The Kent was designed by Beyer Blinder Belle, thirty storeys holding 104 residences in Carnegie Hill, with interiors by Alexandra Champalimaud.
The elevation is brick, limestone and metal drawn to an Art Deco pattern. Horizontal stone lintels break down the scale of a six storey podium that holds the street wall, and a five storey south wing is built to match the height and material of the walk up next door.
Ceiling heights vary widely, from around ten feet to around fifteen. That range is unusually wide for one building, and it means the scale of a room changes substantially between apartments. Millwork and window treatments drawn for a ten foot room will read as undersized in a fifteen foot one, and the height has to be taken from the specific apartment rather than assumed from the building.
Being masonry with punched openings, the walls between windows are solid rather than glazed.
Within walking distance
Building facts
Built
2016
Last altered
2015
Floors
30
Residences
104
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1015407503.
Public records show 1681 3 AVENUE was built in 2016 and rises 30 floors with 105 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 24 job filings on record for this lot (NYC Open Data).
Public record
Last altered
2015
Total units
108
Total permits
24
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1015407503. Violations and permits as of October 27, 2026.
5 filings in the last 24 months, last filing Jul 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Installation of 112 LED downlights in existing suspended ceiling.
Filed estimated cost: $187,425 (as filed, not verified)
CONNECT TO EXT GAS FOR (5) REPLACEMENT GAS BOILERS AS PER PLANS; (3) BOILERS ON 4TH, (2) BOILERS ON 29TH. CAP AND REMOVE BOILERS MD204315-01 AND MD204320-06. CONJUNCTION WITH M01224929-I1-LA, EWN-M-01222719/M01224791. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Filed estimated cost: $10,000 (as filed, not verified)
CONNECT TO EXT GAS FOR (5) REPLACEMENT GAS BOILERS AS PER PLANS; (3) BOILERS ON 4TH, (2) BOILERS ON 29TH. CAP AND REMOVE BOILERS MD204315-01 AND MD204320-06. CONJUNCTION WITH M01224929-I1-LA, EWN-M-01222719/M01224791. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Filed estimated cost: $10,000 (as filed, not verified)
REPLACE (5) GAS BOILERS AS PER PLANS; (3) BOILERS ON THE 4TH FL AND (2) BOILERS ON THE 29TH FL. ABANDON IN PLACE TWO (2) GAS BOILERS IN 4TH FL BOILER ROOM. FILED IN CONJUNCTION WITH M01224929-I1-LA AND EWN-M-01222719/M01224791. NO CHANGE IN USE, EGRESS OC
Filed estimated cost: $140,000 (as filed, not verified)
HEREWITH FILING FOR MINOR GENERAL INTERIOR RENOVATION ON 3RD FLOOR APT # 3J. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $22,800 (as filed, not verified)
HEREWITH FILING FOR MINOR GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $10,000 (as filed, not verified)
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FIVE IRON GOLF)
Filed estimated cost: $1,500 (as filed, not verified)
STRUCTURAL WORK ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $50,000 (as filed, not verified)
MODIFICATION OF EXISTING HVAC SYSTEM, INCLUDING RANGEHOOD COOKING EXHAUST SYSTEM, ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $200,000 (as filed, not verified)
INTERIOR RENOVATION WORK ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $746,662 (as filed, not verified)
MODIFICATION OF SPRINKLERS ON THE FIRST FLOOR AND CELLAR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $65,500 (as filed, not verified)
INSTALLATION OF PLUMBING FIXTURES ON THE CELLAR AND FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $239,970 (as filed, not verified)
MECHANICAL WORK FOR ELEVATOR SHAFT AND CONVENIENCE STAIR BETWEEN CELLAR AND 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $28,637 (as filed, not verified)
STRUCTURAL FRAMING FOR ELEVATOR SHAFT AND CONVENIENCE STAIR BETWEEN CELLAR AND 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $24,677 (as filed, not verified)
APPLICATION FOR NEW HYDRAULIC ELEVATOR SHAFT AND CONVENIENCE STAIR BETWEEN CELLAR AND 1ST FLOOR RETAIL STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $102,543 (as filed, not verified)
NEW SPRINKLERS AT STAIR LANDING AT RETAIL SPACE AT CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $5,125 (as filed, not verified)
INSTALL NEW SUMP PUMP AT ELEVATOR PIT AT RETAIL SPACE AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $13,968 (as filed, not verified)
Interior renovation, creation of new study area. Installation of non-loadbearing interior partition and doorway in Apartment 9B. No change to bulk, use, egress or occupancy.
Filed estimated cost: $9,120 (as filed, not verified)
Relocation of 2 sprinkler heads as illustrated on plans
Filed estimated cost: $3,000 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $1,900,751 (as filed, not verified)
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $1,900,751 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $1 (as filed, not verified)
SECTION 27-2089 ADM CODE ABOVE PREMISES HAVE BEEN VACANT AND UNTENANTED EXCEPT FOR CARETAKER FOR 60 DAYS OR MORE, AND CANNOT BE REOCCUPIED UNTIL A NEW CERTIFICATE OF OCCUPANCY HAS BEEN OBTAINED. PREMISES HAVE BEEN VACANT SINCE STILL VACANT ON 07/02/2013
SECTION 27-2089 ADM CODE ABOVE PREMISES HAVE BEEN VACANT AND UNTENANTED EXCEPT FOR CARETAKER FOR 60 DAYS OR MORE, AND CANNOT BE REOCCUPIED UNTIL A NEW CERTIFICATE OF OCCUPANCY HAS BEEN OBTAINED. PREMISES HAVE BEEN VACANT SINCE 06/09/2012
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE 1 STY. PUBLIC HALL FRONT
SECTION 27-2005 ADM CODE PROVIDE A REGULATION TYPE LOCK FOR BUILDING ENTRANCE DOOR AND MAKE READILY OPEN FOR EXIT TO STREET
SECTION 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT PUBLIC HALL ALL STORIES AND APARTMENTS SO TENANTS CAN ENTER FROM ADJACENT BUILDING ( 1691 3 RD AVENUE) THROUGH THE PARTY WALL BALCONY AT REAR AND EXIT SAFELY THROUGH THE PUBLIC HALLS TO STREET
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR SLOPING FROM NORTH TO SOUTH IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CASING AROUNG WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNOPENABLE WINDOWS AT FIRE ESCAPES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT OUTLET ON EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
D26-10.01, 10.05 ADM CODE REMOVE THE ILLEGAL FASTENING STREET DOOR TO BUILDING.
SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRUDING ONTO 3 STY REAR SOUTH PARTY WALL BALCONY.
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development was not able to gain access to inspect the following conditions. The complaint has been closed. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development responded to a complaint of no heat or hot water and was advised by a tenant in the building that heat and hot water had been restored. If the condition still exists, please file a new complaint.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
50 complaints total.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed May 20, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 12, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
CIANOW CRM Violation Dismissed · disposed Sep 18, 2024
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
CIANOW CRM Violation Dismissed · disposed Aug 25, 2026
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
NB W/ 1ST TCO LESS THAN 10 YRS OLD AT TIME DUE TO COMPLY · disposed Mar 15, 2023
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
CIANOW CRM Violation Dismissed · disposed Apr 10, 2022
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
NB W/ 1ST TCO LESS THAN 10 YRS OLD AT TIME DUE TO COMPLY · disposed Mar 15, 2023
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
CIANOW CRM Violation Dismissed · disposed Aug 25, 2026
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
CHALLENGE APPROVED · disposed Jul 8, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
JTR INV 13347686 PAID ON MARCH 1 2018 · disposed Mar 6, 2018
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DAACIA CANCELLED,BLDG DEMO UNDER JOB#122023906 S/O 03/05/2015 · disposed Apr 12, 2018
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DAACIA CANCELLED,BLDG DEMO UNDER JOB#121825962 S/O 1/20/2015 · disposed Dec 11, 2019
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DAACIA CANCELLED,BLDG DEMO UNDER JOB#121813528 S/O 1/20/2015 · disposed Dec 11, 2019
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DAACIA CANCELLED,BLDG DEMO UNDER JOB#121855572 S/O 1/20/2015 · disposed Dec 11, 2019
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DAACIA CANCELLED,BLDG DEMO UNDER JOB#122084458 S/O 1/20/2015 · disposed Dec 11, 2019
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DAACIA CANCELLED,BLDG DEMO UNDER JOB#122023915 S/O 1/20/2015 · disposed Dec 11, 2019
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DAACIA DISMISSED,FULL PENALTY PD $1000 INV#62150285 CHK#0411027910 · disposed Dec 18, 2019
DAACIA DISMISSED,FULL PENALTY PD $500 INV#62150285 CHK#0411027910 · disposed Dec 18, 2019
DAACIA DISMISSED,FULL PENALTY PD $500 INV#62150285 CHK#0411027910 · disposed Dec 18, 2019
DAACIA DISMISSED,FULL PENALTY PD $500 INV#62150285 CHK#0411027910 · disposed Dec 18, 2019
DAACIA DISMISSED,FULL PENALTY PD $500 INV#62150285 CHK#0411027910 · disposed Dec 18, 2019
DAACIA DISMISSED,FULL PENALTY PD $500 INV#62150285 CHK#0411027910 · disposed Dec 18, 2019
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
AT TIME OF INSPECTION OBSERVED LARGE AMOUNTS OF DEBRIS SCATTERED THROUGHOUT AT APT:#3J,CREATING A HAZARD FOR INJURY A TRIP AND FALL HAZARD/OR A RODENT INFESTATION. WERE OBSERVED AT WORK SITE, MAINTAIN ADEQUATE
Penalty: $2,500 · paid: $2,500
ATOI ON AN ACTIVE JOBSITE, OBSERVED ELECTRICAL WORK/DEMO BEING DONE THROUGHOUT APT:#3J,THIRD FLOOR. UPON REVIEWING. AND DOING A SEARCH ON BIS/DOB NOW REVEAL TO ME THAT NO PERMIT WAS ISSUED FOR ELECTRICAL WORK F
Penalty: $800 · paid: $800
ATOI ON A ACTIVE JOBSITE, OBSERVED UNLICENSED ELECT DEMO BEING PERFORM 3 WORKERS NAME,MING QUANWU/LIANGYUANWEI/WUJIANXIANG&ANOTHER WORKER NOT NAMED INFORM ME THAT THEY ALL WORK FOR HIGH QUALITY CONSTRUCTION,WHO
Penalty: $4,800 · paid: $4,800
BC3301.2/FAILURE TO MAINTAIN SAFETY MEASURES:AT TIME OF INSPECTION OF A 30 STORY NEW BUILDING THAT IS AT ROOF LEVEL.I WALK OUT TO 2ND FL GETBACK AND ACTIVE WORK ABOVE ON A SUSPENDED SCAFFOLD.ALSO WORKERS WERE A
Penalty: $1,600 · paid: $1,600
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.NOTE AT TIME OF INSPECTION OF A 30 STORY NEW BUILDING AT ROOF LEVEL.I OBSERVED AT SEVERAL LOCATIONS EXCESSIVE MATERIALS SCATTERED AND NOT PROPERLY SECURED ALONG WITH CO
Penalty: $400 · paid: $400
SAFETY MEASURES;NOTE AT TIME OF INSPECTION OF A 30 STORY NEW BUILDING THAT IS TOPPED OF A WORKER WAS INJURED WHILE INSTALLING A CONCRETE SLAB AT 2ND FLR SET BACK.WHILE LIFTING CONCRETE PANEL IN PLACE VIA HOIST
3314.4.3.2 INSTALLATION INSPECTION.ALL EQUIPMENT IS TO BE INSPECTED ONCE INSTALLATION IS COMPLETE(AS PER DRAWINGS)NOTE:AT TIME OF INSPECTIONI OBSERVED SEVERAL SUSPENDED SCAFFOLDS IN PLACE WITH NO INSTALLATION.
FAILURE TO SAFEGUARD AL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTE:AT TIME OF INSPECTION SSM REPORTED FALLEN WINDOW TRIM PIECE FROM SUSPENDED SCAFFOLD ON TO STREET.REMEDY:COMPLY WITH CODE.
Penalty: $5,000 · paid: $5,000
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. CEASE USE FOR FOLLOWING TWO ITEMS. 100X)IN CAR SENSORS TOPREVENT OVER CAPACITY INOPERATIVE. 100N)IN CAR SENSOR BYPASSED CAR CON
Penalty: $10,000 · paid: $10,000
NO TEMP LIGHTING.NOTICED @ TIME OF INSPECTION NB IN PROGRESS NOTICED ON 5TH,13TH,14TH & 15TH FL HALLWAYS DARK W/ NO TEMP LIGHTING.WORKERS WORKING VARIOUS (TRACKS) IN HALLWAY IN DARK CONDITIONS.REM PROVIDE TEMP
SEC. 3314.11.6 WIRE ROPE CLIPS. WHEN WIRE CLIPS ARE USED ON SUSPENDED SCAFFOLD THERE SHALL BE A MINIMUM OF 3 WIRE ROPE CLIPS INSTALLED A MMINIMUM OF 6 ROPE DIAMETER APART. NOTE: AT TIME OF INSPECTION I OBSERVED
Penalty: $400 · paid: $400
SEC. 3314.8 GUARDRAILS & TOEBOARD. ALL WORKING PLATFORM NEED TO HAVE TOP,MID,ENDRAILS & TOE BOARD. NOTE: AT TIME OF INSPECTION I OBSERVED SUPPORTED SCAFFOLD IN PLACE W/SEVERAL WORK LEVELS(ACCESSING)A COMPLETED
Penalty: $400 · paid: $400
SEC. 3314.8 GUARDRAILS & TOE BOARDS. ALL WORK PLATFORM NEED TO HAVE TOP,MID,END RAILS & TOE BOARD. NOTE: AT TIME OF INSPECTION I OBSERVED OVERHEAD PROTECTION/WORK PLATFORM IN PLACE IN BLDGS LOWER LEVELS ABOVE
Penalty: $400 · paid: $400
FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPRORARY CONSTRUCTION.NOTE:AT THE TIME OF MY INSPECTION OF A 30 STORY BUILDING AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS.I OBSERVED CAULKI
3314.4.4.5 DISLODGEMENT.NOTE:AT THE TIME OF MY INSPECTION OF A 30 STO RY BUILDING AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS.I OBSERVEDA SUSPENDED SCAFFOLD IN PLACE AT EXPOSURE 2 AT EXTERIOR OF BUILDING ON
Penalty: $400 · paid: $400
USE OF SUPPORTED SCAFFOLD WITHOUT A USER CERTIFICATE.NOTE:AT THE TIME OF MY INSPECTION OF A 30 STORY BUILDING AT A SUPPORTED(BAKER)SCAFFOLDON STAIRWAY,WITHOUT GUARDRAILS ALSO WITH A FALLING HEIGHT AT APPROX 6 T
Penalty: $400 · paid: $400
BC3314.8/GUARDRAIL;NOTE:AT THE TIME OF INSPECTION OF A 30 STORY BUILDING AT ROOF LEVEL,CONSTRUCTION WORK IN PROGRESS.I OBSERVED TWO WORKERS ON BAKER SUPPORTED SCAFFOLD PERFORMING MASONRY WORK IN STAIRWAY,I ALSO
Penalty: $1,600 · paid: $1,600
FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURES & TEMPORARY CONSTRUCTION EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION OF A 30 STY BLDG AT ROOF LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED STEBACK ON 2ND,6TH
Penalty: $5,000 · paid: $5,000
BC3309.14/FAILURE TO PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OPERATIONS.DURING INSPECTION OBSERVED THAT THE LOT LINE WINDOWS AND BRICK WALL WERE SPLASHED AND WINDOW SILLS HAD DEBRIS FROM CMU INSTALLATI
VERTICAL NETTING SYSTEMS AT TIME OF INSPECTION NOTED THAT THE VERTICALNETTING FROM 28TH TO 24 FLR WHERE NOT MAINTAINED THE ZERO CABLE WHERE NOT TAUNT,CAUSING THE ZERO CABLE TO WAVE IN THE WIND AND POTENTIALLY A
Penalty: $400 · paid: $410
BC3303.2.3.1/TEMPORARY LIGHTING FOR CONSTRUCTION AT TIME OF INSPECTIONNOTED:THAT AT 27TH FLR THRU 25# TEMP LIGHTS INSTALLED IN STAIR WAY POTENTIAL FOR TRIPPING DUE TO NOT LIGHTS.REM:COMPLY WITH CODE PROVIDE TEM
Penalty: $400 · paid: $404
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.AT TIME OF INSPECTION NOTED @ EXPO #3 OF JOB SITE OVERHEAD PROTECTION OF ADJOINING PROPERTY NOT MAINTAINED THERE IS DEBRIS ALL OVER THE ENTIRE O
Penalty: $400 · paid: $400
BC3308.6/HORIZONTAL SAFETY NETTING.AT TIME OF INSPECTION AT 26TH FLR LEVEL OF BLDG NOTED THAT THE HORIZONTAL NETTINGS OF BLDG WHERE TIED OFFTO THE RESHORES ON THE FLR WHICH IS NOT PROCEDURE DUE TO THE FACT THAT
Penalty: $1,600 · paid: $1,600
BC3301.2/HOLES NOT COVERS OR INADEQUATE COVER.AT TIME OF INSPECTION NOTED HOLE NOT COVERED AT 27TH THRU 24TH FLR AND HOLE COVERINGS APPROX 1"THICK NOT STANDARD PORTENTIAL TRIPPING HAZARD ON PLYWOOD.REM:COMPLY W
Penalty: $400 · paid: $400
BC3301.6/DESIGN TEMPORARY CONSTRUCTION AT TIME OF INSPECTION NOTED A WALKING TEMPORARY PLATFORM ON SLAB WHERE WORKERS CAN WALK OVER,BELOW FLR APPROX 12'NO DESIGN DRAWING TO SHOW THE LOAD CAPACITY OF PLATFORM AN
Penalty: $1,600 · paid: $1,603
3308.3 VERTICAL SAFETY NETTING NOT PER CODE, DAMAGED OR INADEQUATE.@TIME OF INSPECTION OBSERVED A NEW BLDG CONSTRUCTION ERECTED TO 15TH FLR DURING INSPECTION NOTED VERTICAL SAFETY WERE NOT SECURED,OR DAMAGED @V
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.@TIME OF INSPECTION OBSERVED A NEW BLDG CONSTRUCTION ERECTED TO 15FLR. DURING THE INSPECTION NOTED THAT THERE WERE DEBRIS, CONSTRUCTION GARBAGE
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OOPERATIONS.NOTED: WHILE POURING THE 1ST FL WITH A CONCRETE PUMP STRUCKA LABONEN IN THE HEAD CAUSING AN INJURY WHICH NEEDED TO BE HOSPITALIZ
SIGNAGE. AT TIME OF INSPECTION I OBSERVED A CONST SIDE W/A OVERHEAD SIDEWALK SHED. OVERHEAD SHED HAD ALL ALONG 3RD AVE SIDE(EXP#1)UNLAWFUL SIGNS,INFORMATION,BUSINESS ADVERTISING ALONG PARAPET WALL RUNNING APPRO
Penalty: $2,400 · paid: $2,400
BC 3301.2 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPS.@ THE TIME OF MY INSP N.B STRUCTURE UP TO 2 STORY.I OBSERVED WORKERS WORKING IN THE RAIN USING ELECTRICAL EQUIPMENT/TOOLS SUCH AS SAWS
FAILURE TO PROVIDE PROJECT INFO PANEL.@THE TIME OF MY INSP,CONST,WORK IN PROGRESS,N.B STRUCTURE UP TO 2 STORY.I OBSERVED PROJECT INFO PANEL IS MISSING ON EVERY (FROUNT) END OF THE CONST SITE & THE ONE THAI IS I
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPS.AS REPORTED BY CONST OPS.AS REPORTED BY SSM#1497 WORKERS WAS ERECTING A SIDEWALK SHED @EXP#2 THE NORTHSIDE OF THE CONST SITE,WHEN ONE WORKER TOS
WORK DOES NOT CONFORM TO APPROVED SITE SAFETY PLANS(SSP 102.00 DATED 1-22-16) IN THAT CONCRETE PUMPING OPERATIONS ARE IN PROGRESS FROM (FINISH)IN STREET WHILE MAINTAINING A TEMPORARY WALL WAY DIRECTLY ADJ PUMPI
Penalty: $500 · paid: $500
SEC. 3301.6 DESIGN,SIZES,CAPACITY OF MATERIALS,STRUCTURES TEMPORARY CONSTRUCTION & EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION OF A 23 STYBLDG AT FOUNDATION PHASE. I OBSERVED A PLATFORM BUILT OF LUMBER ATTACH
Penalty: $1,630 · paid: $1,630
SEC. 3307.7.5 DESIGN OF FENCES. NOTE: AT THE TIME OF MY INSPECTION OF A 23 STY BLDG AT FOUNDATION PHASE. I OBSERVED APPROX 200FEET OF CONSTRUCTION FENCE ERECTED AT EXP#1 & 2 MADE OF PLYWOOD ATTACHED ONTO METAL
Penalty: $800 · paid: $800
FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS @ JOBSITE @ TIME OF INSP.@ TIME OF INSP.THE PLAN DID NOT HAVE ALL THE NECESSARY DETAIL FOR THE INSTALLATION OF THE CONCRETE PIERS.THERE WAS NO DETAIL SHOWING HOW OR NO
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 1681 3 AVENUE, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.