Built in 2014, 83 residences across 65 floors.
45 East 22nd Street, 10010
Madison Square Park Tower at 45 East 22nd Street was designed by Kohn Pedersen Fox. It is an eight sided glass tower on a rusticated granite base, sixty five levels, holding 83 residences.
The tower does two things that govern its interiors. It cantilevers about seventeen feet over the neighbouring building, and its floor plate widens progressively as it rises, reaching around a hundred and twenty five feet across at the top.
A plate that grows with height means plans do not repeat. An apartment high in the building is substantially wider than one low down, so a layout drawn for one level is not transferable, and the relationship between the core and the outside wall changes as you go up. The eight sided geometry compounds it, since rooms meet the perimeter at angles rather than at right angles and corners are obtuse rather than square.
Ceilings run over ten feet with glazing to the floor, which means the perimeter is glass on every side and carries nothing.
Within walking distance
Building facts
Built
2014
Floors
65
Residences
83
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1008517506.
Public records show 45 EAST 22 STREET was built in 2014 and rises 65 floors with 82 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 46 job filings on record for this lot (NYC Open Data).
Public record
Total units
82
Total permits
46
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1008517506. Violations and permits as of October 23, 2026.
19 filings in the last 24 months, last filing Jan 2025
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
INTERIOR RENOVATION OF FULL FLOOR APARTMENT 59 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $274,976 (as filed, not verified)
MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $35,000 (as filed, not verified)
MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $35,000 (as filed, not verified)
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION OF EXISTING SPRINKLER SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $141,000 (as filed, not verified)
MODIFICATION OF EXISTING SPRINKLER SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $141,000 (as filed, not verified)
WORK ON PHA 58TH FLOOR (64TH FL MARKETING) & 59TH FLOOR (65TH FLOORMARKETING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES,CONVENIENCE STAIR & CEILINGS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $1,059,600 (as filed, not verified)
WORK ON PHA 58TH FLOOR (64TH FL MARKETING) & 59TH FLOOR (65TH FLOORMARKETING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES,CONVENIENCE STAIR & CEILINGS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $1,059,600 (as filed, not verified)
WORK ON PHA 58TH FLOOR (64TH FL MARKETING) & 59TH FLOOR (65TH FLOORMARKETING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES,CONVENIENCE STAIR & CEILINGS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $1,059,600 (as filed, not verified)
INSTALLATION OF LOCAL FANCOIL UNITS, DUCT DISTRIBUTION AND CONNECTION TO EXISTING BASE BUILDING SYSTEM. NO NEW HEATING/COOLING EQUIPMENT INSTALLED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $41,254 (as filed, not verified)
INSTALLATION OF LOCAL FANCOIL UNITS, DUCT DISTRIBUTION AND CONNECTION TO EXISTING BASE BUILDING SYSTEM. NO NEW HEATING/COOLING EQUIPMENT INSTALLED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $41,254 (as filed, not verified)
INSTALLATION OF LOCAL FANCOIL UNITS, DUCT DISTRIBUTION AND CONNECTION TO EXISTING BASE BUILDING SYSTEM. NO NEW HEATING/COOLING EQUIPMENT INSTALLED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $41,254 (as filed, not verified)
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $155,408 (as filed, not verified)
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $155,408 (as filed, not verified)
REMOVE AND REPLACE WATER DAMAGED FLOORING, WALLS & CEILING GWB AT PUBLIC CORRIDORS AT 11-29TH FLOORS. RESTORE ALL FINISHES. ALL REMOVED OR DISTURBED FIRE RATING TO BE RESTORED BY END OF EACH DAY. NO CHANGE TO LAYOUTS, STRUCTURE, USE, EGRESS, OR OCCUPANCY
Filed estimated cost: $36,000 (as filed, not verified)
MODIFICATION OF EXISTING SPRINKLER SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $141,000 (as filed, not verified)
MODIFICATION OF EXISTING SPRINKLER SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $141,000 (as filed, not verified)
WORK ON PHA 58TH FLOOR (64TH FL MARKETING) & 59TH FLOOR (65TH FLOORMARKETING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES,CONVENIENCE STAIR & CEILINGS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $1,059,600 (as filed, not verified)
INSTALLATION OF LOCAL FANCOIL UNITS, DUCT DISTRIBUTION AND CONNECTION TO EXISTING BASE BUILDING SYSTEM. NO NEW HEATING/COOLING EQUIPMENT INSTALLED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $41,254 (as filed, not verified)
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $155,408 (as filed, not verified)
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $155,408 (as filed, not verified)
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $155,408 (as filed, not verified)
Full Renovation, Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $268,000 (as filed, not verified)
Full Renovation, Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $268,000 (as filed, not verified)
Full Renovation, Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $268,000 (as filed, not verified)
Full Renovation, Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $268,000 (as filed, not verified)
Full Renovation, Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $268,000 (as filed, not verified)
Full Renovation, Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $268,000 (as filed, not verified)
Interior renovation of a full floor apartment as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $1,000,000 (as filed, not verified)
Interior renovation of a full floor apartment as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $1,000,000 (as filed, not verified)
Interior renovation of a full floor apartment as per plans filed herewith. No change to use, egress or occupancy.
Filed estimated cost: $1,000,000 (as filed, not verified)
Modifications to the sprinkler heads and related piping
Filed estimated cost: $5,002 (as filed, not verified)
Modifications to the sprinkler heads and related piping
Filed estimated cost: $5,002 (as filed, not verified)
Install structural work between floors as shown on drawings filed herewith.
Filed estimated cost: $20,002 (as filed, not verified)
Modify mechanical ductwork and exhaust fans as shown on drawings filed herewith.
Filed estimated cost: $25,002 (as filed, not verified)
Install plumbing fixtures and related piping as shown on drawings.
Filed estimated cost: $10,002 (as filed, not verified)
Install plumbing fixtures and related piping as shown on drawings.
Filed estimated cost: $10,002 (as filed, not verified)
Installation of partition, ceilings doors, flooring cabinets, and convenience stair on 46th and 47th floors construction / 52nd & 53rd-floor marketing.Infill double-height space. plumbing mechanical and structural filed under separate dob now filings
Filed estimated cost: $250,023 (as filed, not verified)
Installation of partition, ceilings doors, flooring cabinets, and convenience stair on 46th and 47th floors construction / 52nd & 53rd-floor marketing.Infill double-height space. plumbing mechanical and structural filed under separate dob now filings
Filed estimated cost: $250,023 (as filed, not verified)
Installation of partition, ceilings doors, flooring cabinets, and convenience stair on 46th and 47th floors construction / 52nd & 53rd-floor marketing.Infill double-height space. plumbing mechanical and structural filed under separate dob now filings
Filed estimated cost: $250,023 (as filed, not verified)
removal of plumbing fixtures along with related piping.
Filed estimated cost: $3,000 (as filed, not verified)
SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING 5 STY NORTH APT 5B. , SECTION '' ''
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development contacted a tenant in the building and verified that the following conditions were corrected. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development was not able to gain access to your apartment or others in the building to inspect for a lack of heat or hot water. The complaint has been closed. If the condition still exists, please file a new complaint.
11 complaints total.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 23, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 23, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90881774 · disposed Sep 24, 2025
EMERGENCY WORK ORDER.NOTE OBSERVED ON AN OCCUPIED PARKING STRUCTURE OF 3 LEVELS,CRACKING CONCRETE SLAB AREA AT LEVELS 2,3,BASEMENT AND SUB-BA SEMENT OF VARIOUS LOCATIONS CAUSING IMMEDIATE HAZARD TO PUBLIC AND TRA FFIC PASS THROUGH.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES AND OWNER TO RETAIN A NYS REG PROFESSIONAL TO SUPERVISE ALL WORK AND REPORT
DEFECTIVE AREA REPAIRED, AND NO VIOLATION · disposed May 18, 2026
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90887272 · disposed Nov 23, 2025
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
CIANOW CRM Violation Dismissed · disposed Jun 18, 2026
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
NB W/ 1ST TCO LESS THAN 10 YRS OLD AT TIME DUE TO COMPLY · disposed Sep 25, 2022
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPM PAID INV#62063643 · disposed Mar 4, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
SKK INVOICE # 62063641 · disposed Mar 4, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPM PAID INV#62063645 · disposed Mar 4, 2019
PPN203 AOC SUB ON 8/30/18 BY:FUJITEC AMERICA DAVID MANN, CERT#466021 · disposed Sep 19, 2018
PPN203 AOC SUB ON 8/30/18 BY:FUJITEC AMERICA DAVID MANN, CERT#466021 · disposed Sep 19, 2018
PPN203 AOC SUB ON 8/30/18 BY:FUJITEC AMERICA DAVID MANN, CERT#466021 · disposed Sep 19, 2018
ADMIN LIFT OBTAINED PERMIT AND PAID C/P · disposed Mar 29, 2017
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
INVOICE 12977652 · disposed Jan 25, 2016
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 23, 2026.
ECB violations
Environmental Control Board · NYC Open Data
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #917361. REMEDY: SUBMIT ACCEPTABLE REQU
28-323.8 AND RCNY 103-13(5). FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE BUILDING'S STRUCTURE AND APPURTENANCES CONFORM TO THE PREVIOUS OF THE ADMIN CODE AFTER UNSAFE NOTIFICATION FILED. AT TIME OF INSPECTION,
Penalty: $2,500 · paid: $2,670
UNLAWFUL ACTS.FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.NOTE:AT THE TIME OF INSPECTION OBSERVED RESPONDENT FAILURE TO COMPLY WITH PREVIOUSVIOLATION#35679761X DATED 01/02/2024,WHICH REQUIRES REPAIR DEFECTIVE A
Penalty: $2,500 · paid: $2,631
28-323.1 FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION.NOTE:OBSERVED ON AN ACTIVE PARKING STRUCTURE CONSISTING OF AT LEVEL 2 BELOWAT CELLAR LEVEL,CRACK/SPALLING CONCRETE FROM CEILING AT SEVERAL LOCATI
Penalty: $2,500 · paid: $2,575
DOOR ZONE RESTRICTOR NOT WORKING TAMPERED WITH (CU). BRAKE TAG EXPIRED. NO DLM TAG ON THE CONTROLLER. MONTHLY MAINTENANCE NOT UP TO DATE NO ENTRY FOR 2020.
Penalty: $1,250 · paid: $1,250
DOOR ZONE RESTRICTOR NOT WORKING TAMPERED DISABLED (CU). BRAKE TAG EXPIRED. NO DLM TAG ON THE CONTROLLER. MONTHLY MAINTENANCE NOT UP TO DATE ON ENTRY FOR 2020.
Penalty: $1,250 · paid: $1,250
BRAKE TAG EXPIRED. NO DLM TAG ON THE CONTROLLER. DOOR ZONE RESTRICTOR FRONT DOOR NOT WORKING NEEDS TO BE ADJUSTED.
Penalty: $625 · paid: $625
FAILURE TO POST/DISTRIBUTE TPP @TIME OF INSPECTION,M OBSERVED WORK BEING PERFORMED UNDER AFORMENTIONED JOB NUMBER. BY CODE IS REQURED THAT THE TPP SHOULD BE POSTED AND/OR DISTRIBUTED. NO TOOPS WERE POSTED OR
Penalty: $1,250 · paid: $1,250
FAILURE TO POST/OR DISTRIBUTE SCAFFOLD @TIME OF INSPECTION, OBSERVED WORK BRING PERFROMED UNDER THE AFOREMENTIONED JOB NUMBER BY CODE IT IS REQUIRED THE SCBOFR SHOULD BE POSTED AND/OR DISTRIBUTED, NO SCBOFR
Penalty: $1,250 · paid: $1,250
FAILURE TO POST TENANT PROTECTION PLAN. AT TIME OF INSPECTION NO TENANT PROTECTION PLAN POSTED OR DISTRIBUTED. REMEDY: COMPLY WITH NOTICE OFVIOLATION
Penalty: $1,250 · paid: $1,250
FAILURE TO POST OR DISTRIBUTE SCBR. AT TIME OF INSPECTION NO SAFE CONSTRUCTION BILL OF RIGHTS POSTED OR DISTRIBUTED AT TIME OF INSPECTION. REMEDY: COMPLY WITH NOTICE OF VIOLATION
Penalty: $1,250 · paid: $1,250
CU54A10; 59BB5. 5A10-DOOR ZONE RESTRICTOR NOT WORKING DISABLE. THIS IS A SAFETY FEATURE TO ENSURE PASSENGER'S SAFETY; 59BB5-BRAKE MAINTEN ANCE TAGE EXPIRED.
Penalty: $1,250 · paid: $1,250
CU5A10,59BB5. 5A10-DOOR ZONE RESTRICTOR'S FRONT AND REAR DOOR NOT WORKING TAMPERED WITH DISABLE. THIS IS A SAFETY FEATURE TO ENSURE PASSEN GER'S SAFETY; 59BB5-BRAKE MAINTENANCE TAG EXPIRED.
Penalty: $1,250 · paid: $1,250
CU5A10; 59BB5. 5A10-DOOR ZONE RESTRICTOR NOT WORKING DISABLED. THIS ISA SAFETY FEATURE TO ENSURE PASSENGER'S SAFETY; 59BB5-BRAKE MAINTENANCETAG EXPIRED.
Penalty: $1,250 · paid: $1,250
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005962 HASBEEN INSPECTED,TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED,BY NOVEMBER,1,2016.REM:FILE ANNUAL CERT
FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33. DURING FALL ARREST.NOTED:58 STORY BUILDING ERECTED TO ROOF LEVEL.OBSERVED WORKERS UP ALONG ROOF APPROX. 20 FEET INSTALLING MODULAR SCAFFOLDI
Penalty: $1,000 · paid: $1,000
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY EFFECTED BY CONSTRUCTIONOPERATIONS.NOTED:58 STORY BUILDING ERECTED TO THE ROOF LEVEL.OBSERVED 2 WORKERS ON WATER TOWER APPROX 20 FT ABOVE THE ROOF.NEITHER WORKERS
Penalty: $10,000 · paid: $10,000
SEC: BC3314.4.3.3. INSTALLATION INSP FOR SUPPORTED SCAFFOLDS. NOTE: @ TIME OF INSP OF A 58 STORY BLDG @ ROOF LEVEL CONSTRUCTION WORK IN PROGRESS. OBSERVED A SUPPORTED PIPE SCAFFOLD (APPROX 63FT) ERECTED @ EXP#1
Penalty: $400 · paid: $400
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS. NOTE: @ TIME OF INSP OF A 58 STORY BLDG @ ROOF LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED SUPPORTED PIPE SCAFFOLD @ EXP#1 W
Penalty: $250 · paid: $250
WORK W/OUT A PERMIT. MODEL APT. NOTE: @ TIME OF INSP OF A 58 STORY BLDG @ BULKHEAD LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED THAT THERE WAS A MODEL APT IN PLACE ON THE 50 FLR. UPON REQUEST FOR PERMIT FOR M
Penalty: $1,600 · paid: $1,600
OPERATION OF CRANE W/O CERTIFICATE OF APPROVAL, CERTIFICATE OF OPERATION, EXPIRED CD. AT TIME OF INSPECTION UPON VIEWING PAPERWORK REQUIRED FOR OPERATION. THE CD2 HAD EXPIRED. USER WAS UNABLE TO PROVIDE A VALID
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.ARRON MALUEG WAS OPERATING CD #4658 CN #975/14 WHEN HE ACCIDENTALLY BOUGHT THE BLOCK AND HOOK UP INTO THE HEAD SHEAVE CAUSING THE
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.AT TIME OF INSPECTION OBSERVED, ACTIVE JOBSITE,BUILDING CURRENTLY 2 STORIES. CONCRETE OPERATIONS IN PROGRESS.CONCRETE FORMS FOR
Penalty: $2,400 · paid: $2,400
FAILURE TO MAINTAIN: HOUSEKEEPING AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. CONCRETE OPERATIONS IN PROGRESS OBSERVED VARIOUS AREA OF THE JOBSITE CONSTRUCTION DEBRIS,COMBUSTIBLE MATERIAL HAD ACCUMULATED
Penalty: $2,400 · paid: $2,400
WORK DOES NOT CONFORM TO APPROVED CONSTRUCITON DOCUMENTS &/OR APPROVEDAMENDMENTS. AT TIME OF INSPECITON OBSERVED ACTIVE JOBSITE. CRANE OPERATION ONGOING W/CONCRETE BUCKETS POURING PORTION OF FOUNDATION. AT EXP1
Penalty: $1,000 · paid: $1,000
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCITON OPERATIONS. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. OBSERVED SCAFFOLDING ERECTED AT EXP#2,3 & 4 PARTIAL. SCAFFOLDING HAS APPROX 6-8
Penalty: $2,400 · paid: $2,400
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT &/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. AT EXP#1 ALONG 22ND STREET CONCRETE OPERATIONS ON GOING. CONCRETE TRUCK WAS PARTI
Penalty: $1,000 · paid: $1,000
INADEQUATE AIR SUPPLY IN BOILER ROOM. BASED UPON SPOT CHECK/WALK THRU OF ABOVE PREMISES I OBSERVED NO AIR SUPPLY IN BOILER ROOM IN CELLAR. REMEDY: PROVIDE ADEQUATE AIR SUPPLY.
Penalty: $700 · paid: $700
ECB Violations (6bgk-3dad), NYC Open Data. As of October 23, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 23, 2026.
What are you trying to do here?
Public records for 45 EAST 22 STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 23, 2026.