1913 Woolworth Building, converted, 33 residences across 61 floors.
2 Park Place, 10007
ALSO KNOWN AS The Woolworth Building
The Woolworth Tower Residences occupy the top thirty floors of Cass Gilbert's Woolworth Building of 1913, converted under the design direction of Thierry Despont. There are 33 apartments in the tower, above the office floors that remain in the base.
The conversion is inside a landmark, so the envelope was restored rather than replaced. About 3,500 pieces of terracotta were recast from the original moulds by the successor to the firm that made them, and the windows were retrofitted within the existing arched openings rather than swapped for a modern system.
That is what shapes the interiors. The openings are arched and they are the historic ones, so the head of every window is a curve fixed by the facade and not by the plan. Ceilings run to twenty two feet in places. Between the two, anything at the perimeter is drawn to an arched head at a height most stock systems do not reach, and a treatment detailed for a square opening has nowhere to sit.
The floors are solid oak laid in herringbone, which is a finish that can be sanded and refinished in place rather than lifted.
Within walking distance
Building facts
Built
1913
Last altered
1990
Floors
61
Residences
33
Landmark
Yes
New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1001237501.
Public records show 233 BROADWAY was built in 1913 and rises 61 floors with 31 residential units (NYC MapPLUTO, version 26v2). This building is an interior landmark, designated Apr 11, 1983 by the Landmarks Preservation Commission (NYC Open Data). This lot falls within the No, designated Apr 11, 1983 by the Landmarks Preservation Commission (NYC Open Data). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Last altered
1990
Total units
91
Landmark
Woolworth Building (Interior)
Historic district
No
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1001237501. Violations and permits as of October 27, 2026.
44 filings in the last 24 months, 5 open violations, last filing Aug 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)
Filed estimated cost: $1,200 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR FISHKIN LUCKS
Filed estimated cost: $220,650 (as filed, not verified)
SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)
Filed estimated cost: $51,500 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)
Filed estimated cost: $8,000 (as filed, not verified)
SPRINKLER WORK HEREWITH BEING FILED IN CONJUNCTION WITH AN ALTERATION APPLICATION FOR AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR BLUEPRINT 2026
Filed estimated cost: $10,500 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR BLUEPRINT 2026
Filed estimated cost: $25,000 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 18TH FLOOR (SUITES 1860 / 1870) PRE-BUILT SPACE
Filed estimated cost: $20,000 (as filed, not verified)
Mechanical work in existing commercial space on the 18th floor.
Filed estimated cost: $10,000 (as filed, not verified)
Prop. sub-division & int. renovation of existing office space on the 18th flr with rearrangement & reconstruction of non-bearing int. partitions, int. wall, floor & ceiling finishes Elect. work per plans. No change to building bulk, use or occupancy
Filed estimated cost: $26,550 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SPODEK LAW FIRM)
Filed estimated cost: $20,000 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITES 701/707)
Filed estimated cost: $20,000 (as filed, not verified)
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
Filed estimated cost: 0 (as filed, not verified)
SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR (RISA HELLER SPACE)
Filed estimated cost: $77,500 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR (RISA HELLER SPACE)
Filed estimated cost: $30,000 (as filed, not verified)
PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR (RISA HELLER SPACE)
Filed estimated cost: $2,400 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR RISA HELLER SPACE
Filed estimated cost: $434,250 (as filed, not verified)
PROPOSED INTERIOR RENOVATION OF EXISTING OFFICE SPACE @ 14TH FLR WITH REARRANGEMENT & RECONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, INTERIOR WALL, FLOOR AND CEILING FINISHES. ELECTRICAL WORK PER PLANS. NO CHANGE TO BUILDING BULK, EGRESS, USE OR OCC.
Filed estimated cost: $80,600 (as filed, not verified)
Install new HVAC equipment and new ductwork with existing equipment. Remove existing ducts where indicated on the 14th floor as per plans filed. No change in use, egress or occupancy.
Filed estimated cost: $16,265 (as filed, not verified)
SPRINKLER SCOPE OF WORK IN CONJUNCTION WITH OFFICE RENOVATION PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $4,500 (as filed, not verified)
ASSOCIATED DUCTS AND PIPING WORK IN CONJUNCTION WITH OFFICE RENOVATION PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $21,000 (as filed, not verified)
PLUMBING SCOPE OF WORK IN CONJUNCTION WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $4,500 (as filed, not verified)
INTERIOR RENOVATION CONSISTING OF DEMOLITION AND CONSTRUCTION OFNON-LOAD BEARING PARTITIONS & LIGHTING. NO CHANGE IN USE, EGRESSOR OCCUPANCY.
Filed estimated cost: $115,000 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)
Filed estimated cost: $10,000 (as filed, not verified)
SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)
Filed estimated cost: $9,900 (as filed, not verified)
PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)
Filed estimated cost: $2,400 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)
Filed estimated cost: $41,500 (as filed, not verified)
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE ROOF PROTECTION AT THE WEST NEIGHBOR ROOF WITH NETTING OVER THE MECHANICAL UNITS.
Filed estimated cost: $1,000 (as filed, not verified)
PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)
Filed estimated cost: $1,200 (as filed, not verified)
SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)
Filed estimated cost: $32,700 (as filed, not verified)
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)
Filed estimated cost: $20,000 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 23RD FLOOR (SUITE 2360)
Filed estimated cost: $27,400 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)
Filed estimated cost: $113,250 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITES 701/707)
Filed estimated cost: $126,650 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SPODEK LAW FIRM)
Filed estimated cost: $174,300 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 18TH FLOOR (SUITES 1860 / 1870) PRE-BUILT SPACE
Filed estimated cost: $233,500 (as filed, not verified)
Suspended Scaffold Rigging Equipment as per plans filed herewith.
Filed estimated cost: 0 (as filed, not verified)
PROPOSED INTERIOR RENOVATION TO COMBINE TWO APARTMENTS WITH MINOR PARTITIONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $56,000 (as filed, not verified)
Facade restoration to to floors 1st through 52nd floor as shown on drawings filed herewith. No change to use, egress, or occupancy
Filed estimated cost: $750,000 (as filed, not verified)
Facade restoration to to floors 1st through 52nd floor as shown on drawings filed herewith. No change to use, egress, or occupancy
Filed estimated cost: $750,000 (as filed, not verified)
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Filed estimated cost: $1 (as filed, not verified)
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Filed estimated cost: $1 (as filed, not verified)
Suspended Scaffold Rigging Equipment as per plans filed herewith.
Filed estimated cost: 0 (as filed, not verified)
PROPOSED INTERIOR RENOVATION TO COMBINE TWO APARTMENTS WITH MINOR PARTITIONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $56,000 (as filed, not verified)
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Filed estimated cost: $1 (as filed, not verified)
NEW PLUMBING FIXTURES FOR NEW COMMERCIAL KITCHEN AT FIRST FLOOR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER M00977498-I1.
Filed estimated cost: $15,500 (as filed, not verified)
INTERIOR RENOVATION IN EX. 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN HOOD. NEW INLINE EXHAUST FAN. INSTALLING (3) INDOOR REFRIGERATION CONDENSERS IN THE COMMERCIAL SPACE. REPLACE HEAT PUMP. PLUMBING WORK TO BE FILED SUBSEQUENTLY.
Filed estimated cost: $132,750 (as filed, not verified)
INTERIOR RENOVATION IN EX. 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN HOOD. NEW INLINE EXHAUST FAN. INSTALLING (3) INDOOR REFRIGERATION CONDENSERS IN THE COMMERCIAL SPACE. REPLACE HEAT PUMP. PLUMBING WORK TO BE FILED SUBSEQUENTLY.
Filed estimated cost: $132,750 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Recorded documents
ACRIS · NYC Department of Finance
Party 2: CITIZENS ICON HOLDINGS, LLC
Party 1: MACQUARIE NEW YORK PARKING 2 LLC
Party 2: CITIZENS ICON HOLDINGS, LLC
Party 1: MACQUARIE NEW YORK PARKING 2 LLC
ACRIS document ID: 2014102201022001 · Search ACRIS
ACRIS real property records, NYC Department of Finance via NYC Open Data. As of October 27, 2026.
HPD maintenance complaints
HPD · NYC Open Data
The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.
HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
FAILURE TO CORRECT SWARMP CONDITIONS
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
CYCLE 9C UNSAFE REPORT FILED
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
PD 6/7/23 INV#62394815 · disposed Jun 6, 2023
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
PD 6/7/23 INV#62394814 · disposed Jun 6, 2023
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
PD 6/7/23 INV#6239413 · disposed Jun 6, 2023
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
PD 6/7/23 INV#62394812 · disposed Jun 6, 2023
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
PD 6/7/23 INV#62394811 · disposed Jun 6, 2023
PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022
PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022
PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022
PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022
038001 PVT AOC SUBMITTED BY KONE INC. JUSTIN M.TOMASINO CERT#038001 · disposed Mar 24, 2022
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
RBG PAID INVOICE 62152020 · disposed Dec 25, 2019
PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022
PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSU BRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019
PPN203 AOC SUB ON 9/26/19 BY:KONE THOMAS COUTU, CERT#038058 · disposed Oct 2, 2019
PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSU BRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019
PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSULBRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019
PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSU BRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019
VIOLATION COMPLIED WITH · disposed Dec 10, 2018
VIOLATION COMPLIED WITH · disposed Dec 11, 2018
PPN203 AOC SUB ON 9/5/19 BY:KONE INC. THOMAS COUTU, CERT#038058 · disposed Sep 15, 2019
PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018
PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018
PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018
PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CAT1 2016 AOC FAILURE TO FILE,PENALTY FEE PAID. · disposed Apr 16, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CAT1 2016 AOC FAILURE TO FILE,PENALTY FEE PAID · disposed Apr 16, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CAT1 2016 AOC LATE FILING,PENALTY FEE PAID. · disposed Apr 16, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CAT1 2016 AOC FAILURE TO FILE,PENALTY FEE PAID. · disposed Apr 16, 2018
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DDY INV#13321239 · disposed Jan 7, 2018
OKAY TO DISMISS. COMPLIED WITH VIOLATION · disposed Sep 25, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT 1 2016 CAT 1 FILED · disposed Nov 27, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT 1 CAT 1 FILED · disposed Nov 27, 2017
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CAT 1 CAT 1 FILE D · disposed Nov 27, 2017
DUE TO VEHICLE IMPACT
OK TO DISMISS BASED ON PE RPT DATED 12.2.17 · disposed Dec 11, 2017
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016)
PD INV#61873762 · disposed Aug 9, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
JMA UNDER EBN 1385/14 · disposed Aug 22, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
JMA ISSUED IN ERROR - 2015 CAT 1 RESULTED IN A SATISFACTORY INPECTION · disposed Aug 22, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 EBN#2130/14 SO/1000215#2467 · disposed Dec 18, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Jun 5, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
ACC1 EBN1385/14SO/060816#2467 · disposed Feb 9, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
JMA UNDER EBN 1385/14 · disposed Aug 22, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
CAT 1 2015 AOC, PAID LATE FEE · disposed Jun 5, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
ACC1 2015 AOC PENALTY PAID · disposed Jan 29, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
ACC1 EBN1385/14SO/060816#2467 · disposed Feb 9, 2017
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
JMA 2015 AOC PERFORMED 1-5-17 PENALTY PAID INV#61926812 · disposed Jan 17, 2018
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
ACC1 EBN1385/14SO/060816#2467 · disposed Feb 9, 2017
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.
ECB violations
Environmental Control Board · NYC Open Data
B6C-SECTION 11-62.FAILURE TO COMPLY W/ CONDITIONS & RESTRICTIONS IN SPECIAL PERMIT.(C01031125M) FOLLOWING ITEMS NOT CONSISTENT W/ APPROVED PLANS A-RIGHT SIDE OF BARCLAY ST OVERHEAD DOOR.FIRE DOOR BUILT IS NOT
Penalty: $2,500 · paid: $2,500
FAILURE TO MAINTAIN EXTERIOR AND APPURTENANCES. NOTE: AT TIME OF ISNPECT I OBSERBED SPALLED/DAMAGED COATING AT APX 43RD AND 45TH FLOOR AT EXPOSURE #4 NORTH ELEVATION. REMEDY: MAINTAIN EXTERIOR FACADE AND APPURT
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT .NOTED AT THE TIME OF INSPECTION SWS ERECTED ON EXPOSURE 1 UNDERSIDE NOT ILLUMINATED AS REQUIRED BY CODE-BC.3307.6.4.8.THIS CREATES HAZARDOUS CONDITIONS FOR PEDESTRI
FAILED TO INSTITUTE SAFETY MEASURES. NO GUARDRAILS AT TIME OF INSPECTION ON A 57 STORY ACTIVE JOB SITE I OBSERVED INADEQUATE GUARDRAILS. NO MEANS OF FALL PROTECTION AT EXP4 ROOF. GLASS PARTITIONS IN PLACE WERE
Penalty: $2,500 · paid: $2,500
FAILURE TO MAINTAIN SAFE OPERATION.NOTE:AT THE TIME OF MY INSPECTION, RESPONDING TO COMPLAINT#1491449, WHERE SITE SAFETY MANAGER REPORTED,THAT,WHILE WORKERS WORKING ON THE FACADE AT EXPOSURE 3,CUTTING MOTOR JOI
Penalty: $5,000 · paid: $5,000
100##. 100## FAILURE TO REPORT AN ELEVATOR ACCIDENT PROMPTLY ACCIDENT OCCURED THURSDAY 11/16/17 @ APPROX 4 PM WITH DAMAGE TO PROPERTY IN EXCESS OF 100$.
Penalty: $1,000 · paid: $1,019
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS INCIDENT CALLED INTO BEST SQUAD #24977:NOTED ELECTRICIANS WERE TAKING A SPOOL OF ELECTRICAL CABLE ROLLED OUT INTO THE BARRICADES
Penalty: $10,000 · paid: $10,000
MODEL APARTMENT AT THE TIME OF MY INSPECTION OF A 58 STORY BUILDING, CONSTRUCTION OPERATION IN PROGRESS FROM 29 TO 58 FLOOR. I OBSERVED AT 38TH FLOOR TWO MODEL APT COMPLETED AND FURNISHED.UPON REQUEST FOR PERMI
Penalty: $800 · paid: $800
3301.1.2 FAILURE TO COMPLY WITH NYC FIRE CODE-GENERAL NO CERTIFICATE OF FITNESS. NOTE:AT THE TIME OF MY INSPECTION OF A 58 STORY BUILDING,C ONSTRUCTION OPERATION IN PROGRESS FROM 29-58FL.I OBSERVED 2 WORKERS TO
Penalty: $400 · paid: $400
SITE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPT OF CONDITIONS AS REQUIRED. A WORKER FELL AND WAS INJURED ON HIS TUESDAY (12-27-16)SHIFT. THIS INCIDENT WAS NOT REPORTED TO THE DOB UNTIL THURS (12-29-16
FAILURE TO SAFEGUARD ALL PERSONS,PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AT TIME OF INSPECTION,WORKERS WERE UNLOADING A PIECE OF STELL OFF OF AN A FRAME DOLLY.WHEN UNLOADING THE STEEL,THE WORKER
Penalty: $10,000 · paid: $10,177
BC3317.2 WORK W/O PERMIT. INSTALLATION AND USE OF POWER-OPERATED HOIST OF GREATER THAN 1 TON. AT THE TIME OF MY INSPECTION I OBSERVED AT THE 58TH FLR OF THE TOWER UNDER ALTERATION, A POWER-OPERATED HOIST THAT
BC3314.2 WORK W/O A PERMIT. INSTALLATION/USE OF SUPPORTED SCAFFOLD TOWER FOR FLOOR ACCESS:AT THE TIME OF MY INSPECTION OF THE EXISTING BUILDING UNDER ALTERATION, I OBSERVED A PIPED STAIR TOWER OVER PLATFORMS FR
FAILURE TO NOTIFY THE DOB WITHIN 24 TO 48 HRS OF THE START OF EXCAVATION.@ THE TIME OF EXCAVATION,EXCAVATION WAS DONE @ THE SUB CELLAR FOR THE ELEVATOR PIT CONSTRUCTION & THE DOB WAS NOT NOTIFIED OF THE START O
Penalty: $1,200 · paid: $1,200
SITE SAFETY MANAGER NOT ON DUTY AT TIME OF INSPECTION. NOTED: JOINT INSPECTIONS FROM 11:30 AM TO 1:35 PM - NO SITE SAFETY ON SITE. STOP ALL WORK ON SCAFFOLD EXCEPT&TO PROVIDE SAFETY.CONTACT SST FOR REINSPECTION
Penalty: $1,200 · paid: $1,200
SEC. BC 3310.8.3. SITE SAFETY MANAGER - FULL TIME FAILED TO (KEEP) ADEQUATE LOG BOOK. NOTED: LAST ENTRY IN LOG BOOK DATED 7.1.13. WORK WAS IN PROGRESS ON 7/2, 7/3 & 7/8. PICTURES OF SAFETY LOG FILED. WITNESSES
Penalty: $400 · paid: $400
ACTIVITY W/O REGUL LICENSE.NOTED: WELDING OPERATION IN PROGRESS AT 28 FLOOR AT THE TIME OF INSPECTION.NO ONE WELDER CAN PROVIDE LICENSE. REMEDY:DISCONTINUE ACTIVITY AND/OR OBTAIN LICENSE AS REQUIRED.28-401.4
ACTIVITY W/O LEGAL LICENSE.NOTED:WELDING OPERATION IN PROGRESS AT 23-TAPE @ TIME OF INSPECTION.NO ONE WELDER CAN PROVIDE LICENSE. REM:DISCONTINUE ACTIVITY AND/OR OBTAIN LICENSE AS REQUIRED.
FAILURE TO SAFE GUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS UPON INSP UNDER PERMIT #104848088 CONTRACTOR FAILED TO PROVIDE FIRE RATING BTWN OCCUPIED FLOORS AND FLOORS UNDER PARTIAL DEMOLI
Penalty: $1,200 · paid: $1,200
28-104.7.7)FAILURE TO FILE TRI FORM & DESIGNATE OPERATIONS.SUBJECT TO CONTROLLED INSPECTIONS.(SPECIAL INSPECTION)ON PLANS PRIOR TO COMMENCEMENT OF WORK UNDER CONTROLLED INSPECTION.(SPECIAL INSPEC).NOTED:UPON IN
Penalty: $400 · paid: $400
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTED:UPON INSPECTION STANDPIPE ON CONSTRUCTION FLR ACTIVE & AREAS OF PIPE NOT PAINTED RED.REM:SAFEGUARD PUBLIC & PROPERTY.PAINT
Penalty: $400 · paid: $400
FAILURE TO PROVIDE 3'6" GUARDRAILS OR EQUIVALENT AROUND ALL FLR OPENINGS.NOTED:UPON INSPECTION GUARDRAILS ON 29FL CABLES LOOSE/WEAK.MID RAIL MISSING ON 55 FL GUARDRAILS.NO TOE BOARDS,CABLE LOOSE.REM:COMPLY W/ N
33I10. 33I- TILLER ROPE- END OF CUT (SAFETY) FRAYED,KINKED,DAMAGED
Penalty: $1,000 · paid: $1,408
79B12. 79B- RESHACKLE COMP ROPES COUNTERWEIGHT
WORK W/O A PERMIT NOTE 2 CONT 7 ENLES ERECTED @ EXP (4)(1) APPROX 10'-0" HIGH HAVE NO PERMIT AND OTHER 12'-0" HIGH REM: OBTAIN PERMIT OR RESTORE LEGAL CONDITION
Penalty: $400 · paid: $400
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT STAIRCASE "A" 31ST FLOOR DUCT WORK INSTALLED DECREASING WIDTH OF STAIRS & CAUSING A HAZARDOUS CONDITION. REMEDY: REMOVE OBSTRUCTION.
Penalty: $6,000
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES - NO GUARD RAILS, FAILURE TO PROVIDE HAND RAILS. UNSAFE WORK CONDITIONS OBSERVED ON THE 1ST FLR AND 29TH FLR AND ABOVE. STOP ALL WORK AT 1ST FLR & 29TH
98BB05,100M07,40O02,02B01.98BB05-EXPIRED FIVE YEAR TEST TAG TO( ) GOVERNORS.PERFORM & FILE TEST.100M07-OVERHEAD MACHINE ROOM STOP SWITCHMISSING PROVIDE.
Penalty: $2,500 · paid: $500
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR AMENDMENTSNOTED APPROVED CD-5 ON SITE SHOWS USE OF OUTRIGGER BEAMS ONLY & AT EXPOSURE 34 THERE IS 1 C-HOOK & 1 OUTRIGGER BEEN BEING USED FOR 1 PLATFOR
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR APPROVED AMENDMENTS. NOTED SUPPORTED SCAFFOLD AT EXPOSURE # 1 IS 2' WIDE WITH NO OUTRIGGER BEAMS APPROVED PLANS SHOW 3'WIDE WITH OUTRIGGER BEAMS.
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT OR APPROVED OR APPROVED AMENDMENTS. NOTED APPROVED PLANS ON SITE ARE BSA TYPICAL SHOWING 42 INCH PARAPET. PARAPET IS APPROX 78 INCH HIGH. REMEDY: CONFORM
Penalty: $2,500 · paid: $500
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER DUE TO CLOGGED DRAIN ON THE 27TH FLR WATER FROM MELTING SNOW HAS BUILT UP & NOW HAS MOVE INTO OVERFLOW DRAIN & DUE TO FREEZING CONDITIONS HAS NOW CAUSED LAR
Penalty: $1,000 · paid: $1,000
40O02,40O02,52O02,73O02,74O02,71X10,67X10,02X10,01X10. 40 O CLEAN SECONDARY. 52O CLEAN FUZZ OFF ROPES. 02X REPAIR ALARM BELL. 01X REPAIR ALARM BELL ON STOP SW.
Penalty: $2,500 · paid: $500
40Z10.40I10.100L10. 40Z REPAIR ROOF IN M.R 40I REPAIR DAMAGED WALL IN M.R. 100 REPAIR CAB WALL IN CAR
Penalty: $2,500 · paid: $500
WORK W/O A PERMIT. EXPIRED PERMIT WORK NOTED: PARTIAL DEMOLITION WORK IN PROGRESS ON 30TH THRU 40TH FLR. PERMIT #104848088 EXPIRED ON 5-10-08. REMEDY: STOP ALL WORK + RENEW PERMIT.
85BB05. 85BB05 5YR TEST EXP.4/2003
Penalty: $350 · paid: $563
85BB05. 85BB05 5YR TEST EXP. 4/2003
Penalty: $350 · paid: $563
STANDPIPE CONNECTION DOES NOT MEET BLDG CODE SPECIFICATIONS DURING INSPECTION OF ALT #104125643 ON FLOOR 48 STANDPIPE IS FOUND TO BE INACCESSIBLE AT TIME OF INSPECTION (STADDLED BETWEEN 2 OPEN/EXPOSED AREAS
Penalty: $1,000 · paid: $1,000
NO ELEVATOR IN READINESS:DURING INSPECTION OF ALT #104125643 ON FLOORS47-58 NO ELEVATOR ARE BEING SUPPLIED TO THESE UPPER FLOORS DURING CON STRUCTION OPERATION.REMEDY:STOP ALL WORK.SUPPLY ELEVATOR IN READINESS.
Penalty: $1,000 · paid: $1,000
FAILURE TO SAFEGUARD PUBLIC EFFECTED BY CONSTRUCTION OPERATION.NOTED:WHILE ERECTED SIDEWALK SHED ALONG PARK PL (INSTALLING CORRUGATED METAL SHEETS) PERDESTRAINS WHERE ALLOWED TO WALK UNDER WORK AREA.AT TIME OF
Penalty: $1,000 · paid: $1,000
1 - HAVING INSTALLED A SIGN W/O A PERMIT REMEDY : REMOVE ILLEGAL WORK
(1) HAING SIGNAGE WITH A SURFACE AREA GREATER THAN 200 SQ FEET REMEDY : REMOVE ILLEGAL SIGNAGE
HAVING A PROHIBITED SIGN ON A SIDE WALK SHED REMEDY : REMOVE ILLEGAL WORK
HAVING INSTALLED A SIGN WITHOUT A PERMIT. REMEDY: REMOVE ILLEGAL WORK
HAVING, PROHIBITED ADVERTISING SIGNAGE IN A C5-3 DISTRICT. REMEDY: REMOVE ILLEGAL SIGNAGE
HAVING A PROHIBITED SIGN ON A ASIDEWALK SHED. REMEDY: REMOVE ILLEGAL WORK.
(1) HAVING SIGNAGE WITH A SURFACE AREA GREATER THAN 200 SQ FT. REMEDY: REMOVE ILLEGAL SIGNAGE
HAVING PROHIBITED ADVERTISING SIGNAGE IN A C 5 - 3 DISTRICT REMEDY : REMOVE ILLEGAL SIGNAGE
46 K 46- RENEW HOST ROPES
75 U 75-PERFORM & FILE TEST
ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.
Certificates of occupancy
DOB · NYC Open Data
DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.
What are you trying to do here?
Public records for 233 BROADWAY, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.