← Buildings

The Residences by Peter Marino

Built in 2015, 5 residences across 11 floors.

503 West 24th Street, 10011

503 West 24th Street, the Residences by Peter Marino, was designed by Marino, eleven storeys holding five residences beside the High Line, with a gallery at its base. It replaced a filling station on the site.

The elevation is largely glass with thin black mullions, and the window sizes vary rather than repeating. The southwest corner is set back from the High Line and balconies are cut into the form there rather than projecting from it.

Five apartments in eleven storeys means every residence is unique in plan, so nothing transfers between them. Floors are heated hydronically, which rules out some floor build-ups and constrains what can be laid over them.

Varied window sizes with thin mullions mean the perimeter rhythm is irregular, so a repeating run of anything at the window wall will not align.

Within walking distance

73 mGladstone Gallery · gallery
73 mMatthew Marks Gallery · gallery
111 mLuhring Augustine · gallery
128 mAlexander Gray Associates · gallery
139 mPace Gallery · gallery
159 mGalerie Lelong · gallery

Building facts

Built

2015

Floors

11

Residences

5

New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1006967503.

Public records show 503 WEST 24 STREET was built in 2015 and rises 11 floors with 5 residential units (NYC MapPLUTO, version 26v2). The Department of Buildings has 4 job filings on record for this lot (NYC Open Data).

Public record

Total units

7

Total permits

4

NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1006967503. Violations and permits as of October 26, 2026.

1 filing in the last 24 months, 1 open violation, last filing Nov 2025

The record

Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.

DOB NOW filings from June 2016.

Suspended ScaffoldFiled by CENTRAL CONSTRUCTION MGMTlic. 006591Permit Issued · Nov 13, 2025 · job M01316203-I1

INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.

Filed estimated cost: 0 (as filed, not verified)

3 earlier filings, 2017–2022
Protection and Mechanical MethodsFiled by VIK XS SERVICES INClic. 618555Permit Issued · Nov 12, 2022 · job M08037982-I1

Use of existing Davits for Installation and Use of Suspended Modular Platforms as per plans filed herewith. No change in use, egress, or occupancy.

Filed estimated cost: $1,000 (as filed, not verified)

Sidewalk ShedFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Nov 17, 2017 · job M00002540-I1

INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $30,000 (as filed, not verified)

Sidewalk ShedFiled by SAFWAY ATLANTIC, LLClic. 608211Signed-off · Nov 16, 2017 · job M00002540-I1

INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Filed estimated cost: $30,000 (as filed, not verified)

2 resolved
HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

HPD Violation · Class IVIOLATION DISMISSED

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.

Condo documents are recorded at unit level. Search a unit to see them.

Pre-2016 DOB filings

DOB legacy · NYC Open Data

29 A2 filings1997–2019
1 SC filing2017
14 A3 filings2013–2019
5 NB filings1998–2014
1 DM filing2013

DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 26, 2026.

DOB legacy violations

DOB BIS · NYC Open Data

FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED — V-DOB VIOLATION - ACTIVEFeb 21, 2022

FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

DELETED BY CAW ON 05/23/23 BECAUSE REMOVE FROM FISP 9A

3 resolved, most recent Jun 23, 2021
E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedJan 22, 2020

PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedJan 22, 2020

PPN203 AOC SUB 05/25/2021 BY VAN DEUSEN AND AS.CERT 610153 EDUARDO RIVERA · disposed Jun 23, 2021

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDFeb 23, 2018

VIOLATION COMPLIED WITH · disposed Feb 25, 2018

DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 26, 2026.

ECB violations

Environmental Control Board · NYC Open Data

36 resolved, most recent Dec 1, 2022
Local Law — CLASS - 2RESOLVE · Dec 1, 2022

FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #917426.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE

Construction — CLASS - 1RESOLVE · Feb 23, 2018

FAILURE TO HAVE SITE SAFETY MANAGER/COORDINATOR PRESENT. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF AN 11 STORY BUILDING, UPON REQUEST TO SPEAK WITH SITE SAFETY MANAGER/COORDINATOR NONE WAS PRESENT/AVAILABLE

Unknown — CLASS - 1RESOLVE · May 24, 2017

BC 3301.7 NO DESIGN DRAWING. AT TIME OF INSPECTION IN RESPONSE TO AN INCIDENT WEHRE IT WAS REPORTED THAT A WORKER HAD HIT HIS HEAD AND FELLDOWN STAIRS. UPON INSPECTION OF THE STAIRS, I OBSERVED THAT THERE WAS

Construction — CLASS - 2RESOLVE · May 24, 2017

HOUSEKEEPING. AT TIME OF INSPECTION, OBSERVED THAT THERE WSA INADEQUATE HOUSEKEEPING AT VARIOUS LOCATIONS THROUGHOUT THE 1ST AND 2ND STYS. CONSISTING OF BLDG MATERIALS, DEBRIS, TOOLS, LAYONG ON FLOORS AND

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · May 24, 2017

FAILURE TO SAFEGUARD PERSONS AND PROPERTY IN RESPONSE TO AN INCIDENT WHERE IT WAS REPORTED THAT A WORKED HAD HIT HIS HEAD AND FALLEN DOWN A STAIRS UPON INSPECTION OF THE AREA, OBSERVED THAT THERE WAS A PLATFOR

Construction — CLASS - 1RESOLVE · Jan 12, 2017

SEC: BC3316.9.2. RECFER TO SWO 011317X501. NO 16/32 HOME RIGGING CENTS. MMC CD# 4333 CN# 828/16 HMO MARK M JONES ICE# 9328 EXP 9/30/17. RIGGERS INVOLVED W/ INCIDENT COMPLAINT# 1441123 COULD NOT PROVIDE RIGGER C

Construction — CLASS - 1RESOLVE · Jan 12, 2017

REFER TO SWO# 011317X501. FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. MMC CB# 4333 CN# 828/16 HMO MARK M JONES LIC# 9328 EXP 9/30/17 WHILE TRIPPING WINDOW PANNEL FROM HORIZON

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 2RESOLVE · Jan 12, 2017

3308.3 VERTICLE SAFETY NETTING NO PER CODE.NOTE:@TIME FO INSPECTION NOTED @ 5TH FLR THROUGH 10TH FLR LEVEL OF JOBSITE THAT THE ZERO CABLE OF NETTING WAS NOT @ZERO AND NETTING.WAS NOT SECURED @FLR LEAVING AN EXP

Penalty: $400 · paid: $412

Construction — CLASS - 2RESOLVE · Jan 12, 2017

225.10 RACEWAY ELECTRICAL.NOTE:TO ENSURE THE SAFETY OF WORKERS AND OF THE PUBLIC.@TIME OF INSPECTION NOTED THAT THERE WAS ELECTRICAL CABLE ON THE INSIDE OF JOBSITE ROMEX POWERED ATTACHED TO THE PIPES OF THE JOB

Penalty: $400 · paid: $400

Cranes and Derricks — CLASS - 1RESOLVE · Jan 12, 2017

KETON TO SWO 011317X501, INADEQUATE SAFETY MEASURES OPERATION OF CRANEHOISTING EQUIPMENT IN AN UNSAFE MANNER. MMC CD# 4333 CN# 828/16 HMO MARK M JONES LIC# 9328 EXP 9/30/17 UNCERTIFIED RIGGERS TRIPPING A WINDOW

Unknown — CLASS - 1RESOLVE · Jan 12, 2017

DOCUMENTS TO BE KEPT ON SITE.NOTE:@TIME OF INSPECTION A 11 STRY BLDG @2ND FLR TO 11TH FLR LEVEL CONSTRUCTION WORK IN PROGRESS I OBSERVED CONCRETE EMBEDDED STAMPS INSTALLED.UPON REQUEST OF INSPECTION REPORT DAIL

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 1RESOLVE · Jan 12, 2017

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS @TIME OF INCIDENT,THE PEDESTRIAN WALKWAY SHED AND FENCE WASSTRUCK BY A CURTAIN WALL THAT WERE BEING HOISTED UP TO THE BLDG @EXP #

Construction — CLASS - 1RESOLVE · Jan 12, 2017

SLIPPING AND TRIPPING HAZARD.@TIME OF INSPECTION NOTED @ EXP #1,2 GATEENTRANCE FOR DELIVERIES THAT THE SIDEWALK WAS SEVERLY DAMAGED DUE TO CONSTRUCTION OPERATIONS POTENTIALLY POSING A TRIPPING HAZARD TO THE PUB

Penalty: $400 · paid: $400

Construction — CLASS - 2RESOLVE · Jan 12, 2017

PSWO FOR SUPPORTED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED @PREMISES.WORK DOES NOT CONFORM TO APPROVED PLAN.NOTE:OBSERVED SUSPENDED SCAFFOLD IN CONNECTION W. OUTZIGGER BEAMS ERECTED @ EXP #4(NORTHSIDE).

Penalty: $250 · paid: $250

Construction — CLASS - 1RESOLVE · Jan 12, 2017

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS SSP @TIME OF INSPECTION NOTED THAT THE SITE SAFETY PLANSDID NOT REFLECT A PICK ZONE @EXP #2 OF JOBSITE WHERE CURTAIN IN WALL O

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 1RESOLVE · Jan 5, 2017

OPERATON OF ARTICULATING BOOM CRANE W/OUT A CERTIFICATE OF OPERATION SEE STOP WRK ORDER SWO#010614RH01 AT TIME OF INSPECTION KNUCKLE BOOM,LIC.PLATES NO#99102-PA(NY)WAS BEING USED TO ERECT JIB 95'ON MAIN CRANE C

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 1RESOLVE · Jan 5, 2017

OPERATION OF ATICULATING BOOM CRANE W/OUT A CERTIFICATE OF OPERATION.SEE STOP WORK ORDER ISSUED.SWO#010617RH01 AT TIME OF INSPECTION,GLASS INSTALLERS.CONTRACTED BY GC LEND LEASE USED KNUCKLE BOOM(NY LIC#99102PA

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 1RESOLVE · May 4, 2016

SEC: 3305.3.6.1.2. RESHORES. @ TIME OF INSP I OBSERVED MORE THAN 10 RESHORES NOT SECURRED AS PER BLDG MEASUREMENT. POTENTIAL OF FALLING & INJURING WORKERS. ONE SHORE HAD A 4X4 SITTING ON TOP OF RESHORE. REM: PS

Penalty: $1,600 · paid: $1,600

Construction — CLASS - 1RESOLVE · May 4, 2016

SEC: 3301.8.1. ACCIDENTS- YSE & TAMPERING PROHIBITED. @ TIME OF INSP I WAS RESPONDING TO AN ACCIDENT. A WORKER FELL THROUGH AN OPENING ON THE 1ST FLR TO BASEMENT APPROX 10FT. OPENING WAS NOT COVERED, HAD REBAR

Penalty: $1,600 · paid: $1,600

Construction — CLASS - 1RESOLVE · May 4, 2016

FAILURE TO SAFE GUARD ALL PENSIONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. @ TIME OF INSP I WAS RESPONDING TO AN ACCIDENT. WORKER FELL THROUGH OPENING FROM 1ST FLR TO BASEMENT. OPENING WAS NOT COVERED,

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 1RESOLVE · May 4, 2016

FAILURE TO SAFEGUARD- REBAR CAPS. @ TIME OF INSP I OBSERVED ON MULTIPLE LEVEL FROM 1ST TO DECKING FLR REBAR PROTRUDING FALLING & BEING IMPALED ON REBAR. MORE THAN 50 REBARS PROTRUDING VERTICALLY & NO REBAR CAPS

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 1RESOLVE · May 4, 2016

FAILURE TO INSTITUTE/ MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP. CONSTRUCTION. NO GUARDRAILS. @ TIME OF INSP I OBSERVED A CONSTRUCTION W/ GANG LADDERS ON VARIOUS LANDINGS. GUARDRAILS WERE LOWERED, BELOW BLDG C

Penalty: $2,400 · paid: $2,400

Construction — CLASS - 1RESOLVE · May 4, 2016

SEC: 3307.2.3. PROTECTION OF PEDESTRIANS. @ TIME OF INSP I OBSERVED A TEMPORARY WALKWAY UNDER A SIDEWALK SLED OPEN TO THE PUBLIC. ON THE OTHERSIDE OF WALKWAY A CRANE HAS BEEN PERMANENTLY POSITIONED & MATERIALS

Construction — CLASS - 1RESOLVE · Apr 19, 2016

SEC. 3301.7 DOCUMENTS TO BE KEPT ON SITE. NOTE: AT THE TIME OF MY INSPECTION OF AN 11 STY BLDG AT 3RD FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED CONCRETE SAFETY EMBEDED STRAPS INSTALLED AT 1ST & 2ND FL

Construction — CLASS - 1RESOLVE · Apr 19, 2016

SEC. 3307.6.2 FAILURE TO PROVIDE OVERHEAD PROTECTION AT EGRESS & INGRESS W/I SITE FROM BLDG. NOTE: AT THE TIME OF MY INSPECTION OF AN 11 STYBLDG AT 3RD FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED THAT

Construction — CLASS - 1RESOLVE · Apr 19, 2016

SEC. 3301.6 DESIGN,SIZES & CAPACITY OF MATERIALS,STRUCTURES,TEMPORARY CONSTRUCTION & EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION OF AN 11 STY BLDG AT 3RD FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED A

Construction — CLASS - 2RESOLVE · Apr 14, 2016

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR AMENDMENT.AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OBSERV ED.TOP REINFORCEMENT OUT OR THE 10TH CONCRETE GROUND FLOOR SLAB.STRUC

Penalty: $250 · paid: $250

Construction — CLASS - 1RESOLVE · Oct 5, 2015

SITE SAFETY PLAN DOES NOT REFLECT SITE CONDITIONS.NOTED AT TIME OF INSP.OF 11 STORY BLDG UNDER CONSTRUCTION HAS DIESEL GENERATING WITHIN 2-3 FEET OF SWINGING COUNTER WEIGHT OF(CRANE)NOT SHOWN ON SITE SAFETY PLA

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 1RESOLVE · Oct 5, 2015

FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP.CONSTRUCTION.NO TOE BOARDS AT TIME OF INSP.NOTICED THRE IS A SEVERAL LOCATIONS AT THE GROUND FLOOR LEVEL AND ON THE WORKING PLATFORMS.REM:PROVIDE

Penalty: $1,000 · paid: $1,000

Construction — CLASS - 2RESOLVE · Oct 5, 2015

(DESIGN)REQUIRED BY THE CHAPT.33 AT TIME OF INSP.OF 11 STORY NEW BLDG HAS HOME MADE WASH OUT BOX WITH NO DESIGN PLAN.OBSEVED CONCRETE WASHOUT WATERS GOING TO SEWAR SYSTEM.SYSTEM DESIGN "STOP ALL WORK"CONCRETE O

Construction — CLASS - 2RESOLVE · Oct 5, 2015

FAILURE TO COMPLY WITH NYC FIRE CODE.GENERAL NO PERMIT FOR(DESAL)CONVERTS WITH CAPACITY OF 39.6 GAL DESAL FOR 11 STORY PURPOSED NEW BLDG AT FORMED.PLEASE STOP AND WALK(USE OF GENERATORS)ISSUED PURSUANT TO 28-20

Construction — CLASS - 1RESOLVE · Oct 5, 2015

3303.15 CONCRETE WASHOUT WATER.NOTED:AT TIME OF INSP.OF 11 STORY NEW BLDG WATER CONSTRUCTION HAS CONCRETE OPERATION WITH CONCRETE WASHOUT WATER MAKING THE STORM DRAIN SYSTE.REM:PREVENT WASHOUT WATER FROM DRAINI

Construction — CLASS - 2RESOLVE · Dec 22, 2014

FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPS.NOTED ADJACENT PROPERTY 245 10TH AVE WAS DAMAGE WHEN EXCAVATOR ARM SCRATCHED MADE A HOLE ON THE STYROFOAM CLADDING EXTERIOR WALL.NO STRUCTURAL D

Penalty: $1,200 · paid: $1,200

Unknown — CLASS - 2RESOLVE · Sep 1, 2014

FAILURE TO POST PERMIT FOR WORK AT PREMISES. NOTE: DEMOLITION JOBSITE,BLDG DOWN TO GRADE LEVEL. FENCE ERECTED ON EXPOSURE #1 & #2. NO PERMIT POSTED ON SITE OR JOBSITE FENCE. REMEDY: POST PERMIT AS PER CODE.

Construction — Non-HazardousRESOLVE · Apr 28, 1996

WORK WITHOUT PERMIT NOTED AN APPROX 15X8X10 HIGH WOODEN STRUCTURE HAS BEEN ERECTED AT THE SOUTHWEST CORNER OF THE PREMISES & NOW BEING USED AS TYPE REPAIR SHOP AT THE PREMISES OR GETTY GAS STTION REMEDY OBTAIN

Penalty: $175 · paid: $175

Construction — Non-HazardousRESOLVE · Apr 28, 1996

OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPT RECORDS NOTED AN APPRO 15X8X10 HIGH TEMP WOODEN STRUCTURE HAS BEEN ERECTED AT THE SOUTHWEST CORNER OF PREMISES & NOW BEING USED AS TYPE REPAIR STOP AS THE PRE

ECB Violations (6bgk-3dad), NYC Open Data. As of October 26, 2026.

Certificates of occupancy

DOB · NYC Open Data

TemporaryIssued · Sep 30, 2020 · DOB Legacy
10 earlier certificates
TemporaryIssued · Jun 18, 2020 · DOB Legacy
Renewal Without Change5 dwelling unitsCO Issued · Nov 30, 2021 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · Oct 2, 2023 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · Sep 15, 2021 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · Aug 1, 2022 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · Jul 13, 2023 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · May 17, 2021 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · May 3, 2022 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · Apr 24, 2023 · DOB NOW
Renewal Without Change5 dwelling unitsCO Issued · Feb 11, 2022 · DOB NOW

DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 26, 2026.

What are you trying to do here?

Public records for 503 WEST 24 STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 26, 2026.