proposed renovation of an existing BBQ amenity located on the roof area accessory to the penthouse residential unit that includes cosmetic improvements and minor structural work. No change in use or occupancy under this application.

Filed estimated cost: $197,000 (as filed, not verified)

General ConstructionFiled by BR CONSTRUCTION GROUP INClic. 621363Permit Issued · Apr 30, 2026 · job M01281712-I1

Proposed renovation of an existing BBQ amenity located on the roof area accessory to the penthouse residential unit that includes cosmetic improvements and minor structural work. No change in use or occupancy under this application.

Filed estimated cost: $197,000 (as filed, not verified)

SprinklersFiled by EXPERT FIRE SPRINKLER,LLClic. 000474Signed-off · Mar 9, 2026 · job M01074699-S3

RELOCATE EXISTING SPRINKLER PIPING AND HEADS AS PER PLAN, THERE IS NO CHANGE OF EGRESS, USE AND OCCUPANCY.

Filed estimated cost: $28,000 (as filed, not verified)

General ConstructionFiled by NICON BUILD LLClic. 621962Signed-off · Sep 15, 2025 · job M01215753-I1

Removal of Structure as per plans filed herewith. No change in use, occupancy and egress under this application.

Filed estimated cost: $1,000 (as filed, not verified)

General ConstructionFiled by FLO RESTORATION INClic. 622907Signed-off · Dec 2, 2024 · job M01118979-I1

At apartment 1703, removal of non load bearing walls, construct new non load bearing walls, new gypsum board ceilings and miscellaneous finishes as per plans. No change in use, egress or occupancy.

Filed estimated cost: $36,000 (as filed, not verified)

General ConstructionFiled by FLO RESTORATION INClic. 622907Signed-off · Dec 2, 2024 · job M01118979-I1

At apartment 1703, removal of non load bearing walls, construct new non load bearing walls, new gypsum board ceilings and miscellaneous finishes as per plans. No change in use, egress or occupancy.

Filed estimated cost: $36,000 (as filed, not verified)

StructuralFiled by V. DISALVO CONTRACTING COlic. 003722Signed-off · Sep 4, 2024 · job M00862321-S3

FILING FOR WORK ON AN EXISTING PRIVATE TERRACE ONLY. INSTALLATION OF TWO (2) AWNINGS, WHICH COMPLY WITH ALL ALLOWED AWNING REGULATIONS AS SHOWN ON PLANS. NO: INTERIOR WORK OR CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.

Filed estimated cost: $10,000 (as filed, not verified)

General ConstructionFiled by V. DISALVO CONTRACTING COlic. 003722Signed-off · Aug 7, 2024 · job M00862321-S2

FILING WORK ON AN EXISTING PRIVATE TERRACE ONLY. INSTALLATION OF TWO (2) AWNINGS, WHICH COMPLY WITH ALL ALLOWED AWNING REGULATIONS AS SHOWN ON PLANS. NO: INTERIOR WORK AND CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.

Filed estimated cost: $10,000 (as filed, not verified)

PlumbingFiled by NEW PHASE PLUMBING & HEATlic. 001842Permit Issued · Jul 4, 2024 · job M01074699-S1

PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $32,550 (as filed, not verified)

PlumbingFiled by NEW PHASE PLUMBING & HEATlic. 001842Permit Issued · Jul 4, 2024 · job M01074699-S1

PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $32,550 (as filed, not verified)

Mechanical SystemsFiled by DE LUX CONSTRUCTION INClic. 616843Permit Issued · Jul 2, 2024 · job M01074699-I1

RENOVATIONS TO RETAIL_CAFE SPACE AND MODIFICATION TO ASSOCIATED MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $317,840 (as filed, not verified)

Mechanical SystemsFiled by DE LUX CONSTRUCTION INClic. 616843Permit Issued · Jul 2, 2024 · job M01074699-I1

RENOVATIONS TO RETAIL_CAFE SPACE AND MODIFICATION TO ASSOCIATED MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $317,840 (as filed, not verified)

General ConstructionFiled by DE LUX CONSTRUCTION INClic. 616843Permit Issued · Jul 2, 2024 · job M01074699-I1

RENOVATIONS TO RETAIL_CAFE SPACE AND MODIFICATION TO ASSOCIATED MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $317,840 (as filed, not verified)

General ConstructionFiled by DE LUX CONSTRUCTION INClic. 616843Permit Issued · Jul 2, 2024 · job M01074699-I1

RENOVATIONS TO RETAIL_CAFE SPACE AND MODIFICATION TO ASSOCIATED MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $317,840 (as filed, not verified)

29 earlier filings, 2022–2024
Mechanical SystemsFiled by SILVERLINING INTERIORSlic. 003979Signed-off · Aug 19, 2024 · job M01055259-I1

Renovation of an existing apartment#506 on the 5th Floor. Work includes non-structural demolition, general construction and mechanical as per plans filed herewith. No change to use, egress or occupancy.

Filed estimated cost: $201,700 (as filed, not verified)

General ConstructionFiled by SILVERLINING INTERIORSlic. 003979Signed-off · Aug 19, 2024 · job M01055259-I1

Renovation of an existing apartment#506 on the 5th Floor. Work includes non-structural demolition, general construction and mechanical as per plans filed herewith. No change to use, egress or occupancy.

Filed estimated cost: $201,700 (as filed, not verified)

General ConstructionFiled by BABA CONSTRUCTION CORPlic. 623892Signed-off · Jun 13, 2024 · job M01054197-I1

APPLICATION FILED TO INSTALL NEW LIGHTING FIXTURES, OUTLET AND SOFFIT AT EXISTING CLASS A APARTMENT #1904 ON THE 19th FLOOR

Filed estimated cost: $13,500 (as filed, not verified)

General ConstructionFiled by QUAD CONTRACTING LLClic. 625562Signed-off · May 20, 2024 · job M01039939-I1

INSTALL (2) FAUX GYPSUM BOARD CEILING, NEW LIGHTING AND MINOR INTERIOR RENOVATIONS AT EXISTING CLASS A APARTMENT. NO CHANGE IN USE , EGRESS OR OCCUPANCY.

Filed estimated cost: $67,490 (as filed, not verified)

Suspended ScaffoldPermit Issued · Apr 2, 2024 · job M01023909-I1

WINDOW INSPECTION AT ALL ELEVATIONS VIA INDUSTRIAL ROPE ACCESS

Filed estimated cost: 0 (as filed, not verified)

General ConstructionFiled by AIK RENOVATION INClic. 617064Signed-off · Aug 22, 2023 · job M00863282-I1

COMBINATION OF APTS PH2202 AND PH2201 FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $52,500 (as filed, not verified)

General ConstructionFiled by AIK RENOVATION INClic. 617064Signed-off · Aug 22, 2023 · job M00863282-I1

COMBINATION OF APTS PH2202 AND PH2201 FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $52,500 (as filed, not verified)

Mechanical SystemsFiled by AIK RENOVATION INClic. 617064Signed-off · Aug 22, 2023 · job M00863282-S3

MH WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $30,000 (as filed, not verified)

Mechanical SystemsFiled by AIK RENOVATION INClic. 617064Signed-off · Aug 22, 2023 · job M00863282-S3

MH WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $30,000 (as filed, not verified)

PlumbingFiled by DONATO PLUMBING, INClic. 002424Signed-off · Jun 20, 2023 · job M00863282-S1

PL FIXTURES IN THE COMBINATION OF APTS PH2202 AND PH2201 FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW GC, SP AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $7,500 (as filed, not verified)

PlumbingFiled by DONATO PLUMBING, INClic. 002426Signed-off · Jun 20, 2023 · job M00863282-S1

PL FIXTURES IN THE COMBINATION OF APTS PH2202 AND PH2201 FILED UNDER TPPN 3/97 IN CONJUNCTION WITH DOB NOW GC, SP AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $7,500 (as filed, not verified)

SprinklersFiled by KG SPRINKLER CORPlic. 000738Signed-off · Jun 20, 2023 · job M00863282-S2

SP WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

Filed estimated cost: $5,250 (as filed, not verified)

PlumbingFiled by A + SPRINKLER CORPlic. 000765Signed-off · Jun 5, 2023 · job M00856430-I1

PLUMBING AND SPRINKLER WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $20,000 (as filed, not verified)

General ConstructionFiled by INTEGRATED PROJECT DELIVElic. 605408Signed-off · Jun 5, 2023 · job M00856369-I1

GENERAL CONSTRUCTION AND MECHANICAL WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $110,000 (as filed, not verified)

Mechanical SystemsFiled by INTEGRATED PROJECT DELIVElic. 605408Signed-off · Jun 5, 2023 · job M00856369-I1

GENERAL CONSTRUCTION AND MECHANICAL WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $110,000 (as filed, not verified)

Mechanical SystemsFiled by INTEGRATED PROJECT DELIVElic. 605408Signed-off · Jun 5, 2023 · job M00856369-I1

GENERAL CONSTRUCTION AND MECHANICAL WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $110,000 (as filed, not verified)

General ConstructionFiled by INTEGRATED PROJECT DELIVElic. 605408Signed-off · Jun 5, 2023 · job M00856369-I1

GENERAL CONSTRUCTION AND MECHANICAL WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $110,000 (as filed, not verified)

SprinklersFiled by A + SPRINKLER CORPlic. 000765Signed-off · Jun 5, 2023 · job M00856430-I1

PLUMBING AND SPRINKLER WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1104 AND 1803 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $20,000 (as filed, not verified)

PlumbingFiled by SUPER PLUMBERS CORPlic. 002518Signed-off · Apr 30, 2023 · job M00862321-S1

HEREWITH FILING SUBSEQUENT ALTERATION TYPE II FOR PLUMBING WORK TO RELOCATE FIXTURES ON TERRACE OF APT. 1001. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

General ConstructionFiled by V. DISALVO CONTRACTING COlic. 003722Signed-off · Apr 27, 2023 · job M00862321-I1

FORMALLY FILING ALTERATION TYPE II FOR ALTERATION TO TERRACE OF APT. 1001. NO CHANGE IN USE, OCCUPANCY, AND EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $5,000 (as filed, not verified)

General ConstructionFiled by BABA CONSTRUCTION CORPlic. 623892Signed-off · Mar 30, 2023 · job M00849640-I1

Installation of drop ceiling in great room. No change of use, egress or occupancy under this application.

Filed estimated cost: $40,020 (as filed, not verified)

General ConstructionFiled by FLO RESTORATION INClic. 622907Signed-off · Mar 2, 2023 · job M00832245-I1

GENERAL CONSTRUCTION OF NEW FRAMED PARTITIONS LOWER EXISTING CEILING FRAME. FOR INSTALLATION OF RECESSED LIGHTING IN BEDROOM AND FINISHES. INSTALL NEW PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $10,500 (as filed, not verified)

StructuralFiled by TERRY DESIGN INClic. 614265Signed-off · Oct 24, 2022 · job M00750219-I1

STRUCTURAL WORK ON ROOF. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $6,000 (as filed, not verified)

General ConstructionFiled by TERRY DESIGN INClic. 614265Signed-off · Oct 18, 2022 · job M00789712-I1

ARCHITECTURAL RENOVATION OF EXISTING 4TH FLOOR ROOF TERRACE AND INSTALLATION OF PERGOLA FOR APARTMENT #421. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $76,000 (as filed, not verified)

StructuralFiled by TERRY DESIGN INClic. 614265Signed-off · Oct 12, 2022 · job M00703476-I1

STRUCTURAL INSTALLATION ON THE EXISTING 4TH FLOOR TERRACE FOR APARTMENT #421 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $19,000 (as filed, not verified)

General ConstructionFiled by INTEGRATED PROJECT DELIVElic. 605408Signed-off · Jul 11, 2022 · job M00757904-I1

GENERAL CONSTRUCTION & MECHANICAL WORK (INCLUDING RELOCATION OF 1 EXISTING VERTICAL FAN COIL UNIT TO THE CEILING IN EACH APT) RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1404 AND 1903 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS & OCCUPANCY.

Filed estimated cost: $119,091 (as filed, not verified)

Mechanical SystemsFiled by INTEGRATED PROJECT DELIVElic. 605408Signed-off · Jul 11, 2022 · job M00757904-I1

GENERAL CONSTRUCTION & MECHANICAL WORK (INCLUDING RELOCATION OF 1 EXISTING VERTICAL FAN COIL UNIT TO THE CEILING IN EACH APT) RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1404 AND 1903 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS & OCCUPANCY.

Filed estimated cost: $119,091 (as filed, not verified)

PlumbingFiled by A PLUS PLUMBING CORPlic. 002354Signed-off · Jul 8, 2022 · job M00757983-I1

PLUMBING AND SPRINKLER WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1404 AND 1903 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $19,228 (as filed, not verified)

SprinklersFiled by A + SPRINKLER CORPlic. 000765Signed-off · Jul 8, 2022 · job M00757983-I1

PLUMBING AND SPRINKLER WORK RELATED TO THE RENOVATION OF EXISTING APARTMENTS 1404 AND 1903 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $19,228 (as filed, not verified)

4 resolved
HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

HPD Violation · Class CVIOLATION CLOSED · issued Sep 24, 2025

§ 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN DOOR STOP AT PUBLIC HALL, 10th STORY

HPD Violation · Class CVIOLATION CLOSED · issued Sep 24, 2025

§ 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN DOOR STOP AT PUBLIC HALL, 1st STORY, SECTION ''west''

HPD Violation · Class AVIOLATION DISMISSED · issued Mar 9, 2022

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.

Condo documents are recorded at unit level. Search a unit to see them.

HPD maintenance complaints

HPD · NYC Open Data

HEAT/HOT WATER — ENTIRE BUILDINGCLOSE · Dec 22, 2025

The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been closed. If the condition still exists, please file a new complaint.

FLOORING/STAIRS — FLOORCLOSE · Nov 6, 2025

HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more information on the reason why HPD was unable to inspect, contact HPD at the Tenant Information Messaging Service at 212-863-4951.

PLUMBING — BASIN/SINKCLOSE · Oct 29, 2025

HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more information on the reason why HPD was unable to inspect, contact HPD at the Tenant Information Messaging Service at 212-863-4951.

APPLIANCE — ELECTRIC/GAS RANGECLOSE · Oct 29, 2025

HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more information on the reason why HPD was unable to inspect, contact HPD at the Tenant Information Messaging Service at 212-863-4951.

PLUMBING — BASIN/SINKCLOSE · Oct 29, 2025

HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more information on the reason why HPD was unable to inspect, contact HPD at the Tenant Information Messaging Service at 212-863-4951.

19 complaints total.

HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.

Pre-2016 DOB filings

DOB legacy · NYC Open Data

24 A2 filings1996–2021
12 A3 filings2003–2020
4 DM filings2000–2016
5 NB filings2016
4 A1 filings1996–2010
1 SC filing2021

DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.

DOB legacy violations

DOB BIS · NYC Open Data

EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE — V-DOB VIOLATION - ACTIVENov 30, 2024

FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

E-ELEVATOR ELEVATORREQUIRED — V-DOB VIOLATION - ACTIVENov 13, 2008

DELETED BY LCA ON 12/09/2008 BECAUSE WRONG DEVICE NUMBER ENTERED

32 resolved, most recent Sep 25, 2023
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE — V*-DOB VIOLATION - DISMISSEDNov 30, 2022

FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

CIANOW CRM Violation Dismissed · disposed Sep 25, 2023

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDAug 1, 2022

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

000810 PAID INVOICE 90786759 · disposed Sep 25, 2023

BENCH-FAILURE TO BENCHMARK NONE — V*-DOB VIOLATION - DISMISSEDMay 31, 2022

FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

000810 PAID INVOICE 90685843 · disposed Aug 4, 2022

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDAug 7, 2018

VIOLATION COMPLIED. · disposed Aug 13, 2018

EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDSep 30, 2012

VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDDec 12, 2011

VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDOct 7, 2010

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL — V*-DOB VIOLATION - DISMISSEDFeb 26, 2009

LL1081 NEW OWNERS CITY PURCHASED BUILDING IN OCTOBER 2007 · disposed Jul 12, 2009

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 13, 2008

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 13, 2008

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMay 6, 2008

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 25, 2007

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 25, 2007

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 25, 2007

CIALCA BUILDING DEMOLISHED DEMO#120703541 S/OFF10/11/2012 · disposed Aug 25, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 13, 2007

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedSep 12, 2006

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMay 29, 2006

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedDec 1, 2004

PPN203 5YR TEST PERFORMED ON 06/26/2006 BY MCGLYNN,HAYS #052-001 · disposed Dec 25, 2006

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedDec 1, 2004

PPN203 5YR TEST PERFORMED ON 06/27/2006 BY MCGLYNN,HAYS #052-001 · disposed Dec 10, 2006

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 15, 2001

1P169

AS PER INSPECTOR ROUTE SHEET · disposed Mar 13, 2002

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 15, 2001

1P563

AS PER INSPECTOR ROUTE SHEET · disposed Mar 13, 2002

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedOct 15, 2001

1F2694

AS PER INSPECTORS ROUTE SHEET · disposed Feb 7, 2002

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 21, 1999

1P563

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 21, 1999

1P169

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedNov 21, 1999

1F2694

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedDec 6, 1998

1P169

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedDec 6, 1998

1P563

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedDec 6, 1998

1F2694

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedDec 6, 1998

1P22900

PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013

LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL — V*-DOB VIOLATION - DISMISSEDMar 7, 1996

LL1081 FILED ON TIME · disposed May 14, 1997

LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL — V*-DOB VIOLATION - DISMISSEDJun 27, 1993

2

LL1081 NEW OWNERSHIP BY HPD ON 10/31/2007 · disposed Apr 23, 2009

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedSep 26, 1988

(51)FILE FOR NEW CONTROLLER.(52)REPAIR MOTOR ROOM DOOR.(53)PROV SHAFTWAY SIGNS & SAFETY COVERING FOR SHAFTWAY WINDOWS.(54)REPAIR ANNUNCIATOR

DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.

ECB violations

Environmental Control Board · NYC Open Data

16 resolved, most recent Mar 19, 2025
Construction — CLASS - 2RESOLVE · Mar 19, 2025

WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, NOTED RESTAURANT, ALBA, WITH 2 FABRIC EXTERIOR STRUCTURES APPROXIMATELY 4'D X 12' L AND 10'D X 50'L ATTACHED TO THE BUILDING AT EXPOSURE 1 FOR VESTIBULE & EXP. 4 FO

Unknown — CLASS - 3RESOLVE · Mar 19, 2025

ELECTRICAL WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, NOTED ELECTRICAL HEATERS INSTALLED AT INTERIOR OF FABRIC DINING STRUCTURE OF RESTAURANT, ALBA. NO PERMITS ISSUED OR FILED WITH DOB FOR ELECTRICAL WORK.,

Penalty: $200 · paid: $200

Construction — CLASS - 2RESOLVE · Feb 24, 2025

WORK WITHOUT PERMIT NOTED: AT TIME OF INSPECTION OBSERVED METAL AND PLASTIC STRUCTURE ATTACHED TO BUILDING FACADE (OUTDOOR DINING) WITH HEATING SYSTEM INSTALLED NO PERMITS ON FILE., OBTAIN ALL PERMITS

Penalty: $1,250 · paid: $1,250

Unknown — CLASS - 2RESOLVE · Jun 2, 2022

FAILURE TO POST NOTICE OF TENANT PROTECTION PLAN:ATOI OBSERVED NO NOTICE OF TENANT PROTECTION PLAN W/M00635580 PERMIT FOR APT1001 POSTED IN CONSPICUOUS LOCATION IN LOBBY,NOR DID I OBSERVED POSTING ON EVERY FL W

Penalty: $1,250 · paid: $1,250

Construction — CLASS - 2RESOLVE · Oct 27, 2020

3307.6.5.8 PERIODIC INSPECTION OF SIDEWALK SHED(6 MONTHS)/DAILY LOGS.AT THE TIME OF AN INSPECTION OF AN ACTIVE JOBSITE OBSERVED SIDEWALK SHED AT EXPOSURE#1,2,AND 4.UPON REQUEST TO SEE SIDEWALK SHED DAILY LOGS A

Construction — CLASS - 2RESOLVE · Oct 27, 2020

BC3310.5.3 FAILURE TO MENTION ACTING SITE SAFETY ON LOG.AT THE TIME OFAN INSPECTION OF AN ACTIVE JOBSITE MET WITH ACTING SITE SAFETY MANAGERMR.WINSTON E BROONE#1273,UPON REQUEST TO SEE SITE SAFETY LOG FOR THE M

Construction — CLASS - 2RESOLVE · Jan 16, 2019

SEC.3 3319-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGN OFF IN A TIMELY MANNER ALLOWING CRANE TO OPERATE W/O A CERTIFICATE OF ONSITE INSPECTION. ABOVE CD8 CN#826-18 CD#3658 WAS SIGN

Construction — CLASS - 2RESOLVE · Jan 16, 2019

SEC. 3319-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGN OFF IN A TIMELY MANNER ALLOWING CRANE TO BE OPERATED W/OA CERTIFICATE OF ONSITE INSPECTION. ABOVE CD8 CN#826-18 CD#3527 WAS

Unknown — CLASS - 2RESOLVE · Jan 7, 2019

RESPONDENT FAILED TO MAKE THE PROPER NOTIFICATION FOR MOBILE CRANE AFTER MAY 1, 2018 TO THE DEPARTMENT. AT TIME OF INSPECTION IT WAS DISCOVERED THAT NO MOBILE CRANE (CN 60618) WAS ON SITE.NOTIFICATION WAS MADE

Penalty: $5,030 · paid: $5,030

Construction — CLASS - 2RESOLVE · Jan 1, 2019

SEC.3 3319-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGNOFF IN A TIMELY MANNER ALLOWING CRANE TO OPERATE W/O A CERTIFICATE OF ONSITE INSPECTION. ABOVE CD8 CN#864-18 WAS SIGNED OFF ON

Penalty: $625 · paid: $625

Construction — CLASS - 2RESOLVE · Nov 11, 2018

SEC. 3319-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGNOFF IN A TIMELY MANNER ALLOWING CRANE TO OPERATE W/O A CERTIFICATE OF ONSITE INS¢ECTION. ABOVE CD8 CN#826-18 CD#3866 WAS SIGNED

Construction — CLASS - 2RESOLVE · Oct 14, 2018

SEC. 3319-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGN OFF IN A CERTIFICATE OF ONSITE INSPECTION. ABOVE CD8 CN#826-18 CD#4701 WAS SIGNED OFF ON 10-15-18 & WAS NOT SUBMITTED TO CRANE

Construction — CLASS - 2RESOLVE · Oct 11, 2018

SEC. 3317-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGNOFF IN A TIMELY MANNER ALLOWING CRANE TO OPERATE W/O A CERTIFICATE OF ONSITE INSPECTION. ABOVE CD8 CN#826-18,CD#4871 WAS SIGNED

Construction — CLASS - 1RESOLVE · Aug 7, 2018

BC3307.7.2 GATES. NOTE: AT THE TIME OF MY INSPECTION OF A 21 STORY BUILDING AT PARTIAL EXCAVATION AND FOUNDATION PHASE, CONSTRUCTION WORK IN PROGRESS. I OBSERVED THAT MAN GATE AT EXP #1, & #3 WAS SWINGING INTO

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 2RESOLVE · Mar 15, 2018

FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT A WORKER WAS INJURED WHILE PREPARING A STEEL "H" PILE FOR INSTALLATION. THE WORKER

Penalty: $5,000 · paid: $5,000

Construction — CLASS - 1RESOLVE · Nov 26, 2017

SEC. 3303.2.1 FAILURE TO ADEQUATELY PROTECT UTILITIES DURING CONSTRUCTION/EXCAVATION. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR DAMAGED A 4 INCH HIGH PRESSURE GAS MAIN WHILE EXCAVATING. GAS

Penalty: $8,000 · paid: $8,000

ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.

Certificates of occupancy

DOB · NYC Open Data

Renewal Without Change180 dwelling unitsCO Issued · Dec 27, 2021 · DOB NOW
19 earlier certificates
Renewal Without Change180 dwelling unitsCO Issued · Nov 29, 2022 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · Nov 21, 2023 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Oct 31, 2025 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Oct 18, 2024 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · Sep 15, 2023 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Aug 27, 2026 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · Aug 15, 2022 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · Jul 22, 2024 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · Jul 13, 2023 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · Jun 21, 2024 · DOB NOW
Renewal With Change180 dwelling unitsCO Issued · May 31, 2023 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · May 27, 2026 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · May 10, 2022 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Apr 20, 2023 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Apr 17, 2024 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Mar 28, 2022 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Feb 20, 2026 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Feb 10, 2023 · DOB NOW
Renewal Without Change180 dwelling unitsCO Issued · Jan 14, 2025 · DOB NOW

DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.

What are you trying to do here?

Public records for 515 WEST 18TH STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.