One57 was designed by Christian de Portzamparc, with WSP Cantor Seinuk as structural engineer. It is 75 storeys, with 92 residences stacked above a hotel occupying the lower part of the building. Ceilings in the apartments reach eleven feet.
The facade is the design. Portzamparc drew the glass as a set of shallow vertical folds and colour bands running the height of the tower, so the wall is shallowly faceted across its whole height, and the light it throws shifts through the day rather than holding one flat reflection.
Indoors the faceting means the window wall is not consistently perpendicular to the rooms behind it. Where a fold falls inside an apartment the glass turns a few degrees, and a run of joinery or a seating plan set parallel to one part of the wall will sit at an angle to the next. Take the angle off the plan of that apartment rather than assuming a rectangular room.
The building divides at the hotel floors, so residential apartments sit well above the street and the lower levels answer to a different use entirely.
Within walking distance
Building facts
Built
2009
Floors
75
Residences
132
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1010107506.
Public records show 157 WEST 57 STREET was built in 2009 and rises 77 floors with 132 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
135
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1010107506. Violations and permits as of October 27, 2026.
27 filings in the last 24 months, last filing Oct 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
I am Subsequent Applic for Plumb & Sprink Work for Apt 65A (55th Fl actual). Plbg work to include Cap & Removal of WC, Lav, W/D, Sink, 2 Bathtubs, 2 Shower Dr, Fl Dr, Bidet & install new Shower, Water filters & W/D box, and new Sprinkler layout per plans.
Filed estimated cost: $314,912 (as filed, not verified)
I am Subsequent Applic for Plumb & Sprink Work for Apt 65A (55th Fl actual). Plbg work to include Cap & Removal of WC, Lav, W/D, Sink, 2 Bathtubs, 2 Shower Dr, Fl Dr, Bidet & install new Shower, Water filters & W/D box, and new Sprinkler layout per plans.
Filed estimated cost: $314,912 (as filed, not verified)
I am Subsequent Applic for Plumb & Sprink Work for Apt 65A (55th Fl actual). Plbg work to include Cap & Removal of WC, Lav, W/D, Sink, 2 Bathtubs, 2 Shower Dr, Fl Dr, Bidet & install new Shower, Water filters & W/D box, and new Sprinkler layout per plans.
Filed estimated cost: $314,912 (as filed, not verified)
I am Subsequent Applic for Plumb & Sprink Work for Apt 65A (55th Fl actual). Plbg work to include Cap & Removal of WC, Lav, W/D, Sink, 2 Bathtubs, 2 Shower Dr, Fl Dr, Bidet & install new Shower, Water filters & W/D box, and new Sprinkler layout per plans.
Filed estimated cost: $314,912 (as filed, not verified)
I am the Subsequent Applicant taking responsibility for Mechanical Work filed under this applic. Scope includes modification and installation of HVAC ductwork and related equip. as well as installation of 2 new Water Cooled AC Units in Apt 65A (55th Fl).
Filed estimated cost: $100,000 (as filed, not verified)
Interior Renovation of existing Apartment 65A (55th Floor) as per plans. Work to include interior demo, installation of new partition work & new flooring & ceilings thru-out, bathrm renov, No change to use, egress or occupancy under this applic.
Filed estimated cost: $4,834,980 (as filed, not verified)
Installation and relocation of Plumbing fixtures on the 21st Floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $12,500 (as filed, not verified)
HVAC work on the 31st Floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $54,000 (as filed, not verified)
Removal and installation of Sprinkler heads on the 21st floor as per plans filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $41,000 (as filed, not verified)
Application being filed to show 21st Floor residential amenity lounge seating replacement, minor electric and lighting scope with finish updates in designate area. No change in use, egress, or occupancy.
Filed estimated cost: $360,000 (as filed, not verified)
STRUCTURAL WORK AS PER PLANS. SUPPORT OF NEW CHANDELIER, WALL FEATURE AND LIGHTS FROM SLAB ABOVE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
STRUCTURAL WORK AS PER PLANS. SUPPORT OF NEW CHANDELIER, WALL FEATURE AND LIGHTS FROM SLAB ABOVE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
STRUCTURAL WORK AS PER PLANS. SUPPORT OF NEW CHANDELIER, WALL FEATURE AND LIGHTS FROM SLAB ABOVE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
Modify existing mechanical system as per plans filed. No change in use egress or occupancy.
Filed estimated cost: $48,760 (as filed, not verified)
Modify existing mechanical system as per plans filed. No change in use egress or occupancy.
Filed estimated cost: $48,760 (as filed, not verified)
Modify existing mechanical system as per plans filed. No change in use egress or occupancy.
Filed estimated cost: $48,760 (as filed, not verified)
Modify existing Sprinkler system. No Change in use, egress or occupancy.
Filed estimated cost: $20,000 (as filed, not verified)
replace, relocate and install new plumbing fixtures. no change in use, egress or occupancy.
Filed estimated cost: $36,000 (as filed, not verified)
Application being filed to show 21st Floor residential amenity lounge seating replacement, minor electric and lighting scope with finish updates in designate area. No change in use, egress, or occupancy.
Filed estimated cost: $50,000 (as filed, not verified)
removal of non-bearing part, add new non bearing partitions in the living rm, kit & master bedroom. also, mod. to ceiling, wall & flooring. minor duct work and to add humidifier. pl to be filed under separ. app. - apt. 88. no change in use, egress or occ.
Filed estimated cost: $463,220 (as filed, not verified)
removal of non-bearing part, add new non bearing partitions in the living rm, kit & master bedroom. also, mod. to ceiling, wall & flooring. minor duct work and to add humidifier. pl to be filed under separ. app. - apt. 88. no change in use, egress or occ.
Filed estimated cost: $463,220 (as filed, not verified)
removal of non-bearing part, add new non bearing partitions in the living rm, kit & master bedroom. also, mod. to ceiling, wall & flooring. minor duct work and to add humidifier. pl to be filed under separ. app. - apt. 88. no change in use, egress or occ.
Filed estimated cost: $463,220 (as filed, not verified)
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
DUCTWORK THROUGHOUT SPA AREA FILED IN CONJUNCTION WITH DOB NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $10,000 (as filed, not verified)
RENOVATION OF THE SPA ON THE 20TH FLOOR (25TH FLOOR MARKETING). NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $500,000 (as filed, not verified)
DEMO OF THE 20TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $40,000 (as filed, not verified)
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Filed estimated cost: $10,000 (as filed, not verified)
Use of suspended scaffold from building maintenance unit (BMU), as per plans filed herewith.
Filed estimated cost: $1,200 (as filed, not verified)
PL/SP WORK OF SPA AREA FILED IN CONJUNCTION WITH DOB NOW GC. AND MH NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $8,500 (as filed, not verified)
PL/SP WORK OF SPA AREA FILED IN CONJUNCTION WITH DOB NOW GC. AND MH NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $8,500 (as filed, not verified)
PL/SP WORK OF SPA AREA FILED IN CONJUNCTION WITH DOB NOW GC. AND MH NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $8,500 (as filed, not verified)
PL/SP WORK OF SPA AREA FILED IN CONJUNCTION WITH DOB NOW GC. AND MH NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $8,500 (as filed, not verified)
PLUMBING/SPRINKLER WORK ON THE 20TH FLOOR (25TH FLOOR MARKETING) FILED IN CONJUNCTION WITH DOB NOW GC WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $65,500 (as filed, not verified)
PLUMBING/SPRINKLER WORK ON THE 20TH FLOOR (25TH FLOOR MARKETING) FILED IN CONJUNCTION WITH DOB NOW GC WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $65,500 (as filed, not verified)
PLUMBING/SPRINKLER WORK ON THE 20TH FLOOR (25TH FLOOR MARKETING) FILED IN CONJUNCTION WITH DOB NOW GC WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $65,500 (as filed, not verified)
PLUMBING/SPRINKLER WORK ON THE 20TH FLOOR (25TH FLOOR MARKETING) FILED IN CONJUNCTION WITH DOB NOW GC WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $65,500 (as filed, not verified)
MH WORK FILED IN CONJUNCTION WITH DOB NOW GC, AND PL/SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $30,000 (as filed, not verified)
MH WORK ON THE 4TH FLOOR (8th floor marketing) FILED IN CONJUNCTION WITH DOB NOW GC AND PL/SP . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $30,000 (as filed, not verified)
FIT OUT- INTERIOR RENOVATION OF THE 20TH FLOOR FILED IN CONJUNCTION WITH DOB NOW PL SP AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $100,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK ON THE 4TH FLOOR (8TH FLOOR MARKETING) FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $26,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK ON THE 4TH FLOOR (8TH FLOOR MARKETING) FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $26,000 (as filed, not verified)
INTERIOR RENOVATION ON THE 4TH FLOOR (8TH FLOOR MARKETING) . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $50,000 (as filed, not verified)
WINDOW REPLACEMENT ON THE 20TH FL AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $120,000 (as filed, not verified)
DEMO WORK ON THE 20TH FLOOR INCLUDING TEMPORARY LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $54,300 (as filed, not verified)
INTERIOR RENOVATION ON THE 4TH FLOOR SUITE 4112.
Filed estimated cost: $20,000 (as filed, not verified)
convert existing closet to sauna. Install heater in new sauna No change to use, egress or occupancy under this application. Plumbing and sprinkler work done under 122127974.
Filed estimated cost: $115,000 (as filed, not verified)
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $1 (as filed, not verified)
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF THE BOILER ROOM
§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Recorded documents
ACRIS · NYC Department of Finance
Party 2: 157 WEST 57TH STREET CONDOMINIUM
Party 1: NYC DEPARTMENT OF TRANSPORTATION
Party 2: 157 WEST 57TH STREET CONDOMINIUM
1 individual party not shown
ACRIS document ID: 2014091201065001 · Search ACRIS
ACRIS real property records, NYC Department of Finance via NYC Open Data. As of October 27, 2026.
HPD maintenance complaints
HPD · NYC Open Data
HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more information on the reason why HPD was unable to inspect, contact HPD at the Tenant Information Messaging Service at 212-863-4951.
HPD attempted to conduct an inspection in response to this complaint, but was unable to complete the inspection. Please submit a new service request with 311 if the condition still exists. For more information on the reason why HPD was unable to inspect, contact HPD at the Tenant Information Messaging Service at 212-863-4951.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
50 complaints total.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB DISMISSED · disposed Aug 29, 2024
FAILURE TO MAINTAIN FACADE AND A APPURT.GLASS PANELS/CURTAIN WALL BROKEN@41 FL DAMAGE WINDOW GLASS @14FL@EXP#1(SO.ELEV.)57THST.REMEDY: RETAIN NYS REG.QEWI PROF INSPECT.& EVALUATE 100% OF GLASS CURTAIN WALL@ALL EXPO.DETERM.SAFETY&CAUSE OF FAILURE SAME DESIGN PROF.SHALL CREATE REPORT OF CAUSE OF FAILURE.INSTALL PUB.PROTECTION OF ENTIRE
COMPLIED WITH DOB REQUIREMENTS · disposed Sep 12, 2024
INSTALL APPROXIMATELEY 160 LINEAR FEET OF SIDEWALK SHED EXPOSURE # 1.WEST 57TH STREED SIDE TO SAFE GRAURD THE PUBLIC
IED #17851 IS CLOSED. WOR IS COMPLETED BY OWNER AND VERIFIED BY DOB. · disposed Sep 19, 2023
FAILURE TO MAINTAIN BUILDING: AT 41 ST FLOOR IN APT. 41D, INSULATED GLASS WINDOW SHATTERED WITH GLASS FALLING AND HITTING 11TH FLOOR SETBACK CURVED WINDOWS IN HOTEL ROOMS 1105 (1),1106(2), 1107(1) BREAKING OUTER PIECES OF GLASS. DEFECTS ARE ON W 57 ST FACADE.
UPDATED ENGINEERS REPORT ACCEPTED. · disposed Nov 15, 2023
FAILURE TO PERFORM CATEGORY 5 INSPECTION
CIANOW CRM Violation Dismissed · disposed Feb 22, 2022
FAILURE TO PERFORM CATEGORY 5 INSPECTION
CIANOW CRM Violation Dismissed · disposed Feb 22, 2022
PPN203 AOC SUBMITTED ON 091522 BY FUJITEC AMERICERT#610162 INSP PETER JODKO · disposed Sep 25, 2022
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
NB W/ 1ST TCO LESS THAN 10 YRS OLD AT TIME DUE TO COMPLY · disposed Jun 21, 2021
PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021
PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021
PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021
PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021
PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021
PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021
PPN203 AOC SUB ON 10/16/19 BY:FUJITEC DAVID MANN, CERT#466021 · disposed Oct 21, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Oct 20, 2019
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
ACJ1 PENALTY PAID · disposed Jan 16, 2020
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Sep 15, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
CAT 1 2017 AOC PAID PENALTY FAILURE TO FILE · disposed Sep 17, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Oct 20, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Sep 22, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Oct 20, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC WAS DONE ON TIME,01/24/17. · disposed Sep 22, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC WAS DONE ON TIME,01/24/17. · disposed Sep 22, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Oct 20, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC WAS DONE ON TIME,01/24/17. · disposed Sep 22, 2019
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
ACC1 2017 AOC PENALTY PAID. · disposed Oct 20, 2019
FAILURE TO PERFORM CATEGORY 5 INSPECTION
JVCAT5 EBN 2085/15SO/020117#2821 · disposed Jun 13, 2019
2017 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
CIAMDD EBN 2085/15SO/020117#2821 · disposed Jul 7, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
CAT 1 PAID PENALTY FAILURE TO FILE 2017 CAT 1 #1769518893 WAS FOR CAT 1 NOT AO · disposed Jul 8, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
CAT 1 PAID PENALTY FAILURE TO FILE 2017 CAT 1 #1769518893 WAS FOR CAT 1 NOT AO · disposed Jul 8, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
CAT 1 PAID PENALTY FAILURE TO FILE 2017 CAT 1 #1769518893 WAS FOR CAT 1 NOT AOC · disposed Jul 8, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
PPN203 AOC SUB ON 4/11/19 BY:FUJITEC AMEC. INC DAVID MANN, CERT#466021 · disposed Apr 28, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
PAID 13382167 · disposed May 9, 2018
THE BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK ORDER DUE TO APPLICANT WITHDRAWAL OF JOB #121227270 AS OF 01/11/18
OK TO DISMISS-SWO RESCINDED-NEW LMP ON RECORD AS PER 04/27/18. · disposed Dec 11, 2018
2016 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
JMA UNDER EA 236-14 S/O 2-1-17 · disposed Jan 9, 2018
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT 1 PAID FULL PENALTY FAILURE TO FILE · disposed Dec 4, 2018
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT 1 PAID FULL PENALTY FAILURE TO FILE · disposed Dec 4, 2018
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
PD INV#61899147 · disposed Oct 23, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
EVCAT1 PENALTY PAID · disposed Sep 18, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
EVCAT1 PENALTY PAID · disposed Sep 18, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jan 5, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jan 5, 2017
PPN203 AOC SUB ON 6/28/18 BY:FUJITEC AMERICA DAVID MANN, CERT#466021 · disposed Sep 6, 2018
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
FIREFIGHTER'S SERVICE PHASE 1 INOPERATIVE. REMEDY: PROVIDE TO REPAIR.
Penalty: $640 · paid: $640
FIREFIGHTER'S SERVICE PHASE 1 INOPERATIVE. REMEDY: PROVIDE TO REPAIR.
Penalty: $640 · paid: $640
FIREFIGHTER'S SERVICE PHASE 1 INOPERATIVE. REMEDY: PROVIDE TO REPAIR.
UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTES: DOB#O82923FA0501AB REQUIRED THE OWNER TO PROVIDE THE PE/RA REPORT TO THE FACADE UNIT DUE TO BROKEN GLASS DUELS AT SOUTH ELEVATION(EXPIRED BY 9/
AT 41 ST FLOOR IN APT. 41D, INSULATED GLASS WINDOW SHATTERED WITH GLASS FALLING AND HITTING 11TH FLOOR SETBACK CURVED WINDOWS IN HOTEL ROOMS 1105 (1),1106(2), 1107(1) BREAKING OUTER PIECES OF GLASS. DEFECTS ARE
28-201.1 INADEQUATE TENANT PROTECTION PLAN.NOTE:AT TIME OF INSPECTION OBSERVED WORK BEING PERFORMED UNDER AFOREMENTIONED JOB NUMBER SUBMITTED TPP LACKS SPECIFIC MEANS & METHODS IN ALL 9 SECTIONS OF TPP.IT IS BY
Penalty: $625 · paid: $625
59-BB-15,68-B-7,98-BB-5=DATE ON ANNUAL BRAKE MAINETANNCE TAG HAS EXPIRED NO ENTRY OF DATE OF ANNUAL BRAKE MAINTENNACE IN OOG CURRENT 5 YEAR TEST IS OVERDUE TAG HAS EXPISRED
Penalty: $310 · paid: $310
59-BB-15,68-B-7,98-BB-5,DATE ON ANNUAL BRAKE MAINTENANCE TAG HAS EXPISRE NO ENTRY OF DATE OF ANNUAL BRAK EMAINETANNCE IN LOG CURRENT 5 YEAR TEST IS OEVRDUE TAG HAS EXPIRED
Penalty: $310 · paid: $310
5A10/(5-A-10)DOOR RESTRICTOR HAS BEEN TAMPERED WITH DISABLED AND RENTERED INOPERATIVE.THIS IS AS SAFETY DEVICE TO ENSURE ELEVATOR PASSENGERSSAFETY.REPAIR RESTRICTOR.
Penalty: $1,000 · paid: $1,000
97## OPERATING DEVICE 1P46812 WITH AN EXPIRE CONSTRUCTION TEMP. LOST INSPECTION ISSUED ON 1-10-15. RMDY: MUST OBTAIN CONSTRUCTION CERTIFI CATE.
Penalty: $1,000 · paid: $1,000
BC 3301.2 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONST.NOTE:@THE TIME OF MY INSP CONST WORK IN PROGRESS OF A 73 STORY N.B MOSTLY ENCLOSED & UP TO BULK HEAD LEVEL I WAS RESPONDING TO INC
SEC. 3301.2 FAILURE TO MAINTAIN SAFETY MEASURES UPON INSPECTION AS NOTED: AT CONSTRUCITON SITE: S.S. MANAGER REPORTED A PIECE OF GLASS WAS RECOVERED FROM A TERRACE ON ADJOINING PROPERTY MATCHING COLOR & MATERIA
XAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTED:WORKER WHILE WORKING WITH BASEBOARD IN THE BATHROOM ON 67 FL (CONSTRUC) GOT ELECTROCUTED FROM ELEC WIRE (COMING OUT OF WAL
WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS &/OR APPROVED AMENDMENTS.NOTE:SIDEWALK SHED HAVE BEEN ERECTED @ EXP#1(W57 STREET)& EXP#3(W58 STREET)UNDER PERMIT #121409396-01-EQ-SH @ EXP#1 @ SECTION 16FT HIGH
Penalty: $500 · paid: $500
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPS.AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE,INCIDENT OCCURING WHILE WORKERS ON EXTERIOR RIGGS WERE MAKING THEIR WAY TO 52 FL OBSERVED
Penalty: $2,400 · paid: $2,400
97B07 - DOB ISSUED WEATHER ADVISORY 2/11/11 SITE SAFETY FAILED TO ADHERE TO WEATHER ADVISORY UNSAFE OR IMPROPER USE OF HOIST. SAFEGUARD PUB LIC AND PROPERTY.
UNAPPROVED UNSAFE UNSUITABLE ELECTRICAL EQUIPMENT APPARATUS MATERIALS DEVICES APPLIANCES OR WIRING IN USE.ON 2/7/14 I OBSERVED SERVICE SWITCH SWS4H-3M & SERVICE SWITCH SWBD 4-H-3M BURNT OUT DUE TO WATER LEAK IN
Penalty: $400 · paid: $803
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. NOTED: A-SOUTHWEST CORNER 22 FL A WINDOW WASTER MOTORIZED SCAFFOLD WAS LOOSE AND IMPROPERLY TETHERED TO THE BLDG @TIME OF INSPEC
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: 2 POINT SUSPENDED SCAFFOLD WAS LANDED AT SOUTHWEST CORNER AT FLOOR #22 ROOF SETBACK W/O SECURED SUSPENDED SCAFFOLD CABLES
Penalty: $2,400 · paid: $2,400
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: AT 73 STY/CONCRETE BLDG UNDER CONSTRUCTION HAS INSTALLED STEEL BEAMS AND REMOVED CONCRETE COLUMNS AT 73RD FLR FRAMING
SEC. BC 3301.1.2. FAILURE TO COMPLY W/NYC FIRE CODE. GENERAL. NO C/F FOR TORCH USE. NOTED: WORKER AT GROUND LEVEL, WORKING ON STEEL FRAME STAIRCASE, USING TORCH & FIRE CUTTING TUBE STEEL. WHEN QUESTIONED HAD
JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. NOTED: CONSTRUCTION DEMO/SITE FENCE ERECTED UNDER PERMIT #110463418-01-EQ-FN ISSUED ON 7/16/13 AND EXPIRES ON 78/1/2014 DOES NOT COMPLY WITH
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONALS PARTIAL STOP WORK ORDER ON ALL SINGLE MAN LIFTS OPERATED BY ELECTRICIANS ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES:WOR
BC3301.2. FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES ORTEMPORARY CONSTRUCTION HOLES IN FLOOR.UPON INSECTION AS NOTED ON ACTIVE CONSTRUCTION SITE UP TO ROOF 75TH THERE ARE HOMES AND PENETRATIONS O
Penalty: $1,600 · paid: $1,600
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION.THE GUARDRAIL SYSTEM ON TEH TOP FLOORS 68TH -74TH WAS NOT SECURED PROPERLY TO THE SLAB MISSING RAILS BROKEN HASPS ON TEMPORARY A
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERAIONSS. "PARTIAL SWO" ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES: STOP ALL CRANE OPERATIONS MAINTAIN SAFETY EXCLUSION ZONE
SEC. BC 3301.2. FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION HOLES IN FLR: UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTION SITE TOPPED OUT 75TH (ROOF) THERE ARE HOLES APPROX
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTION SITE UP TO 75TH FLR(ROOF) THE APPROVED SITE SAFETY PLAN SUBMITTED BY THE CONTR
SEC. 3320.2. OPERATION OF DEFECTIVE EQUIPMENT NOTED: TOWER CRANE CD #2830 LEAKING HYDRAULIC FLUID AT VARIOUS LOCATIONS AT MACHINE DECK. OBSERVED DRIPPING FLUID AT CONNECTORS W/PAIL CATCHEING FLUID. SATURATED
Penalty: $1,600 · paid: $1,600
SEC. BC 3301.5. INSPECTION OF EQUIPMENT - UNABLE TO PRODUCE INSPECTION/MAINTENANCE LOGS. NOTED: 1) AT TIME OF INSPECTION NO DAILY INSPECTIONRECORD FOR 8.29.12 AVAILABLE. 2) NO MONTHLY INSPECTION RECORDS ON SITE
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.(COMP#1325328).WHILE LOWERING LOAD FROM 58 FLR CONTRACTOR LOST CONTROL & BROKE WINDOW ON 10 FLR.
27-1009:INADEQUATE SAFETY MEASURE OPERATION OF CRANE/DERRICH/HOISTING EQUIPMENT IN AN UNSAFE MANNER. CRANE OPERATOR WAS LOWERING THE LOAD LINE THE SINGLEMAN SAW BALL SWAYING & KEPT THE OPERATIONS CONTINUING THE
Penalty: $4,800 · paid: $4,800
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS IN THAT BALL FROM CRANE STRUCK LOAD OF METAL RESHORES CAUSING SEVERAL RESHORES TO FALL FROM BUILDING. REM:STOP ALL WORK EXCEPT TO
SEC. 3308.3 FAILURE TO MAINTAIN VERTICAL NETTING. AT TIME OF INSPECTION,OBSERVED VERTICAL NETTING ON HOIST PLATFORMS DAMAGED & IN ADEQUATE. THIS WAS CONSTANT THROUGHOUT ON NORTH SIDE OF HOIST PLATFORMS.
Penalty: $1,600 · paid: $1,600
USE OF SUPPORTED SCAFFOLD W/O A SCAFFOLD USER ( ) AT TIME OF INSPECTION OBSERVED A SCAFFOLD ON 31ST FLOOR BY STAIRWAY WORK ON SCAFFOLD W/O USER CERTIFICATE. REMEDY: DISCONTINUE ACTIVE - OBTAIN A SUPPO
Penalty: $1,600 · paid: $1,600
OBSERVED RECENT SMOKING REFUSE WITHIN CONSTRUCTION SITE. AT TIME OF INSPECTION I DID OBSERVE @ 10TH FLR HOIST AREA CIGARETTE BUTTS. REM:COMPLY WITH CODE.
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. SITE SAFETY MANAGER REPORTED (1/2" NUT) FELL FROM THE 20THFLR SW ELEVATION WHERE INSTALLATION OF MONORAIL SYSTEM FOR CURTAIN
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS NOTED: AT CONCRETE BUILDING AT 11TH FL EXPOSURE 1,57TH STREET SIDE,WHILE CAULKING WINDOW TRACK & GULTER. CAULK TUBE FELL TO CLOSED
Penalty: $1,200 · paid: $1,200
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: A 3 INCH BY 5 INCH BY 1/4 INCH PLATE STEEL WASHER RECTANGULAR IN SHAPE DISPLACED & FELL FROM NEW BUILDING UNDER CONSTRUCTI
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. NOTED: AT 50TH & 51TH FLOORS (FRAMING & STRIPPING FLOORS) IMPROPER STORAGE OF TOOLS,MATERIALS,& DEBRIS AT SOUTH ELEVATION PERIMETER. REMEDY: STOP WORK @ THESE AREAS
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY. AFFECTED BY CONSTRUCTION OPERATION. AS PER CONVERSATION WITH SITE SAFETY MANAGER A 2'-0" LEVEL THAT WAS (TUCKED) ANY ON ( ) PANEL A 21ST FL SOUTH WEST ELEVATI
Penalty: $1,200 · paid: $1,200
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTE: BLOCK STOPS USED ON TIE BACK LINES ON 2 RIGGS ON THE 23RD FLR. NO APPROVED PLANS OR AMENDMENTS ON SITE AT TIME OF
Penalty: $500 · paid: $500
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTEDP: AORM TIE FEL FROM THE 35TH FLR & HIT A CAR ACROSS THE STREET, TIE IS APPROX.8"LONG(LOOKS LIKE A LONG NAIL)MADE OF METAL ST
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONSMNOTE AT HIGHEST ELEVATION OF BLDG UNDER CONST. A METAL SHIM APPROX. 1/4"X3"X4'FELL FROM UPPER FLRS ONTO ROOF SETBACK OF BLDG PROPE
FAILURE TO MAINTAIN ADEQUATE SAFETY MEASURES AN INCIDENT OCCURRED ON THE 29TH FLOOR EVOLVING A PIECE OF RIP LUMBER APPX 3X4X3 FALLING BTWN AN OPEN SECTION BTWN THE COCOON SYSTEM AND THE LANDING PLATFORM THE 3X4
Penalty: $1,600 · paid: $11,269
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS - NOTED: DURING (FORMING) OPERATIONS AT THE 25TH & 26TH FLRS A PC OF LUMBER APPROX 3'-4" HAS FALLEN TO THE 6TH FLR ADJACENT
Penalty: $2,400 · paid: $2,400
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONACTIVITY. AS REPORTED BY SITE SAFETY MANAGER, A WORKER INJURED BY FALLING EQUIPMENT WHILE ERECTING HOIST PLATFORM STRUCTURE. A WELL WHEEL
Penalty: $1,200 · paid: $1,200
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION.NOTED:RESPONDENT TO INCIDENT WHICH IS REPORTED BY SITE SAFETY MANAGER,@ TIME OF INSPEC OBSERVED SECTION OF GLASS PANEL FOR ADJACENT
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. NOTED: AT TIME OF INSPECTION, AS REPORTED BY SITE SAFETY MANAGER DURING FORM WORK OPERATION, SECTION OF FORM WHICH IS STEEL PLATE
SEC. 28-103.8. MATTERS NOT PROVIDED FOR FORM WORK DESIGN DRAWING. AS NOTED: I RESPONDED TO INCIDENT WHICH OCCURRED ON THIS SITE AND REPORTED BY SITE SAFETY MANAGER, DURINGG STRIPING OPERATION PC OF STEEL PLATE
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 157 WEST 57 STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.