Late 1920s printing factory, converted 2000, 21 residences across 16 floors.
145 Hudson Street, 10013
145 Hudson Street was built in the late 1920s as a printing factory, sixteen storeys of Art Deco, and converted to residential lofts in 2000 under the name Sky Lofts.
The sources disagree on whether it went up in 1928 or 1929, so this page does not settle the year.
What the conversion produced is loft floors rather than apartment plans: large open areas carrying the column grid of a factory, with window openings scaled for daylight over machinery rather than for rooms. In a building of this kind the columns are the fixed points and they fall on an industrial spacing, so partitions are set to that grid or held deliberately clear of it, and any plan begins by deciding which.
The building went up as a printing factory, and the structure it was given for that use is still what the apartments sit on.
Within walking distance
Building facts
Built
1929
Last altered
2004
Floors
16
Residences
21
Historic district
Tribeca West Historic District
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1002147502.
Public records show 145 HUDSON STREET was built in 1929 and rises 16 floors with 21 residential units (NYC MapPLUTO, version 26v2). This lot falls within the Tribeca West, designated May 6, 1991 by the Landmarks Preservation Commission (NYC Open Data). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Last altered
2004
Total units
63
Historic district
Tribeca West
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1002147502. Violations and permits as of October 27, 2026.
5 filings in the last 24 months, 2 open violations, last filing Sep 2025
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed estimated cost: $2,500 (as filed, not verified)
Installation of (2) 6ton water source heat pumps located in the existing mechanical room.
Filed estimated cost: $45,000 (as filed, not verified)
INSTALLATION OF SUSPENDED SCAFFOLD TO PERFORM FACADE WORK AND INSPECTIONS.
Filed estimated cost: 0 (as filed, not verified)
Theexisting exterior doors are to be replaced andthe outer vestibule is to be enclosed as per the drawings filed herewith. No change in use, egress, or occupancy.
Filed estimated cost: $50,000 (as filed, not verified)
RENOVATION OF EXISTING DUCT WORK AND INSTALLATION HEAT PUMP ON THE FIRST FLOOR (LOBBY) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $40,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INTERIOR RENOVATION OF APARTMENT LOCATED ON 14TH FLOOR OF RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TI USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $200,000 (as filed, not verified)
INSTALLATION OF 600# to 1000# CAPACITY MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF 600# to 1000# CAPACITY MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $1,000 (as filed, not verified)
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $1,000 (as filed, not verified)
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filed estimated cost: $1,000 (as filed, not verified)
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $2,896,000 (as filed, not verified)
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $2,896,000 (as filed, not verified)
MISCELLANEOUS FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $2,896,000 (as filed, not verified)
COOLING TOWER REPLACEMENT, DUNNAGE BEAM REPLACEMENT, AND STAND-ALONE BUILDING MANAGEMENT SYSTEM (BMS) INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $401,625 (as filed, not verified)
COOLING TOWER REPLACEMENT, DUNNAGE BEAM REPLACEMENT, AND STAND-ALONE BUILDING MANAGEMENT SYSTEM (BMS) INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $401,625 (as filed, not verified)
COOLING TOWER REPLACEMENT, DUNNAGE BEAM REPLACEMENT, AND STAND-ALONE BUILDING MANAGEMENT SYSTEM (BMS) INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $401,625 (as filed, not verified)
SCOPE OF WORK INCLUDES MODIFICATIONS TO EXISTING PLUMBING FIXTURES AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $33,000 (as filed, not verified)
SCOPE OF WORK TO INCLUDE INTERIOR RENOVATION OF APARTMENT #8B AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $146,550 (as filed, not verified)
SCOPE OF WORK TO INCLUDE INTERIOR RENOVATION OF APARTMENT #8B AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $146,550 (as filed, not verified)
SCOPE OF WORK INCLUDES MODIFICATIONS TO EXISTING PLUMBING FIXTURES AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Filed estimated cost: $33,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
PLUMBING WORK IN CONJUNCTION WITH APPLICATION M00477534-I1
Filed estimated cost: $46,000 (as filed, not verified)
PLUMBING WORK IN CONJUNCTION WITH APPLICATION M00477534-I1
Filed estimated cost: $46,000 (as filed, not verified)
PLUMBING WORK IN CONJUNCTION WITH APPLICATION M00477534-I1
Filed estimated cost: $46,000 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
Modify ductwork and diffusers of existing heat pump system, modify bath exhaust ductwork to tie into existing building exhaust system.
Filed estimated cost: $30,000 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
replace non bearing interior partitions, replace all finished flooring, ceilings, finishes, remove, replace and/or relocate all appliances. No change to use, egress or occupancy. PL filing under M
Filed estimated cost: $187,500 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
remove, relocate, replace and install plumbing fixtures, relocate, replace and install sprinkler heads.
Filed estimated cost: $48,500 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING DUPLEX APARTMENT AT 15 & 16 FLOOR , NEW KITCHEN CABINETS, NEW WALL AND FLOOR FINISHES, NEW BATHROOM FINISHES, ALL WORK AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS
Filed estimated cost: $195,000 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING DUPLEX APARTMENT AT 15 & 16 FLOOR , NEW KITCHEN CABINETS, NEW WALL AND FLOOR FINISHES, NEW BATHROOM FINISHES, ALL WORK AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS
Filed estimated cost: $195,000 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING DUPLEX APARTMENT AT 15 & 16 FLOOR , NEW KITCHEN CABINETS, NEW WALL AND FLOOR FINISHES, NEW BATHROOM FINISHES, ALL WORK AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS
Filed estimated cost: $195,000 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING DUPLEX APARTMENT AT 15 & 16 FLOOR , NEW KITCHEN CABINETS, NEW WALL AND FLOOR FINISHES, NEW BATHROOM FINISHES, ALL WORK AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS
Filed estimated cost: $195,000 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING DUPLEX APARTMENT AT 15 & 16 FLOOR , NEW KITCHEN CABINETS, NEW WALL AND FLOOR FINISHES, NEW BATHROOM FINISHES, ALL WORK AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS
Filed estimated cost: $195,000 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING DUPLEX APARTMENT AT 15 & 16 FLOOR , NEW KITCHEN CABINETS, NEW WALL AND FLOOR FINISHES, NEW BATHROOM FINISHES, ALL WORK AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS
Filed estimated cost: $195,000 (as filed, not verified)
INSTALLATION OF PLUMBING FIXTURES ON THE LOBBY AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
RENOVATION OF EXISTING DUCT WORK AND INSTALLATION HEAT PUMP ON THE FIRST FLOOR (LOBBY) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $40,000 (as filed, not verified)
INSTALLATION OF PLUMBING FIXTURES ON THE LOBBY AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
MODIFICATION OF SPRINKLERS ON THE LOBBY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
Demolition and relocation of sprinkler heads, installation of new sprinkler heads. There is no change in occupancy, use or egress.
Filed estimated cost: $17,006 (as filed, not verified)
Demolition and relocation of sprinkler heads, installation of new sprinkler heads. There is no change in occupancy, use or egress.
Filed estimated cost: $17,006 (as filed, not verified)
REMOVAL AND REPLACEMENT OF DUCTWORK AND GRILLES/DIFFUSERS. THERE IS NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Filed estimated cost: $25,025 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Condo documents are recorded at unit level. Search a unit to see them.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
CYCLE 9A UNSAFE REPORT FILED
CIANOW CRM Violation Dismissed · disposed Aug 19, 2024
PPN203 AOC SUB ON 7/13/2020 BY:ROTAVELE ROBERT MCKUHAN, CERT #445003 · disposed Aug 20, 2020
PPN203 AOC SUB ON 5/19/2020 BY:ROTAVELE ROBERT MCKUHAN, CERT #445003 · disposed Jun 24, 2020
PPN203 AOC SUB ON 9/16/2020 BY:ROTAVELE FRANK TORTELLA, CERT#445001 · disposed Oct 21, 2020
PPN203 AOC SUB ON 5/19/2020 BY:ROTAVELE ROBERT MCKUHAN, CERT #445003 · disposed Jun 24, 2020
PPN203 AOC SUB ON 5/19/2020 BY:ROTAVELE ROBERT MCKUHAN, CERT #445003 · disposed Jun 24, 2020
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
ACC1 2014 AOC INSPECTION PROFORMED 3/31/15 · disposed Dec 12, 2016
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
ACC 2014 AOC INSPECTION PROFORMED 3/31/15 · disposed Dec 12, 2016
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
ACC1 2014 AOC INSPECTION PROFORMED 3/31/15 · disposed Dec 12, 2016
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2015
PAID INV # 61704083 · disposed Jun 27, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 10, 2016
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 1, 2013
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 1, 2013
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 1, 2013
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Oct 1, 2013
PPN203 AOC SUB ON 050312 BY ROTAVELE ELEV CERT445002 INSP JOHN MALLIA · disposed Jul 11, 2012
PPN203 AOC SUB ON 050312 BY ROTAVELE ELEV CERT445002 INSP JOHN MALLIA · disposed Jul 11, 2012
PPN203 AOC SUB ON 050312 BY ROTAVELE ELEV CERT445002 INSP JOHN MALLIA · disposed Jul 11, 2012
PPN203 AOC SUB ON 050312 BY ROTAVELE ELEV CERT445002 INSP JOHN MALLIA · disposed Jul 11, 2012
PPN203 AOC SUB ON 071812 BY ROTAVELE ELEVATOR CERT#445002 JOHN MALLIA · disposed Aug 14, 2012
PPN203 AOC SUB ON 071812 BY ROTAVELE ELEVATOR CERT#445002 JOHN MALLIA · disposed Aug 14, 2012
PPN203 AOC SUB ON 071812 BY ROTAVELE ELEVATOR CERT#445002 JOHN MALLIA · disposed Aug 14, 2012
PPN203 AOC SUB ON 071312 BY ROTAVELE ELEVATOR CERT#445002 JOHN MALLIA · disposed Aug 14, 2012
PPN203 AOC SUB ON 071312 BY ROTAVELE ELEVATOR CERT#445002 JOHN MALLIA · disposed Aug 14, 2012
PPN203 AOC SUBMITTTED 5/22/08 BY LIFT-TECH LTD CERT # 419-001 · disposed May 27, 2008
AS PER INSPECTORS ROUTE SHEET · disposed Apr 10, 2008
PPN203 AOC SUBMITTED 5/22/08 BY LIFT-TECH LTD CERT # 419-001 · disposed May 27, 2008
PPN203 AOC SUBMITTED 5/22/08 BY LIFT-TECH LTD CERT # 419-001 · disposed May 27, 2008
PPN203 AOC SUBMITTED 5/22/08 BY LIFT-TECH LTD CERT # 419-001 · disposed May 27, 2008
CW · disposed Dec 10, 2007
CAW AMENDED ROUND 6 REPORT WAS SUBMITTED AND APPROVED · disposed Jul 23, 2008
LL1081 DEVICE 1P42915 NEW EA#602/03 SIGN-OFF 2/15/2006 · disposed May 30, 2007
PPN203 AOC SUBMITTED ON 05/24/2007 BY LIFT-TECH LTD. CERT#419-001 · disposed May 28, 2007
PPN203 AOC SUBMITTED ON 05/17/2007 BY LIFT-TECHELEVATOR. CERT#419-001 · disposed May 17, 2007
PPN203 AOC SUBMITTED ON 05/17/2007 BY LIFT-TECHLTD. CERT#419-001 · disposed May 17, 2007
PPN203 AOC SUBMITTED ON 7/26/06 BY UNITED ELEV.CERT. #271-009 · disposed Jul 27, 2006
PPN203 AOC SUBMITTED ON 6/27/06 BY UNITED ELEV.CERT. #271-009 · disposed Jun 27, 2006
PPN203 AOC SUBMITTED ON 040604 BY ADMIRAL ELEV CORP.CERT#L116-001 · disposed Apr 6, 2004
PPN203 AOC SUBMITTED ON 040604 BY ADMIRAL ELEV CORP.CERT#L116-001 · disposed Apr 6, 2004
CIAMTH ADM. DISM. DEVICE WAS NEVER REMOVED SURVEY CONDUCTED ON 3/19/04 #641- · disposed Apr 7, 2004
1P17908
AS PER INSPECTORS ROUTE SHEET · disposed Aug 21, 2003
1P17911
AS PER INSPECTORS ROUTE SHEET · disposed Aug 21, 2003
1P17909
AS PER INSPECTORS ROUTE SHEET · disposed Aug 21, 2003
1P17909
AS PER INSPECTOR ROUTE SHEET · disposed Aug 6, 2002
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES. EXP1 EAST ELEVATION CRACKS RECURRING AT WINDOW LINTELS AT VARIOUS FLOORS AND DAMAGED FACADE AT 1ST FLOOR.EXP4 DEFECTIVE WINDOW AT UPPER FLOO
Penalty: $1,250 · paid: $1,593
AT THE TIME OF INSPECTION, I OBSERVED THAT THE REQUIRED SIDE WALK SHED PLANS AND OTHER RELATED DOCUMENTS WERE NOT PRESENTED UPON REQUEST.. PROVIDE AND MAINTAIN SIDEWALK SHED PLANS, PRE & POST INSTALLATION LET
AT THE TIME OF INSPECTION, I OBSERVED THAT ONE WINSAFE OUTRIGGER BEAM IN USE WAS NOT PERPENDICULAR TO THE WALL; UPON FURTHER INSPECTION, I OBSERVED THAT THAT THERE WAS NO OPPOSING TIE-BACK LINE INSTALLED. STOP
AT THE TIME OF INSPECTION, I OBSERVED THAT NO OVERHEAD PROTECTION WAS PROVIDED FOR A PUBLIC COURTYARD; ENTRY/EXIT DOOR AND WALKWAY EXPO#3. STOP ALL USE OF SUSPENDED SCAFFOLD OVER COURTYARD/ENTRY/EXIT DOOR/WALKW
AT THE TIME OF INSPECTION, I OBSERVED A HIGH SUPPORTED SCAFFOLD SITTING ON TOP OF THE SIDEWALK SHED EXPO #1&4; UPON ASKING, NO LOADS IMPOSED LETTER WAS PRODUCED. STOP ALL USE OF SUPPORTED SCAFFOLD OR WORK ON TO
AT THE TIME OF INSPECTION, I OBSERVED SEVERAL TUBULAR OUTRIGGER BEAMS INSTALLED AND IN USE; UPON ASKING, NO MANUFACTURERS SPECIFICATION, CUT-SHEET OR SHOP DRAWINGS WAS PROVIDED ON SITE. STOP ALL USE OF TUBULAR
AT THE TIME OF INSPECTION, I OBSERVED A DEBRIS CHUTE INSTALLED AT EXPO#4 BY THE SIDEWALK SHED; UPON FURTHER INSPECTION, I OBSERVED THAT THE CHUTE WAS NOT ISOLATED WITH A SOLID BARRIER TO PROTECT PEDESTRIANS. ST
AT THE TIME OF INSPECTION, I OBSERVED THAT THE SIDEWALK SHED EXPO#4 IS MISSING INTERIOR LATERAL BRACING PER APPROVED PLANS: STOP ALL WORK ON THE TOP OF THE SIDE WALK SHED EXPO#4.. INSTALL AND MAINTAIN ALL MISSI
OBSERVED SUSPENDED SCAFFOLD IN USE @ EXP#3 ABOVE 2ND FLOOR SETBACK WHICH DID NOT HAVE ADEQUATE ROOF/ SETBACK PROTECTION AS ONLY APPROX 8FT OF PROTECTIO PROVIDED NOT THE 20FT PER CODE, STOP ALL EXTERIOR WORK @ E
OBSERVED SUPPORTED SCAFFOLD AT EXP.#4 HAD SUPPORT STRUCTURE CONSISTING OF STEEL FRAMES (2) RESTING ON LOWER SIDEWALK SHED, UPON REVIEWING THE APPROVED SUPPORTED SCAFFOLD DRAWINGS THIS ON-SITE CONDITION WAS NOT
OBSERVED SIDEWALK SHED IN PLACE AT EXP.#1 & 4, WHICH HAD SUPPORTED SCAFFOLDING ERECTED ABOVE SHED WITH 3 MATERIAL HOISTS SET UP ON THE SCAFFOLD, UPON REQUEST TO REVIEW THE APPROVED S.W.S DRAWINGS AND MANU. SPEC
AT THE TIME OF INSPECTION OF A 16 STORY BUILDING, I OBSERVE STORAGE ZONE AT EXPOSURE #4 MISSING NETTING AND SOLID ENCLOSED 4FT BARRIERS WHICH IS REQUIRED BY CODE. THERE IS A 25 FT DUMPSTER INCLUDING MATERIALS S
Penalty: $2,500 · paid: $2,500
SEC. 3307.6.5.2 THE UNDERSIDE OF A SIDEWALK SHED SHALL BE LIGHTED AT ALL TIMES EITHER BY NATURAL OR ARTIFICIAL LIGHT. NOTED: AT TIME OF INSPECTION NO WORKING LIGHTS ON SIDEWALK SHED ON EXP #1 & EXP #4.
Penalty: $2,400 · paid: $2,400
FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION.NOTED:APPROVED PLANS FOR SUPPORTED SCAFFOLD OVER 40FT HIGH INSTALLED ON EXP.#1 & 4 NOT AVAILABLE AT TIME OF INSPECTION UPON REQUEST.R
Penalty: $500 · paid: $500
"STOP ALL WORK".FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING - NOTED:THERE IS A SIDEWALK SHED W/SUPPORTED SCAFFOLD ON IT.THERE IS AN EXCESS OF MATERIAL & DEBRIS ON SHED LIMITING WALKWAYS CLEARANCE.REMEDY:MAINTAIN
Penalty: $400 · paid: $400
"STOP ALL WORK".INADEQUATE SAFETY MEASURES:OPERATION OF HOISTWAY EQUIPMENT IN UNSAFE MANNER.NOTED:THERE IS OUTRIGGER BEAMS ARE SET UP ON SITE.THE LIFE LINES & THE BACKS ARE ON SAME WRAP AROUND BULKHEADS.THE WRA
Penalty: $4,800 · paid: $4,800
"STOP ALL WORK".WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTTS AND/OR APPROVED AMENDMENTS.NOTED:UPON INSPECTION OF RIGGING THE ROOF PLAN DOES NOT MATCH,THE PLACING OF THE OUTRIGGER BEAMS DON'T MATCH
"STOP ALL WORK".NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED BY AUTHORIZED PERSON AT SITE.NOTED:THERE ARE MEN WORKING ON SUSPENDED SCAFFOLD AT SITE.THERE IS NO RECORD OF DAILY INSPECTION AVAIL
1. LICENSED RIGGER FAILED TO NAME A DESIGNATED FOREMAN. NO DESIGNATED FOREMAN ID. 2. LICENSED RIGGER FAILED TO ENSURE THAT THE SCAFFOLD WORKERS NET MINIMUM REQUIREMENTS. NO CERTIFICATES OF FITNESS. REMEDY: OBTA
Penalty: $2,000 · paid: $2,000
FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAE 11/98 REPORT. REMEDY: FILE AN AMENDED REPORT FOLLOWING REMEDIAL REPA
Penalty: $700 · paid: $700
02B10.40M07.84M07. 02 ALARM BELL NOT RINGING LOUDLY 40 MACHINE ROOM DOOR MISSING PROVIDE 84 STRAIGHT LADDER IN MACHINE ROOM MISSING PROVIDE
Penalty: $350 · paid: $350
38O02.10H11.84X10.41G011.58E01.40T07.59Q03.55Y10.51M07.39O02.64L11.15M07. 84X INTERCOM INOPERATIVE 41G PROVIDE PROPER AMPS (FUSES) 55Y HOIST MACHINE OILED REPAIR SEAL & CLEAN 51M X Y/W SPINOUT
Penalty: $350 · paid: $350
SEC 27-1046(E)(3) THREE WORKERS ON ONE TWO POINT SUSPENSION SCAFFOLD AT ONE TIME APPROVED PLANS NOT AVAILABLE FOR INSPECTION.
Penalty: $750 · paid: $750
02L10,84L10,86U15. 84-L-10 REPAIR EMERGENCY PHONE.
HAVING A PROHIBITED SIGN ON A SIDEWALK SHED. NOTED:SHED ERECTED UNDER PERMIT #101498719 HAS SIGNAGE AT EAST & SOUTH AREAS. REMEDY: REMOVE SIGNAGE.
NO PERMIT POSTED:NOTED PERMIT #101498719 NOT POSTED AT TIME OF INSPECTION. REMEDY:POST PERMIT.
HAVING INSTALLED SIDEWALK SHED APPROX. 100FT IN LENGTH WITHOUT PERMITS. REMEDY: REMOVE SHED/OR OBTAIN A PERMIT.
FAILURE TO PROVIDE CONTRACTORS SIGN ON SHED. REMEDY:PROVIDE CONTRACTORS SIGN ON SHED.
Penalty: $5,000 · paid: $5,000
FAILURE TO POST PERMIT HOLDER SIGN AS REQUIRED BY ADMIN. CODE. REMEDY:POST SIGN AS REQUIRED.
HAVING INSTALLED SIGNAGE W/O A PERMIT. REMEDY: REMOVE ILLEGAL WORK
HAVING INSTALLED SIGNAGE ON A SIDEWALK SHED W/A HEIGHT EXCEEDING 3FT -6 INCES. SIGNAGE ON SHED IS APPROX. 8-12 FT IN HEIGHT. REMEDY: REMOVE ILLEGAL SIGNAGE.
FAILURE TO MAINTAIN EXTERIOR BLDG. NOTED; AT REAR FACADE OF 145 HUDSON ST OF OR ABOUT 15TH FL, VENCER OF CEMENT APPROX. 12" X 12" BECAME DISLODGED AND FELL TO PREMISES KNOWN AS 3 HUBERT ST AND STRUCK ONE OF THE
Penalty: $800 · paid: $800
FAILURE TO OBTAIN PROPER PERMIT CSS FOR OUTRIGGER BEAM. (CD-5 PERMIT EXPIRED 7.18.04) REMEDY: OBTAIN VAILD CDS PERMIT
Penalty: $250 · paid: $250
FAILURE TO PROVIDE PROPER EXIT DISCHARGE NOTE:AT REAR OF BLDG (WEST WALL).AT ABOUT 2ND FLOOR,EXHAUST SYSTEM DISCHARGING ONTO ADJACENT PROPERTY (7 HUBERT ST).REMEDY:PROVIDE PROPER EXIT DISCHARGE AS PER THE N.Y.C
Penalty: $200 · paid: $200
HAVING A MECHANICAL EQUIPMENT (FAN)SUPPORTED BY THE BLDG WHICH PROJECTS MORE THAN 2 FEET BEYOND THE STREET LINE-AT REAR OF 145 HUDSON ST ONTO 7 HUBERT ST COURTYARD.REMEDY:REMOVE ILLEGAL WORK
Penalty: $200 · paid: $200
52 03 19 31 36 M M M M M 07 P 07 07 07 52 M 07 PROVIDE COVER FOR WIRE LEND HOIST MOTOR ( 03 MP ) 31 M 07 PROVIDE COMMUNICATION IN CAB 19M07 MISSING COVERS ON INTERLECTS COVERS TOP OF CO
Penalty: $350 · paid: $350
52 42 81 37 05 O M U R M 02 07 05 09 07 42 M 07 PROVIDE COVER FOR SWITCH ON GOVERNOR 37-R-09 REMOVE WOOD FROM MOTOR ROOM 05M07 PROVIDE MISSING DOOR LOCK COVERS WHERE MISSING
Penalty: $350 · paid: $350
03 48 16 29 03 61 M M B 0 11 07 ( 03 M 07) PROVIDE MISSING CAPACITY PLATE (48 M 07 MISSING TAG) 16 8 01 ADJUST CLOSERS WHERE NESS ( 03 L11) REPAIR COMMUNICATION
Penalty: $350 · paid: $350
81 52 42 79 37 03 26 19 16 48 42 16 R Q M O D L M M M T T M 05 03 07 02 09 07 11 07 07 07 07 07 07 07 ( 42 M 070 PROVIDE MISSING COVER TO GOVERNING SWITCH) 37 D 09 REMOVE OLD TUBING FORM METER ROOM WALL ( 03 L
Penalty: $350 · paid: $350
73/X/11 35/D/06 73-RESTORE TO SERVICE 35-PROVIDE LADDER TO MOTOR-ROOM AND SECURE
Penalty: $180 · paid: $180
37/A/09 53/B/07 60/J/01 63/J/01 37 -REMOVE ALLICATOR CLIPS ON SELECTOR 53-PROVIDE SUFFICIENT LIGHTING AROUND MACHINE SPACE 60 PROVIDE PROPER COUNTERWEIGHT CLEARANCE BETWEEN CWT AND BUFFER 63 PROVIDE PROPER TENS
Penalty: $180 · paid: $180
WORK WITHOUT PERMIT EXPIRED PERMIT NOTED WORK IN PROGRESS WUTH THE FOLLOWING PERMITS EXPIRED 1 ALT 2 101491976 DT 4/97 EXPIRED 4/1/99 2-ALT 2 101566556 DT 11/98EXPIRED 4/1/99 3-ALT 1 1007770836 AT 1/99 EXPIRED
75U,51B,35V,35L,46D,31Q,30O,03O, 75-5 YEAR TEST 51-PROPER COTTER PINS IN BRAKE ARMS 35-CUT RODS THROUGH FLOOR IN M.R 35-PROPER STAIRS TO M.R 46=PROPER SPIN OUTS ON CAR AND CWT 31-COVERS WHERE NEEDED 03-CLEAN
Penalty: $350 · paid: $350
75U,46Q,37R,50Y,15F,30O,57O,03O,62O,29O, 75-5 YEAR TEST 46-ROPE GUARD ON MACHNIE 37-JUMPERS ON DISPATCHER 15-MAKE HATCH DOORS SELF CLOSING 03-CLEASN TOP OF CAR
Penalty: $350 · paid: $350
75U,50Y,47O,15F,30O,57Q,03O,62O,29O, 75-5 YEAR TEST 15-MAKE HATCH DOOR SELF CLOSING 03-CLEAN TOP OF CAR.
Penalty: $350 · paid: $350
37L5I,6L. 37 REPLACE CONTACTS.
37L,5I,6L. 37 REPAIR CONTACTS.
OCCUPANCEY CONTRARTY TO DEPARTMENT RECORDS C OF O # 16,083 DATE 020130FROM : FACTORY : OFFICES *1- LAWOFFICE 2- TRANS -IMAGE. REMEY: OBTAIN A VALID CERTIFICATE OF OCCUPANCY DISCONTINAL
OCCUPANCY CONTRARY TO DEPARTMENT RECORDS C OF O 16,083 DATED 02/01/30FROM; FACTORY TO: OFFICES * 1 MIRA MAXFILMS 2-AFE 1RM
Penalty: $800 · paid: $800
FAILURE TO MAINTAIN INTERIOR-CREATING A HAZARDOUS CONDITION. NOTED: THE REQUIRED FIRE RATED DOORS AT CENTER/REAR EGRESS STAIRS FROM CELLARTO LOBBYHAVE BEEN REMOVED. LOCATION-CENTER/REAR CELLAR STAIRS.
Penalty: $800 · paid: $800
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 145 HUDSON STREET, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.