Built in 2023, 10 residences across 12 floors.
760 Madison Avenue, 10065
760 Madison Avenue, the Giorgio Armani Residences, was designed by COOKFOX, twelve storeys holding ten residences above a ground floor shop, completed recently as new construction rather than a conversion.
The facade is fluted Indiana limestone framing a grid of floor to ceiling windows. Fluting is the detail that reaches inside: the stone is cut in vertical channels, so the pier between two windows is modelled rather than flat, and the reveal at each opening has a profile rather than a square edge.
Ten residences in twelve storeys means close to one apartment a floor, so there is little or no party wall and each plan has exposure on more than one side.
The windows run floor to ceiling within a limestone frame, which is an unusual combination. The glazing is a curtain of glass and the stone between openings is structural and deep, so a room meets both conditions in the same wall. Which of the two a run of joinery lands against changes how it is fixed, and that is settled on site.
Within walking distance
Building facts
Built
2023
Floors
12
Residences
10
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1013807502.
Public records show 760 MADISON AVENUE was built in 2023 and rises 13 floors with 10 residential units (NYC MapPLUTO, version 26v2). This lot falls within the Upper East Side, designated May 18, 1981 by the Landmarks Preservation Commission (NYC Open Data). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
11
Historic district
Upper East Side
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1013807502. Violations and permits as of October 27, 2026.
18 filings in the last 24 months, last filing Sep 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Interior renovation of 8th floor apt with minor demolition of non-load bearing partitions. New finishes, non-load bearing partitions, and ceilings. No change in egress, occupancy or use involved.
Filed estimated cost: $340,000 (as filed, not verified)
Interior renovation of 8th floor apt with minor demolition of non-load bearing partitions. New finishes, non-load bearing partitions, and ceilings. No change in egress, occupancy or use involved.
Filed estimated cost: $340,000 (as filed, not verified)
Interior renovation of 8th floor apt with minor demolition of non-load bearing partitions. New finishes, non-load bearing partitions, and ceilings. No change in egress, occupancy or use involved.
Filed estimated cost: $340,000 (as filed, not verified)
Plumbing work as shown on the plans.
Filed estimated cost: $68,428 (as filed, not verified)
General construction as shown on the plans.
Filed estimated cost: $360,000 (as filed, not verified)
Mechanical work as shown in plans.
Filed estimated cost: $25,000 (as filed, not verified)
Plumbing work in conjunction with apartment renovation (Unit 7)
Filed estimated cost: $101,950 (as filed, not verified)
APPLICATION FILED FOR THE ALTERATION OF EXISTING APARTMENT. SCOPE CONSISTS OF MODIFICATION OF PARTITIONS, FINISHES & MECHANICAL DUCTWORK. ALL WORK IS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND/OR EGRESS.
Filed estimated cost: $225,000 (as filed, not verified)
APPLICATION FILED FOR THE ALTERATION OF EXISTING APARTMENT. SCOPE CONSISTS OF MODIFICATION OF PARTITIONS, FINISHES & MECHANICAL DUCTWORK. ALL WORK IS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND/OR EGRESS.
Filed estimated cost: $225,000 (as filed, not verified)
APPLICATION FILED FOR THE ALTERATION OF EXISTING APARTMENT. SCOPE CONSISTS OF MODIFICATION OF PARTITIONS, FINISHES & MECHANICAL DUCTWORK. ALL WORK IS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND/OR EGRESS.
Filed estimated cost: $225,000 (as filed, not verified)
Plumbing work in conjunction with apartment renovation (Unit 7)
Filed estimated cost: $101,950 (as filed, not verified)
APPLICATION FILED FOR THE ALTERATION OF EXISTING APARTMENT. SCOPE CONSISTS OF MODIFICATION OF PARTITIONS, FINISHES & MECHANICAL DUCTWORK. ALL WORK IS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND/OR EGRESS.
Filed estimated cost: $225,000 (as filed, not verified)
Interior renovation including new partitions in unit 5. No change to egress, use, or occupancy.
Filed estimated cost: $160,000 (as filed, not verified)
Interior renovation including new partitions in unit 5. No change to egress, use, or occupancy.
Filed estimated cost: $160,000 (as filed, not verified)
Plumbing work as shown in the attached plans.
Filed estimated cost: $25,000 (as filed, not verified)
Sprinkler work in conjunction with apartment renovation (Unit 7)
Filed estimated cost: $25,000 (as filed, not verified)
Erect non illuminated non advertising sign on existing metal scrim. No change of use, egress or occupancy
Filed estimated cost: $910 (as filed, not verified)
Tenant Protection Plan filed in conjunction with NB # 121204776.
Filed estimated cost: $1,000 (as filed, not verified)
FOUR NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNINGS - GIORGIO ARMANI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $3,700 (as filed, not verified)
FOUR NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNINGS - GIORGIO ARMANI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $4,000 (as filed, not verified)
FIVE NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNINGS - GIORGIO ARMANI. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $3,500 (as filed, not verified)
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $2,500 (as filed, not verified)
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
Installation and use of suspended scaffold and monorail system as per plans filed herein. No change in egress, use or occupancy.
Filed estimated cost: 0 (as filed, not verified)
SUSPENDED SCAFFOLD INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Filed estimated cost: 0 (as filed, not verified)
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $2,500 (as filed, not verified)
Facade restoration. Inspection. New Outriggers. Renew SR23-2350
Filed estimated cost: 0 (as filed, not verified)
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Filed estimated cost: $3,000 (as filed, not verified)
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $4,000 (as filed, not verified)
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $4,000 (as filed, not verified)
ARMANI RESTAURANT- MECHANICAL MODIFICATIONS ON CELLAR, 1ST, 2ND & 3RD FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $800,000 (as filed, not verified)
ARMANI STORE FIT OUT - MECHANICAL MODIFICATIONS ON CELLAR, 1ST, 2ND & 3RD FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $900,000 (as filed, not verified)
ARMANI RESTAURANT - PLUMBING MODIFICATIONS ON SUB CELLAR, CELLAR, 1ST FLOOR, 1ST FLOOR MEZZ AND 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $400,000 (as filed, not verified)
ARMANI RESTAURANT - PLUMBING MODIFICATIONS ON SUB CELLAR, CELLAR, 1ST FLOOR, 1ST FLOOR MEZZ AND 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $400,000 (as filed, not verified)
ARMANI STORE FIT OUT - SPRINKLER MODIFICATIONS ON CELLAR, 1ST, 1ST FL MEZ, 2ND & 3RD FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $90,000 (as filed, not verified)
ARMANI STORE FIT OUT - PLUMBING MODIFICATIONS ON SUB CEL, CELLAR, 1ST & 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $110,000 (as filed, not verified)
ARMANI STORE FIT OUT - PLUMBING MODIFICATIONS ON SUB CEL, CELLAR, 1ST & 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $110,000 (as filed, not verified)
ARMANI STORE FIT OUT- STRUCTURAL MODIFICATIONS ON 1ST, 2ND & 3RD FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $680,000 (as filed, not verified)
ARMANI STORE FIT OUT - DEMO AND INSTALLATION OF PARTITIONS, CEILING, DOOR MODIFICATIONS AND MILLWORK ON THE CEL, 1ST, 2ND & 3RD FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $2,200,000 (as filed, not verified)
ARMANI RESTAURANT - STRUCTURAL MODIFICATIONS (NEW RESTAURANT STAIR) FROM 1ST TO MEZZANINE FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $30,000 (as filed, not verified)
ARMANI RESTAURANT - SPRINKLER MODIFICATIONS ON CELLAR, 1ST AND 1ST FLOOR MEZ AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $60,000 (as filed, not verified)
ARMANI RESTAURANT - DEMO AND INSTALLATION OF PARTITIONS, CEILING, DOOR MODIFICATIONS AND MILLWORK ON THE CEL, 1ST, 1ST FLOOR MEZ, 2ND & 3RD FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1,800,000 (as filed, not verified)
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION AND USE OF TEMPORARY MINI CRANE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF SUPPORTED PIPE SCAFFOLDING IN ACCORDANCE WITH NYCC BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF EZ SCALE SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Filed estimated cost: $1,000 (as filed, not verified)
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
HPD called the telephone number on file for this complaint. Someone at that number indicated that the condition was corrected. The complaint has been closed. Please submit a new service request with 311 if the condition still exists.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
RESOLVED/DISMISSED · disposed Dec 1, 2022
PPN203 AOC SUB ON 2/28/2020 BY:TRANSEL DANNY KIRK, CERT#402010 · disposed Mar 17, 2020
FAILURE TO PERFORM CATEGORY 5 INSPECTION
JMA OIL HYDRAULIC - CAT 5 NOT REQUIRED · disposed Jun 15, 2016
PPN203 AOC SUB ON 8/30/11 BY START ELEV CERT#418001 INSP JOHN OSHEA · disposed Oct 2, 2011
PPN203 AOC SUB ON 042610 BY START ELEVATOR INSP. J OSHEA CERT#418001 · disposed May 31, 2010
PPN203 AOC SUB ON 051909 BY 1-10 INDUSTRY ASSOCIATES INSP B.GRIFFITH CERT#479001 · disposed Jun 3, 2009
CIALDE CANCEL-INDIVIDUAL HEATER UNITS INSIDE EACH APARTMENT-OP-49 · disposed Jun 25, 2007
CIALDE CANCEL-INDIVIDUAL HEATER UNITS INSIDE EACH APARTMENT-OP-49 · disposed Jun 25, 2007
CIALDE CANCEL-INDIVIDUAL HEATER UNITS INSIDE EACH APARTMENT-OP-49 · disposed Jun 25, 2007
1P36272
PPN203 AOC SUBMITTED ON 9/21/04 BY PREMIER ELEVCERT. #407-001 · disposed Sep 21, 2004
CIALDE DISMISSED-FULL PENALTY PAID $500.00 CK#732422045 INV#60622183 · disposed Jun 26, 2007
CIALDE DISMISSED-FULL PENALTY PAID $500.00 CK#732422045 INV#60622183 · disposed Jun 26, 2007
CIALDE DISMISSED-FULL PENALTY PAID $500.00 CK#732422045 INV#60622183 · disposed Jun 26, 2007
CIALDE DISMISSED-FULL PENALTY PAID $500.00 CK#732422045 INV#60622183 · disposed Jun 26, 2007
CIALDE DISMISSED-FULL PENALTY PAID $500.00 CK#732422045 INV#60622183 · disposed Jun 26, 2007
CIALDE DISMISSED-FULL PENALTY PAID $500.00 CK#732422045 INV#60622183 · disposed Jun 26, 2007
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
MISSING PROJECT INFORMATION PANEL ON SIDEWALK SHED PARAPET. NOTE: AT TIME OF INSPECTION OF A 5 STY BLDG,I OBSERVED SIDEWALK SHED IN PLACE ATEXP#1 OF THE BLDG W/O PROJECT INFORMATION PANEL ON THE PARAPET TO INDI
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT TIME OF INSPECTION OBSERVED A 5 STORY BLDG WITH INTERIOR WORK IN PROGRESS.DURING INSPECTION NOTED THAT THE SIDEWALK SHED IS MISSING THE UNDERSIDE LIGHT
Penalty: $625 · paid: $625
SIDEWALK SHED.NOT AS PER CODE AT TIME OF INSPECTION OBSERVED A 5 STORYBUILDING WITH INTERIOR WORK IN PROGRESS.DURING INSPECTION NOTED AFTER SEARCH ON BIS THAT THE SIDEWALK SHED MISSING THE 5 FEET EXTENSION AT E
Penalty: $625 · paid: $625
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 760 MADISON AVENUE, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.