The Cortland was designed by Robert A. M. Stern Architects with interiors by Olson Kundig. It is 26 storeys near the Hudson in West Chelsea, with 144 residences.
The exterior is brick, more than a million of them, handmade and laid by hand in a blend of five colours over a rusticated LaSalle limestone base, with moulded brickwork and metal rivet detailing drawn from the industrial buildings of the district. It is a masonry building in a neighbourhood that has lately been built in glass.
Masonry is why the windows sit where they do. Openings are punched into a load bearing scale of wall rather than hung in a curtain, so each has a real jamb and a real reveal, and the wall between openings is solid and continuous. That is the opposite condition to a glass perimeter: there is usable wall in every room, storage and millwork can sit against the outside wall, and the acoustic and thermal load does not fall entirely on soft materials. Corner apartments take light from two directions through separate openings rather than a continuous wrap of glass.
Within walking distance
Building facts
Built
2019
Floors
26
Residences
144
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1006947502.
Public records show 555 WEST 22ND STREET was built in 2019 and rises 26 floors with 141 residential units (NYC MapPLUTO, version 26v2). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
141
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1006947502. Violations and permits as of October 27, 2026.
20 filings in the last 24 months, 1 open violation, last filing Apr 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Interior renovation of the existing apt # 21A. No change of use, egress, or occupancy.
Filed estimated cost: $886,762 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY
Filed estimated cost: $111,500 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY
Filed estimated cost: $111,500 (as filed, not verified)
MECHANICAL WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY.
Filed estimated cost: $90,000 (as filed, not verified)
Minor interior renovations to existing Class A apartment 10HW on the 9th floor of an existing mixed-use building. Scope includes selective demolition of non-load-bearing walls, installation of non-load-bearing walls and miscellaneous finishes.
Filed estimated cost: $37,500 (as filed, not verified)
GENERAL CONSTRUCTION WORK FOR THE FIT OUT OF AN APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OROCCUPANCY.
Filed estimated cost: $516,375 (as filed, not verified)
Modification of PL fixtures and piping. No change in use, egress, and occupancy.
Filed estimated cost: $20,712 (as filed, not verified)
Modification of the existing sprinkler system in the apt. No change of use, egress, or occupancy.
Filed estimated cost: $21,250 (as filed, not verified)
Modification to the existing MS system, including the associated ductwork. No change of use, egress, or occupancy.
Filed estimated cost: $42,450 (as filed, not verified)
APARTMENT INTERIORS AESTHETIC RENOVATION: TO REVEIVE NEW PAINT, CLOSET SHELVING, NEW LIGHTING. NO STRUCTRUAL ALTERATTION ARE PROPOSED. NO PLUMBING ALTERATIONS ARE PROPOSED. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Filed estimated cost: $132,000 (as filed, not verified)
Job filed for the interior renovation of Apt# 10B West located on the 8th floor. No change in use, occupancy or egress.
Filed estimated cost: $70,000 (as filed, not verified)
FILING FOR INSTALLATION OF UNENCLOSED SUN CONTROL DEVICE ON TERRACE OF 10TH FLOOR SET BACK TERRACE/ROOF PURSUANT TO FLOOR DEFINITION IN NYC ZONING RESOLUTION 12-10 CONSTRUCTION LANGUAGE AND DEFINITIONS FLOOR AREA PARAGRAPH (l)
Filed estimated cost: $300,000 (as filed, not verified)
FILING FOR INSTALLATION OF UNENCLOSED SUN CONTROL DEVICE ON TERRACE OF 10TH FLOOR SET BACK TERRACE/ROOF PURSUANT TO FLOOR DEFINITION IN NYC ZONING RESOLUTION 12-10 CONSTRUCTION LANGUAGE AND DEFINITIONS FLOOR AREA PARAGRAPH (l)
Filed estimated cost: $300,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $272,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $272,000 (as filed, not verified)
GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,510,000 (as filed, not verified)
GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,510,000 (as filed, not verified)
GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,510,000 (as filed, not verified)
GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,510,000 (as filed, not verified)
MECHANICAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $450,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $272,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $272,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $272,000 (as filed, not verified)
PLUMBING AND SPRINKLER WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $272,000 (as filed, not verified)
GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,510,000 (as filed, not verified)
GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $1,510,000 (as filed, not verified)
MECHANICAL WORK FOR THE FIT OUT OF AN APARTMENT FILED IN CONJUNCTION WITH A NEW BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $450,000 (as filed, not verified)
WINDOW INSPECTION AT ALL ELEVATIONS VIA INDUSTRIAL ROPE ACCESS
Filed estimated cost: 0 (as filed, not verified)
Installation of new gypsum board dropped ceiling at living/dining room of existing Class A apartment #5H. Also install new storage room and remove interior partitions in areas shown in plans herewith filed. No change in use, egress or occupancy.
Filed estimated cost: $60,500 (as filed, not verified)
Installation of new gypsum board dropped ceiling at living/dining room of existing Class A apartment #5H. Also install new storage room and remove interior partitions in areas shown in plans herewith filed. No change in use, egress or occupancy.
Filed estimated cost: $60,500 (as filed, not verified)
RENOVATION OF EXISTING APARTMENTS 2D AND 2E TO COMBINE THEM TO BECOME 2DE AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $255,891 (as filed, not verified)
INTERIOR ALTERATIONS OF EXISTING RESIDENTIAL UNIT TO INCLUDE PARTIAL DEMO OF EXISTING NON-LOAD BEARING PARTITIONS, LIMITED MODIFICATIONS TO CEILING FINISH AND HEIGHT AND DOOR MODIFICATIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Filed estimated cost: $112,000 (as filed, not verified)
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT COURTYARD DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $20,000 (as filed, not verified)
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
Filed estimated cost: $1,000 (as filed, not verified)
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR TEMPORARY MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 AS PER THE PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB #121204366.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALL (15) NEW GAS FIRED FIREPLACES. ALL STRUCTURAL DETAILS, SUPPORT AND GAS LINES FILED IN CONJUNCTION WITH NB #121204366. NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
Filed estimated cost: $225,000 (as filed, not verified)
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NEW BLDG CONSTRUCTION, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,550 (as filed, not verified)
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NEW BLDG CONSTRUCTION, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $5,550 (as filed, not verified)
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD PER DRAWINGS. CD-5 NOT REQUIRED BECAUSE SUSPENDED SCAFFOLD WILL BE USED DURING NB CONST. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $31,850 (as filed, not verified)
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD PER DRAWINGS. CD-5 NOT REQUIRED BECAUSE SUSPENDED SCAFFOLD WILL BE USED DURING NB CONST. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $31,850 (as filed, not verified)
EMERGENCY GENERATOR FILED IN CONJUNCTION WITH NB #121204366 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED FUEL STORAGE FILED IN BIS UNDER JOB #140866294.
Filed estimated cost: $1,000 (as filed, not verified)
EMERGENCY GENERATOR FILED IN CONJUNCTION WITH NB #121204366 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED FUEL STORAGE FILED IN BIS UNDER JOB #140866294.
Filed estimated cost: $1,000 (as filed, not verified)
EMERGENCY GENERATOR FILED IN CONJUNCTION WITH NB #121204366 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED FUEL STORAGE FILED IN BIS UNDER JOB #140866294.
Filed estimated cost: $1,000 (as filed, not verified)
EMERGENCY GENERATOR FILED IN CONJUNCTION WITH NB #121204366 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED FUEL STORAGE FILED IN BIS UNDER JOB #140866294.
Filed estimated cost: $1,000 (as filed, not verified)
SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NB #121204366 AS PER THE PLANS FILED HEREWITH.
Filed estimated cost: $2,000 (as filed, not verified)
SPRINKLER AND STANDPIPE WORK FILED IN CONJUNCTION WITH NB #121204366 AS PER THE PLANS FILED HEREWITH.
Filed estimated cost: $2,000 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
DELETED BY AFA ON 06/25/2009 BECAUSE ENTERED IN ERROR
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90556598 · disposed Apr 27, 2022
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90556602 · disposed Apr 27, 2022
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90556600 · disposed Apr 27, 2022
OBSERVED NO SAFETY MEASURES IN PLACE, STOP ALL WORK ENTIRE SITE
ALL SAFETY MEASURES IN PLACE SWO RESCINDED · disposed Apr 28, 2021
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90414975 · disposed Apr 4, 2021
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
000810 PAID INVOICE 90414967 · disposed Apr 4, 2021
EMERGENCY WORK. CMU WALL PANEL APPROX 3'X5' ON 20TH FL AT EXP 3 TILTED OUTWARD AT 45" ANGLE IN DANGER OF FALLING AND CAUSING MAJOR HAZARD TO THE PUBLIC. REMEDY: IMMED RETAIN A NYS P.E. TO DESIGN AND SUPERVISE BRACING OF ALL FREE STANDING CMU WALL ON SITE CONTINUOUSLY. ENGINEER TO PROVIDE DAILY SIGNED/SEALED ENGINEER PROGRESS REPORT TO CEU
ALL FREE STANDING CMU WALLS IN PLACE WERE BRACED UNDER CONTINUOUS SUPERV · disposed Apr 4, 2021
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Oct 20, 2020
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Oct 20, 2020
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
CIANOW CRM Violation Dismissed · disposed Jan 28, 2021
FAILURE TO PERFORM CATEGORY 5 INSPECTION
CAT5 FAILED TO FILE 2016 INSP/RPT PAID PENALTY #62144117 · disposed Nov 26, 2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
CIANOW CRM Violation Dismissed · disposed Aug 11, 2022
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Aug 11, 2022
CIALCA DEVICE 1F5677 REMOVED DEMO#122927985 S/OFF 5/14/18 · disposed Aug 1, 2022
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Aug 11, 2022
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Aug 11, 2022
CIALCA DEVICE 1F5677 REMOVED DEMO#122927985 S/OFF 5/14/18 · disposed Aug 1, 2022
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
CIANOW CRM Violation Dismissed · disposed Aug 11, 2022
CIALCA DEVICE 1F5677 REMOVED DEMO#122927985 S/OFF 5/14/18 · disposed Aug 1, 2022
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIALCA DEVICE 1F5677 REMOVED DEMO#122927985 S/OFF 5/14/18 · disposed Aug 1, 2022
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIALCA DEVICE 1F5677 REMOVED DEMO#122927985 S/OFF 5/14/18 · disposed Aug 1, 2022
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIALCA DEVICE 1F5677 REMOVED DEMO#122927985 S/OFF 5/14/18 · disposed Aug 1, 2022
CIANOW CRM Violation Dismissed · disposed Aug 31, 2022
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
1F5677
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
1F5677
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
CIANOW CRM Violation Dismissed · disposed Aug 31, 2022
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
1F5677
PVT: RESOLVED BY SATISFACTORY CAT 1 INSPECTION · disposed Jul 30, 2013
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIANOW CRM Violation Dismissed · disposed Aug 31, 2022
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
CIANOW CRM Violation Dismissed · disposed Aug 31, 2022
CIANOW CRM Violation Dismissed · disposed Sep 10, 2020
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
IT WAS REPORTED THAT WORK WAS STANDING ON 3RD STEP OF PLATFORM LADDER CONTRARY TO MANUFACTURES SPECS NOT HAVING 3 POINT CONTACT WHEN HE LOST HIS BALANCE FALLING BACKWARDSSTOP ALL CABINET INSTALLATION . PROVIDE
Penalty: $2,500 · paid: $2,500
L1 FAILURE TO INSTITUTE ADEQUATE SAFETY MEASURES WORKER FELL APPROX SIX FEET FROM 12TH FLOOR WHERE STAIRWELL GUARD RAIL WAS MISSING ON TO 11TH FLOOR STAIRWELL; 3301.1.1, COMPLY WITH CODE
Penalty: $2,500 · paid: $2,500
WORK DOESNT CONFORM TO APPROVED CONST DOCS &OR APPROVED AMENDMENTS:NOTED:ATOI,UPON REVIEWING SUSPENDED SCF DRAWINGS,OBSERVED FOLLOWING OBJECTIONS:(1)FRAME SETUP DETAILS DONT CORRESPOND TO ACTUAL FIELD CONDITION
FAILED TO NOTIFY THE DEPT OF AN ACCIDENT/INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE:A WORKER GOT INJURED BY A GRINDER THAT KICKED BACK & CAUSED A LACERATION TO THE WORKER'S FACE.THE WORKER WAS TRAN
Penalty: $5,000 · paid: $5,000
FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES.NOTE AT THE TIME OF INSPECTION AT AN ACTIVE JOBSITE RESPONDING TO AN INCIDENT WHERE IT WASREPORTED THAT A WORKER SUSTAINED LACERATION IN HIS FACE WHILE USING AN
Penalty: $10,000 · paid: $10,000
AN UNLAWFUL ACT FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER FAILURE TO CORRECT AND CERTIFY SUMMONS #3554787() 35547878P AND 35547877N ISSUED ON 04-19-2021 FOR ELCTRICAL WORK WITHOUT A PEMRIT NEXT WAS W
Penalty: $2,500 · paid: $2,500
408-3H WARNING LABELS FOR PANELS 277-480VOLTS AMEND.NO DECALS PROVIDE IN MDP PANEL ON 26FL ELEVATORRM FOR 15KVA TRANSFORMER.COMPLY W/EC CODE.
Penalty: $400 · paid: $400
STORAGE OF MATERIALS AND EQUIPMENT DURING CONSTRUCTION OR DEMOLITION.AT TIME OF INSPECTION AT NEW 26 STORY NEW BUILDING TOPPED OFF,I OBSERVED LOOSE AND UNSECURED CONSTRUCTION MATERIALS AT LEADING EDGE/WINDOW OP
Penalty: $2,500 · paid: $2,500
FAIL TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES.IN RESPONSE TO INCIDENT WHERE SSM REPORTED THAT 2 WORKERS FOUND ELECTRICIAN ON FLOOR IN MECHANICAL ROOM ON 26 FLOOR.INSPECTION REVEALED ELECTRICIAN WAS P
3301.2 HOLES ON FLOOR,LARGER THAN 2 INCHES.AT TIME OF INSPECTION AT 26STORY NEW BUILDING TOPPED OFF,I OBSERVED NUMEROUS HOLES ON FLOORS LARGER THAN 2 INCHES ALLOWING CONSTRUCTION MATERIALS AND/OR DEBRIS TO FALL
Penalty: $2,500 · paid: $2,500
SITE SAFETY REFRESHER.AT TIME OF COMP INSPECTION WHERE SSM REPORTED THAT 2 WORKERS FOUND ELECTRICIAN ON FLOOR OF MECHANICAL ROOM.INSPECTION REVEALED THAT ELECTRICIAN WAS PERFORMING WORK ON A STEP UP TRANSFORMER
3308.5.3 CABLES.AT TIME OF INSPECTION AT NEW 26 STORY BUILDING TOPPED OFF,I OBSERVED ON NUMEROUS FLOORS ZERO CABLE INADEQUATELY MAINTAINED WITH LOOSE ZERO CABLE ALLOWING CONSTRUCTION MATERIAL AND/OR DEBRIS TO B
Penalty: $2,500 · paid: $2,500
HOUSEKEEPING.AT TIME OF INSPECTION AT NEW 26 STORY BUILDING TOPPED OFFI OBSERVED ON NUMEROUS FLOORS,HOUSEKEEPING INADEQUATELY MAINTAINED WITH CONSTRUCTION MATERIAL AND DEBRIS SCATTERED THROUGHOUT JOBSITE CREATI
Penalty: $2,500 · paid: $2,500
ELECTRICAL WORK W/O PERMIT.OBSERVED@1245PM BRANCH CIRCUIT WIRING INSTALLED ON 26FL FOROUTLETS,SWITCHES,FIXTURES.NO APP ON FILE FOR ELECTRICAL WORK.OBTAIN PERMIT.
Penalty: $800 · paid: $800
FAILURE TO PROVIDE EFFECTIVE ELECTRICAL CONTINUITY FOR METAL RACEWAY ENCLOSURES METAL CABLE ARMOR GROUNDING RACEWAYFOR 15KVA TRANSFORMER NOTCONTINUOUS.PROVIDE EFFECTIVE ELECTRICAL CONTINUITY.
Penalty: $600 · paid: $600
ELECTRICAL WORK W/O PERMIT OBSERVED@1245PM (1)15KVA TRANSFORMER INSTALLED IN 26FL IN ELVATORRM NO APP ON FILE FOR TRANSFORMER APPPS M00169924&M00378737 DONT COVER 26THFL TRANSFORMER.OBTAIN PERMIT.
Penalty: $800 · paid: $800
FAILURE TO GROUND ELECTRICAL SYSTEMS NO GROUND PROVIDED TO 15KVA TRANSFORMER IN ELEVATORRM ON 26FL.PROVIDE GROUNDING.
Penalty: $4,800 · paid: $4,800
PRE-SHIFT SAFETY MEETING CONTENT.AT TIME OF INSPECTION AT WHERE SSM REPORTED 2 WORKERS FOUND ELECTRICIAN ON FLOOR IN MECHANICAL ROOM.INSPECTION REVEALED THAT ELECTRICIAN WAS PERFOMRING WORK ON STEP UP TRANSFORM
3303.2.3 ELECTRICAL WORK.AT TIME OF INSPECTION AT NEW 26 STORY BUILDING TOPPED OFF,I OBSERVED CIRCUIT BREAKER PANEL BOXES MISSING COVER PANELS EXPOSING LIVE ELECTRICAL WIRE CREATING A HAZARDOUS CONDITION FOR WO
Penalty: $2,500 · paid: $2,500
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION ON DOCUMENTS AND OR APPROVED AMENDMENTS.NOTE:AT TIME OF MY INSPECTION ON A 26 STORY BLDG FACADE WORK IN PROGRESS BRICLAGING & COWLKING SUPPORTED SCAFFOLD IN USE WI
Penalty: $2,500 · paid: $2,500
DESIGN DRAWINGS FOR SUSPENDED SCAFFOLD DOCUMENT NEED TO BE KEPT ON SITE.NOTE:AT TIME OF INSPECTION OF A 26 NB I OBSERVED SUSPENDED SCAFFOLD IN USE UP ON REQUEST TO SSM & RIGGING FORMAN FOR DESIGN DRAWING NONE W
Penalty: $3,125 · paid: $3,125
FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS(ADJUSTABLE SUSPENDED SCAFFOLDS) CD-5. AT THE TIME OF AN INSPECTION ON AN ACTIVE JOBSITE OF A 26-STORY BUILDING,OBSERVED ADJUSTABLE SUSPENDED SCAFFOLDS BEING USED AT
Penalty: $1,250 · paid: $1,250
POSTING OF UNLAWFUL SIGNS INFORMATION PICTORIAL REPRESENTATION BUSINESS OR ADVERTISING MESSAGES AN PROTECTIVE STRUCTURES NOTED AT THE TIME OF MY INSPECTION ON A ACTIEV JOBSITE CURRENTLY AT ROOF LEVEL I OBSE
SIDE WALK SHED DOES NOT MEET COLOR SPECIFICATION.AT THE TIME OF INSPECTION ON A ACTIVE JOBSITE CURRENTLY AT ROOF LEVEL.I OBSERVED,SIDE WALK SHED AT EXPOSURES 1,2 AND 3.THE SIDE WALK SHED IS NOT PAINTED COLOR SP
BC 3301.7 FAILURE TO PROVIDE APPROVED P.E DRAWING AND METHOD OF REPAIR. AS NOTED:AT TIME OF INSPECTION FOR AN ACTIVE CONSTRUCTION SITE 26 STORIES BUILDING. OBSERVED CUTTING FOR OPENING APPROX 3.5'X7.5' IN SHEAR
Penalty: $2,500 · paid: $2,500
WORK DOES NOT CONFORMED TO CONSTRUCION DOC-SSP.NOTE:AT TIME OF MY INSPECTION OF A 26 STRY BLDG UNDER CONSTRUCTION,OBSERVED 2 TURNSTYLE INSTALLED ON EXPO#1 ON W 22 ST AND EXPO#4 AT W 23 ST FOR WORKERS OUT AND EN
Penalty: $2,500 · paid: $2,500
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS:AS NOTED,WHY RESPONDING TO A COMPLAINT BY THE SSM OF THESITE,IT WAS OBSERVED THAT A CMU WALL PANEL ON THE 20TH FL HAD TILTED O
Penalty: $2,500 · paid: $2,500
FAILURE TO MAINTAIN SAFETY MEASURES.NOTE:AT TIME OF MY INSPECTION OF A26 STRYS NEW BLDG UNDER BRICKS INSTALLATION AND CMU MANSONRY WORK,IN RESPONSE TO AN INCIDENT REPORTED WHERE WIND DUSTS CMU WALL (APPROX)45'
Penalty: $5,000 · paid: $5,000
PROVISION OF LAW:VERTICAL SAFETY MEETING.NOTE:AT TIME OF INSPECTION OFA 26 STRY NEW BLDG UNDER CONSTRUCTION.OBSERVED AT VARIOUS FL AND AT ALL EXPO OF THE BLDG.VERTICAL SAFETY NETTING HAD A LARGE OPENINGS MISSIN
Penalty: $2,500 · paid: $2,500
BC 2104.6 FAILURE TO PROVIDE MASONRY CMU BLOCK WALL CONSTRUCTION BRACING,ACCORDANCE W/ TMS 602/ACI 530.1/ASCE 6 SECTION 3.3E. AS NOTED:WHILERESPONDING TO A COMPLAINT BY THE SSM OF THE SITE,IT WAS OBSERVED THAT
Penalty: $2,500 · paid: $2,500
FAILURE TO NOTIFY DEPARTMENT 24HR PRIOR TO SUSPENDED SCAFFOLD INSTALLATION.NOTED:AT TIME OF INSPECITON EASY SCALE SUSPENDED SCAFFOLDS INSTALLED AROUND PERIMETE OF THE BUILDING AND BEING USED FOR FACADE ENCLOSUR
Penalty: $1,250 · paid: $1,250
UNQUALIFIED SUPERVISOR SUPERVISING USE OF SCAFFOLD.NOTED:AT TIME OF INSPECTION FOLLOWING WORKER LUIS RAMIREZ WHO SUPERVISING USE OF EASY SCALE MULTI-POINT SUSPENDED SCAFFOLDS PRODUCES FAKE 32-HR SUSPENDED SCAFF
Penalty: $5,000 · paid: $5,000
AT TIME OF INSPECTION, TOWER CRANE CD 4941 CN 10819 WAS ON SITE IN A WORKING CONFIGURATION(PHASE 3). THE CRANE'S CERTIFICATE OF OPERATION HAD EXPIRED ON 05/12/20. CRANE OWNER-TITAN CRANE & RIGGING LLC, COMPLY W
Penalty: $5,000 · paid: $5,000
AT TIME OF ENERGY CODE COMPLIANCE INSPECTION. I OBSERVED THAT THERE WERE NO COMPLETE SETS OF DOB APPROVED PLANS AT JOBSITE(MISSING ENERGY ANALYSIS PLANS)., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; PLE
Penalty: $625 · paid: $625
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.AT THE TIME OF MY INSPECTION OF PROPOSED 26STORY NEW BUILDING I OBSERVED WORK NOT CONFORMING TO APPROVED DOCUMENTS.AT THE CORN
Penalty: $620 · paid: $620
AT TIME OF INSPECTION I WAS REPORTING TO AN ACCIDENT. AUGER WHILE DRILLING ALONG 23RD STREET DURING SECANT WALL OPERATION HAD A HYDRAULIC LINE BURST ON TOP OF RIG. HYDRAULIC FUEL SPILLED ALONG SIDEWALK ONTO A P
Penalty: $25,000 · paid: $25,000
PROHIBITED OUTDOOR AD SIGN. NOTE: AT TIME OF INSPECTION I OBSERVE CONSTRUCTION FENCE IN PLACE W/ILLEGAL SIGNS. REMEDY: COMPLY W/CODE-REMOVE SIGNS.
Penalty: $5,000 · paid: $5,000
68B07,16T07,57M07,69B07,52L07,3M07. NO ENTRY OF DATE OF BRAKE MAINTENANCE IN LOG,HOISTWAY DOORS ARE NOT MARKED ON SHAFT SIDE, NO FIRE EXTINGUISHER IN MACHINE ROOM, THE CODE DATA PLATE IS BLAN,COUNTERWEIGHT HOI
Penalty: $250 · paid: $250
15M7.41M7.16M7.60M7.64M7.70O2.15M7 REPLACE MISSING CERT.FRAME 41M07 PROVIDE MISSING SIGN ON MACHINE RM SOOR 16M07PROVIDE MISSING LIGHT GUARD 1ST FL 60M07 PROVIDE LIGHTS GUARD IN M.R PROVIDE MISSING NYC DEVICE
Penalty: $1,250 · paid: $3,133
73X,6I,5I. RESTORE TO PROPER WORK ING ORDER CALL THIS DEPARTMENT FOR REINSPECTION 312-8738.
Penalty: $2,500 · paid: $4,208
FAILURE TO OBTAIN AN EQUIPMENT USE PERMIT NOTED:A/C UNIT ON ROOFTOP WEST SIDE. LOCATION:ROOF. REMEY: OBTAIN AN EQUIPTMENT USE PERMIT FROM DEPT OF BLDGS.
Penalty: $200 · paid: $200
14I11,73U16. 14-REPAIR CERTIFICATE FRAME. 73-TAG EQUIPMENT WITH CITY NUMBER.
Penalty: $1,000
50O,18M,35U,57O. 50 INSTALL ROPE GUARDS #18 REPLACE INTERLOCK COVER AND UNDER CAR BOX.#35 TAG EQUIPMENT. 57 CLEAN PIT.
Penalty: $1,000 · paid: $1,000
73X,75U,.
Penalty: $200 · paid: $200
05M,75U,52H,50Y,50O,31Q,73#,74T. CEASE USE UNTIL ITEMS 05M52H,73#ARE COMPLIED WITH CALL 1212 312 8740 FOR REINSPECTIN .PROVIDE CAR GATES 95M 73 NOT TO BEE USED AS A PASSANGER ELEVATOR FOUND BEING USED BY THE D
Penalty: $500 · paid: $500
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 555 WEST 22ND STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.