← Buildings

The Woolworth Tower Residences

1913 Woolworth Building, converted, 33 residences across 61 floors.

2 Park Place, 10007

ALSO KNOWN AS The Woolworth Building

The Woolworth Tower Residences, facade
© NYCID, all rights reserved

The Woolworth Tower Residences occupy the top thirty floors of Cass Gilbert's Woolworth Building of 1913, converted under the design direction of Thierry Despont. There are 33 apartments in the tower, above the office floors that remain in the base.

The conversion is inside a landmark, so the envelope was restored rather than replaced. About 3,500 pieces of terracotta were recast from the original moulds by the successor to the firm that made them, and the windows were retrofitted within the existing arched openings rather than swapped for a modern system.

That is what shapes the interiors. The openings are arched and they are the historic ones, so the head of every window is a curve fixed by the facade and not by the plan. Ceilings run to twenty two feet in places. Between the two, anything at the perimeter is drawn to an arched head at a height most stock systems do not reach, and a treatment detailed for a square opening has nowhere to sit.

The floors are solid oak laid in herringbone, which is a finish that can be sanded and refinished in place rather than lifted.

Within walking distance

598 mGalerie 56 · gallery
658 mSuperhouse · gallery
700 mTwenty First Gallery · gallery
760 mOrtuzar Projects · gallery
776 mR & Company · gallery
778 mGRIMM · gallery

Building facts

Built

1913

Last altered

1990

Floors

61

Residences

33

Landmark

Yes

New York City Primary Land Use Tax Lot Output, version 26v1. Tax lot 1001237501.

Public records show 233 BROADWAY was built in 1913 and rises 61 floors with 31 residential units (NYC MapPLUTO, version 26v2). This building is an interior landmark, designated Apr 11, 1983 by the Landmarks Preservation Commission (NYC Open Data). This lot falls within the No, designated Apr 11, 1983 by the Landmarks Preservation Commission (NYC Open Data). No HPD violations are recorded for this lot (NYC Open Data, as of October 27, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).

Public record

Last altered

1990

Total units

91

Landmark

Woolworth Building (Interior)

Historic district

No

Total permits

50 or more

NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1001237501. Violations and permits as of October 27, 2026.

44 filings in the last 24 months, 5 open violations, last filing Aug 2026

The record

Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.

DOB NOW filings from June 2016.

PlumbingFiled by ACCESS PLUMBING CORPlic. 002229Permit Issued · Aug 13, 2026 · job M01394074-S1

PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)

Filed estimated cost: $1,200 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Permit Issued · Aug 12, 2026 · job M01394074-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR FISHKIN LUCKS

Filed estimated cost: $220,650 (as filed, not verified)

SprinklersFiled by FIREQUEST CORPlic. 001076Permit Issued · Aug 12, 2026 · job M01394074-S3

SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)

Filed estimated cost: $51,500 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Permit Issued · Aug 11, 2026 · job M01394074-S2

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)

Filed estimated cost: $8,000 (as filed, not verified)

SprinklersFiled by FIREQUEST CORPlic. 001076Permit Issued · Jul 6, 2026 · job M01405533-S1

SPRINKLER WORK HEREWITH BEING FILED IN CONJUNCTION WITH AN ALTERATION APPLICATION FOR AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR BLUEPRINT 2026

Filed estimated cost: $10,500 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Jun 29, 2026 · job M01405533-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR BLUEPRINT 2026

Filed estimated cost: $25,000 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · May 21, 2026 · job M01103963-S1

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 18TH FLOOR (SUITES 1860 / 1870) PRE-BUILT SPACE

Filed estimated cost: $20,000 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Permit Issued · May 10, 2026 · job M01394883-S1

Mechanical work in existing commercial space on the 18th floor.

Filed estimated cost: $10,000 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · May 4, 2026 · job M01394883-I1

Prop. sub-division & int. renovation of existing office space on the 18th flr with rearrangement & reconstruction of non-bearing int. partitions, int. wall, floor & ceiling finishes Elect. work per plans. No change to building bulk, use or occupancy

Filed estimated cost: $26,550 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Apr 30, 2026 · job M01102109-S1

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SPODEK LAW FIRM)

Filed estimated cost: $20,000 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Apr 29, 2026 · job M01103387-S1

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITES 701/707)

Filed estimated cost: $20,000 (as filed, not verified)

Suspended ScaffoldFiled by CENTRAL CONSTRUCTION MGMTlic. 006591Permit Issued · Feb 10, 2026 · job M01356538-I1

INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.

Filed estimated cost: 0 (as filed, not verified)

SprinklersFiled by FIREQUEST CORPlic. 001076Signed-off · Dec 1, 2025 · job M01305167-S3

SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR (RISA HELLER SPACE)

Filed estimated cost: $77,500 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Dec 1, 2025 · job M01305167-S2

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR (RISA HELLER SPACE)

Filed estimated cost: $30,000 (as filed, not verified)

PlumbingFiled by ACCESS PLUMBING CORPlic. 002229Signed-off · Dec 1, 2025 · job M01305167-S1

PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR (RISA HELLER SPACE)

Filed estimated cost: $2,400 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Nov 17, 2025 · job M01305167-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 22ND FLOOR RISA HELLER SPACE

Filed estimated cost: $434,250 (as filed, not verified)

General ConstructionFiled by ON-TRAC CONSTRUCTION ASSOlic. 604784Signed-off · Aug 17, 2025 · job M01260639-I1

PROPOSED INTERIOR RENOVATION OF EXISTING OFFICE SPACE @ 14TH FLR WITH REARRANGEMENT & RECONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, INTERIOR WALL, FLOOR AND CEILING FINISHES. ELECTRICAL WORK PER PLANS. NO CHANGE TO BUILDING BULK, EGRESS, USE OR OCC.

Filed estimated cost: $80,600 (as filed, not verified)

Mechanical SystemsFiled by ON-TRAC CONSTRUCTION ASSOlic. 604784Signed-off · Aug 17, 2025 · job M01260639-S1

Install new HVAC equipment and new ductwork with existing equipment. Remove existing ducts where indicated on the 14th floor as per plans filed. No change in use, egress or occupancy.

Filed estimated cost: $16,265 (as filed, not verified)

SprinklersFiled by EAST MEADOW PLBG & MECHlic. 000444Signed-off · Jul 10, 2025 · job M01227160-I1

SPRINKLER SCOPE OF WORK IN CONJUNCTION WITH OFFICE RENOVATION PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $4,500 (as filed, not verified)

Mechanical SystemsFiled by ON-TRAC CONSTRUCTION ASSOlic. 604784Signed-off · Jul 9, 2025 · job M01227143-I1

ASSOCIATED DUCTS AND PIPING WORK IN CONJUNCTION WITH OFFICE RENOVATION PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $21,000 (as filed, not verified)

PlumbingFiled by EAST MEADOW PLBG & MECHlic. 001331Signed-off · Jul 9, 2025 · job M01227149-I1

PLUMBING SCOPE OF WORK IN CONJUNCTION WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

Filed estimated cost: $4,500 (as filed, not verified)

General ConstructionFiled by ON-TRAC CONSTRUCTION ASSOlic. 604784Signed-off · Jul 9, 2025 · job M01227123-I1

INTERIOR RENOVATION CONSISTING OF DEMOLITION AND CONSTRUCTION OFNON-LOAD BEARING PARTITIONS & LIGHTING. NO CHANGE IN USE, EGRESSOR OCCUPANCY.

Filed estimated cost: $115,000 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Jul 2, 2025 · job M01228908-S1

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)

Filed estimated cost: $10,000 (as filed, not verified)

SprinklersFiled by FIREQUEST CORPlic. 001076Signed-off · Jul 2, 2025 · job M01228908-S3

SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)

Filed estimated cost: $9,900 (as filed, not verified)

PlumbingFiled by WNW & SONS PLBG & HTG INClic. 002053Signed-off · Jul 2, 2025 · job M01228908-S2

PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)

Filed estimated cost: $2,400 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Jun 24, 2025 · job M01228908-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (SUITE 1720)

Filed estimated cost: $41,500 (as filed, not verified)

Protection and Mechanical MethodsFiled by SPRING SCAFFOLDING LLClic. 607447Signed-off · Apr 1, 2025 · job M01003639-S1

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE ROOF PROTECTION AT THE WEST NEIGHBOR ROOF WITH NETTING OVER THE MECHANICAL UNITS.

Filed estimated cost: $1,000 (as filed, not verified)

PlumbingFiled by WNW & SONS PLBG & HTG INClic. 002053Signed-off · Mar 30, 2025 · job M01188307-S2

PLUMBING WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)

Filed estimated cost: $1,200 (as filed, not verified)

SprinklersFiled by FIREQUEST CORPlic. 001076Signed-off · Mar 26, 2025 · job M01188307-S3

SPRINKLER WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)

Filed estimated cost: $32,700 (as filed, not verified)

Mechanical SystemsFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Mar 26, 2025 · job M01188307-S1

MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)

Filed estimated cost: $20,000 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Mar 25, 2025 · job M01189503-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 23RD FLOOR (SUITE 2360)

Filed estimated cost: $27,400 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Mar 25, 2025 · job M01188307-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITE 712)

Filed estimated cost: $113,250 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Permit Issued · Nov 26, 2024 · job M01103387-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SUITES 701/707)

Filed estimated cost: $126,650 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Permit Issued · Nov 26, 2024 · job M01102109-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 7TH FLOOR (SPODEK LAW FIRM)

Filed estimated cost: $174,300 (as filed, not verified)

General ConstructionFiled by CAMMEBY'S MNGMT COMPANYlic. 622605Signed-off · Nov 26, 2024 · job M01103963-I1

INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE 18TH FLOOR (SUITES 1860 / 1870) PRE-BUILT SPACE

Filed estimated cost: $233,500 (as filed, not verified)

Suspended ScaffoldFiled by WESTERN WATERPROOFING COMlic. 005797Permit Issued · Aug 27, 2024 · job M00818047-S1

Suspended Scaffold Rigging Equipment as per plans filed herewith.

Filed estimated cost: 0 (as filed, not verified)

General ConstructionFiled by HATCHET WORKS CORPlic. 613262Permit Issued · Apr 15, 2024 · job M01019938-I1

PROPOSED INTERIOR RENOVATION TO COMBINE TWO APARTMENTS WITH MINOR PARTITIONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $56,000 (as filed, not verified)

General ConstructionFiled by WESTERN WATERPROOFING COMlic. 005797Signed-off · Apr 1, 2024 · job M00818047-I1

Facade restoration to to floors 1st through 52nd floor as shown on drawings filed herewith. No change to use, egress, or occupancy

Filed estimated cost: $750,000 (as filed, not verified)

General ConstructionFiled by WESTERN WATERPROOFING COMlic. 005797Signed-off · Apr 1, 2024 · job M00818047-I1

Facade restoration to to floors 1st through 52nd floor as shown on drawings filed herewith. No change to use, egress, or occupancy

Filed estimated cost: $750,000 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Permit Issued · Feb 13, 2024 · job M01003639-I1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Permit Issued · Feb 13, 2024 · job M01003639-I1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Permit Issued · Feb 13, 2024 · job M01003639-I1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Permit Issued · Feb 13, 2024 · job M01003639-I1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY

Filed estimated cost: $1 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Permit Issued · Feb 13, 2024 · job M01003639-I1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY

Filed estimated cost: $1 (as filed, not verified)

6 earlier filings, 2023–2024
Suspended ScaffoldFiled by WESTERN WATERPROOFING COMlic. 005797Permit Issued · Aug 27, 2024 · job M00818047-S1

Suspended Scaffold Rigging Equipment as per plans filed herewith.

Filed estimated cost: 0 (as filed, not verified)

General ConstructionFiled by HATCHET WORKS CORPlic. 613262Permit Issued · Apr 15, 2024 · job M01019938-I1

PROPOSED INTERIOR RENOVATION TO COMBINE TWO APARTMENTS WITH MINOR PARTITIONS AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Filed estimated cost: $56,000 (as filed, not verified)

Sidewalk ShedFiled by SPRING SCAFFOLDING LLClic. 607447Permit Issued · Feb 13, 2024 · job M01003639-I1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY

Filed estimated cost: $1 (as filed, not verified)

PlumbingFiled by KATAN P & H INClic. 001669Signed-off · Jan 28, 2024 · job M00977498-S1

NEW PLUMBING FIXTURES FOR NEW COMMERCIAL KITCHEN AT FIRST FLOOR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER M00977498-I1.

Filed estimated cost: $15,500 (as filed, not verified)

General ConstructionFiled by SHAM CONSTRUCTION GROUPlic. 617322Permit Issued · Dec 19, 2023 · job M00977498-I1

INTERIOR RENOVATION IN EX. 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN HOOD. NEW INLINE EXHAUST FAN. INSTALLING (3) INDOOR REFRIGERATION CONDENSERS IN THE COMMERCIAL SPACE. REPLACE HEAT PUMP. PLUMBING WORK TO BE FILED SUBSEQUENTLY.

Filed estimated cost: $132,750 (as filed, not verified)

Mechanical SystemsFiled by SHAM CONSTRUCTION GROUPlic. 617322Permit Issued · Dec 19, 2023 · job M00977498-I1

INTERIOR RENOVATION IN EX. 1ST FLOOR COMMERCIAL SPACE. PROPOSED NEW COMMERCIAL KITCHEN HOOD. NEW INLINE EXHAUST FAN. INSTALLING (3) INDOOR REFRIGERATION CONDENSERS IN THE COMMERCIAL SPACE. REPLACE HEAT PUMP. PLUMBING WORK TO BE FILED SUBSEQUENTLY.

Filed estimated cost: $132,750 (as filed, not verified)

Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.

Recorded documents

ACRIS · NYC Department of Finance

NYC REAL PROPERTY TRANSFER TAX$69,852,905 recorded amount as filedSep 29, 2014 · crfn 2014000379421

Party 2: CITIZENS ICON HOLDINGS, LLC

Party 1: MACQUARIE NEW YORK PARKING 2 LLC

Party 2: CITIZENS ICON HOLDINGS, LLC

Party 1: MACQUARIE NEW YORK PARKING 2 LLC

ACRIS document ID: 2014102201022001 · Search ACRIS

ACRIS real property records, NYC Department of Finance via NYC Open Data. As of October 27, 2026.

HPD maintenance complaints

HPD · NYC Open Data

PLUMBING — WATER SUPPLYCLOSE · Mar 16, 2017

The Department of Housing Preservation and Development inspected the following conditions. No violations were issued. The complaint has been closed.

HPD Maintenance Code Complaints (ygpa-z7cr), NYC Open Data. As of October 27, 2026.

Pre-2016 DOB filings

DOB legacy · NYC Open Data

50 A2 filings1995–2017

DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 27, 2026.

DOB legacy violations

DOB BIS · NYC Open Data

FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED — V-DOB VIOLATION - ACTIVEJul 31, 2024

FAILURE TO CORRECT SWARMP CONDITIONS

EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE — V-DOB VIOLATION - ACTIVEMar 31, 2024

FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED — V-DOB VIOLATION - ACTIVEFeb 20, 2024

CYCLE 9C UNSAFE REPORT FILED

EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE — V-DOB VIOLATION - ACTIVEAug 15, 2023

FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

46 resolved, most recent Jun 6, 2023
EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDApr 21, 2023

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

PD 6/7/23 INV#62394815 · disposed Jun 6, 2023

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDJun 19, 2021

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)

PD 6/7/23 INV#62394814 · disposed Jun 6, 2023

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDJun 18, 2021

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)

PD 6/7/23 INV#6239413 · disposed Jun 6, 2023

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDJun 17, 2021

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)

PD 6/7/23 INV#62394812 · disposed Jun 6, 2023

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDJun 16, 2021

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)

PD 6/7/23 INV#62394811 · disposed Jun 6, 2023

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 2, 2020

PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 2, 2020

PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 2, 2020

PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 2, 2020

PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 2, 2020

038001 PVT AOC SUBMITTED BY KONE INC. JUSTIN M.TOMASINO CERT#038001 · disposed Mar 24, 2022

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDMay 28, 2019

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

RBG PAID INVOICE 62152020 · disposed Dec 25, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 6, 2019

PPN203 AOC SUB 03/01/2022 BY ELEV MANAGEMENT CERT 479001 BRUCE GRIFFITH · disposed Mar 7, 2022

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 6, 2019

PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSU BRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 5, 2019

PPN203 AOC SUB ON 9/26/19 BY:KONE THOMAS COUTU, CERT#038058 · disposed Oct 2, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 5, 2019

PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSU BRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 5, 2019

PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSULBRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 5, 2019

PPN203 AOC SUB ON 5/30/19 BY:ELEV. MGMT.&CONSU BRUCE GRIFFITH, CERT#479001 · disposed Jun 4, 2019

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDNov 26, 2018

VIOLATION COMPLIED WITH · disposed Dec 10, 2018

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDNov 26, 2018

VIOLATION COMPLIED WITH · disposed Dec 11, 2018

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedApr 23, 2018

PPN203 AOC SUB ON 9/5/19 BY:KONE INC. THOMAS COUTU, CERT#038058 · disposed Sep 15, 2019

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 4, 2018

PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 4, 2018

PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 4, 2018

PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018

E-ELEVATOR ELEVATORREQUIRED — V*-DOB VIOLATION - ResolvedMar 4, 2018

PPN203 AOC SUB ON 04/11/18 BY:SCHINDLER ELEV. PETER HYDE, CERT#074126 · disposed Apr 25, 2018

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

CAT1 2016 AOC FAILURE TO FILE,PENALTY FEE PAID. · disposed Apr 16, 2018

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

CAT1 2016 AOC FAILURE TO FILE,PENALTY FEE PAID · disposed Apr 16, 2018

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

CAT1 2016 AOC LATE FILING,PENALTY FEE PAID. · disposed Apr 16, 2018

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 25, 2018

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

CAT1 2016 AOC FAILURE TO FILE,PENALTY FEE PAID. · disposed Apr 16, 2018

AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE — V*-DOB VIOLATION - DISMISSEDDec 26, 2017

FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

DDY INV#13321239 · disposed Jan 7, 2018

C-CONSTRUCTION OTHER OPTIONAL — VP*-VIOLATION UNSERVED ECB- DISMISSEDSep 24, 2017

OKAY TO DISMISS. COMPLIED WITH VIOLATION · disposed Sep 25, 2017

EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDSep 14, 2017

VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST

CAT 1 2016 CAT 1 FILED · disposed Nov 27, 2017

EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDSep 14, 2017

VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST

CAT 1 CAT 1 FILED · disposed Nov 27, 2017

EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDSep 14, 2017

VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST

CAT 1 CAT 1 FILE D · disposed Nov 27, 2017

C-CONSTRUCTION OTHER OPTIONAL — V*-DOB VIOLATION - DISMISSEDAug 24, 2017

DUE TO VEHICLE IMPACT

OK TO DISMISS BASED ON PE RPT DATED 12.2.17 · disposed Dec 11, 2017

EARCX-FAILURE TO SUBMIT EER NONE — V*-DOB VIOLATION - DISMISSEDFeb 15, 2017

FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016)

PD INV#61873762 · disposed Aug 9, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

JMA UNDER EBN 1385/14 · disposed Aug 22, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

JMA ISSUED IN ERROR - 2015 CAT 1 RESULTED IN A SATISFACTORY INPECTION · disposed Aug 22, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

CAT 1 EBN#2130/14 SO/1000215#2467 · disposed Dec 18, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

CAT 1 2015 AOC, PAID LATE FEE · disposed Jun 5, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

ACC1 EBN1385/14SO/060816#2467 · disposed Feb 9, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

JMA UNDER EBN 1385/14 · disposed Aug 22, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

CAT 1 2015 AOC, PAID LATE FEE · disposed Jun 5, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

ACC1 2015 AOC PENALTY PAID · disposed Jan 29, 2018

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

ACC1 EBN1385/14SO/060816#2467 · disposed Feb 9, 2017

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDJan 2, 2017

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

JMA 2015 AOC PERFORMED 1-5-17 PENALTY PAID INV#61926812 · disposed Jan 17, 2018

ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED — V*-DOB VIOLATION - DISMISSEDNov 13, 2016

VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

ACC1 EBN1385/14SO/060816#2467 · disposed Feb 9, 2017

DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 27, 2026.

ECB violations

Environmental Control Board · NYC Open Data

Zoning — HazardousACTIVE · Apr 24, 2007

B6C-SECTION 11-62.FAILURE TO COMPLY W/ CONDITIONS & RESTRICTIONS IN SPECIAL PERMIT.(C01031125M) FOLLOWING ITEMS NOT CONSISTENT W/ APPROVED PLANS A-RIGHT SIDE OF BARCLAY ST OVERHEAD DOOR.FIRE DOOR BUILT IS NOT

Penalty: $2,500 · paid: $2,500

49 resolved, most recent Aug 23, 2026
Construction — CLASS - 2RESOLVE · Aug 23, 2026

FAILURE TO MAINTAIN EXTERIOR AND APPURTENANCES. NOTE: AT TIME OF ISNPECT I OBSERBED SPALLED/DAMAGED COATING AT APX 43RD AND 45TH FLOOR AT EXPOSURE #4 NORTH ELEVATION. REMEDY: MAINTAIN EXTERIOR FACADE AND APPURT

Construction — CLASS - 2RESOLVE · Dec 4, 2025

PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT .NOTED AT THE TIME OF INSPECTION SWS ERECTED ON EXPOSURE 1 UNDERSIDE NOT ILLUMINATED AS REQUIRED BY CODE-BC.3307.6.4.8.THIS CREATES HAZARDOUS CONDITIONS FOR PEDESTRI

Construction — CLASS - 1RESOLVE · Nov 26, 2018

FAILED TO INSTITUTE SAFETY MEASURES. NO GUARDRAILS AT TIME OF INSPECTION ON A 57 STORY ACTIVE JOB SITE I OBSERVED INADEQUATE GUARDRAILS. NO MEANS OF FALL PROTECTION AT EXP4 ROOF. GLASS PARTITIONS IN PLACE WERE

Penalty: $2,500 · paid: $2,500

Construction — CLASS - 2RESOLVE · Oct 2, 2018

FAILURE TO MAINTAIN SAFE OPERATION.NOTE:AT THE TIME OF MY INSPECTION, RESPONDING TO COMPLAINT#1491449, WHERE SITE SAFETY MANAGER REPORTED,THAT,WHILE WORKERS WORKING ON THE FACADE AT EXPOSURE 3,CUTTING MOTOR JOI

Penalty: $5,000 · paid: $5,000

Elevators — CLASS - 1RESOLVE · Nov 20, 2017

100##. 100## FAILURE TO REPORT AN ELEVATOR ACCIDENT PROMPTLY ACCIDENT OCCURED THURSDAY 11/16/17 @ APPROX 4 PM WITH DAMAGE TO PROPERTY IN EXCESS OF 100$.

Penalty: $1,000 · paid: $1,019

Construction — CLASS - 1RESOLVE · Nov 7, 2017

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS INCIDENT CALLED INTO BEST SQUAD #24977:NOTED ELECTRICIANS WERE TAKING A SPOOL OF ELECTRICAL CABLE ROLLED OUT INTO THE BARRICADES

Penalty: $10,000 · paid: $10,000

Construction — CLASS - 1RESOLVE · Sep 24, 2017

MODEL APARTMENT AT THE TIME OF MY INSPECTION OF A 58 STORY BUILDING, CONSTRUCTION OPERATION IN PROGRESS FROM 29 TO 58 FLOOR. I OBSERVED AT 38TH FLOOR TWO MODEL APT COMPLETED AND FURNISHED.UPON REQUEST FOR PERMI

Penalty: $800 · paid: $800

Construction — CLASS - 1RESOLVE · Sep 24, 2017

3301.1.2 FAILURE TO COMPLY WITH NYC FIRE CODE-GENERAL NO CERTIFICATE OF FITNESS. NOTE:AT THE TIME OF MY INSPECTION OF A 58 STORY BUILDING,C ONSTRUCTION OPERATION IN PROGRESS FROM 29-58FL.I OBSERVED 2 WORKERS TO

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · Dec 28, 2016

SITE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPT OF CONDITIONS AS REQUIRED. A WORKER FELL AND WAS INJURED ON HIS TUESDAY (12-27-16)SHIFT. THIS INCIDENT WAS NOT REPORTED TO THE DOB UNTIL THURS (12-29-16

Construction — CLASS - 1RESOLVE · Sep 6, 2016

FAILURE TO SAFEGUARD ALL PERSONS,PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AT TIME OF INSPECTION,WORKERS WERE UNLOADING A PIECE OF STELL OFF OF AN A FRAME DOLLY.WHEN UNLOADING THE STEEL,THE WORKER

Penalty: $10,000 · paid: $10,177

Construction — CLASS - 1RESOLVE · May 12, 2016

BC3317.2 WORK W/O PERMIT. INSTALLATION AND USE OF POWER-OPERATED HOIST OF GREATER THAN 1 TON. AT THE TIME OF MY INSPECTION I OBSERVED AT THE 58TH FLR OF THE TOWER UNDER ALTERATION, A POWER-OPERATED HOIST THAT

Construction — CLASS - 1RESOLVE · May 12, 2016

BC3314.2 WORK W/O A PERMIT. INSTALLATION/USE OF SUPPORTED SCAFFOLD TOWER FOR FLOOR ACCESS:AT THE TIME OF MY INSPECTION OF THE EXISTING BUILDING UNDER ALTERATION, I OBSERVED A PIPED STAIR TOWER OVER PLATFORMS FR

Construction — CLASS - 1RESOLVE · Apr 7, 2014

FAILURE TO NOTIFY THE DOB WITHIN 24 TO 48 HRS OF THE START OF EXCAVATION.@ THE TIME OF EXCAVATION,EXCAVATION WAS DONE @ THE SUB CELLAR FOR THE ELEVATOR PIT CONSTRUCTION & THE DOB WAS NOT NOTIFIED OF THE START O

Penalty: $1,200 · paid: $1,200

Construction — CLASS - 1RESOLVE · Jul 7, 2013

SITE SAFETY MANAGER NOT ON DUTY AT TIME OF INSPECTION. NOTED: JOINT INSPECTIONS FROM 11:30 AM TO 1:35 PM - NO SITE SAFETY ON SITE. STOP ALL WORK ON SCAFFOLD EXCEPT&TO PROVIDE SAFETY.CONTACT SST FOR REINSPECTION

Penalty: $1,200 · paid: $1,200

Unknown — CLASS - 1RESOLVE · Jul 7, 2013

SEC. BC 3310.8.3. SITE SAFETY MANAGER - FULL TIME FAILED TO (KEEP) ADEQUATE LOG BOOK. NOTED: LAST ENTRY IN LOG BOOK DATED 7.1.13. WORK WAS IN PROGRESS ON 7/2, 7/3 & 7/8. PICTURES OF SAFETY LOG FILED. WITNESSES

Penalty: $400 · paid: $400

Unknown — CLASS - 1RESOLVE · Aug 20, 2012

ACTIVITY W/O REGUL LICENSE.NOTED: WELDING OPERATION IN PROGRESS AT 28 FLOOR AT THE TIME OF INSPECTION.NO ONE WELDER CAN PROVIDE LICENSE. REMEDY:DISCONTINUE ACTIVITY AND/OR OBTAIN LICENSE AS REQUIRED.28-401.4

Cranes and Derricks — CLASS - 1RESOLVE · Aug 20, 2012

ACTIVITY W/O LEGAL LICENSE.NOTED:WELDING OPERATION IN PROGRESS AT 23-TAPE @ TIME OF INSPECTION.NO ONE WELDER CAN PROVIDE LICENSE. REM:DISCONTINUE ACTIVITY AND/OR OBTAIN LICENSE AS REQUIRED.

Construction — CLASS - 2RESOLVE · Jan 25, 2011

FAILURE TO SAFE GUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS UPON INSP UNDER PERMIT #104848088 CONTRACTOR FAILED TO PROVIDE FIRE RATING BTWN OCCUPIED FLOORS AND FLOORS UNDER PARTIAL DEMOLI

Penalty: $1,200 · paid: $1,200

Unknown — CLASS - 2RESOLVE · Dec 13, 2010

28-104.7.7)FAILURE TO FILE TRI FORM & DESIGNATE OPERATIONS.SUBJECT TO CONTROLLED INSPECTIONS.(SPECIAL INSPECTION)ON PLANS PRIOR TO COMMENCEMENT OF WORK UNDER CONTROLLED INSPECTION.(SPECIAL INSPEC).NOTED:UPON IN

Penalty: $400 · paid: $400

Construction — CLASS - 2RESOLVE · Dec 13, 2010

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTED:UPON INSPECTION STANDPIPE ON CONSTRUCTION FLR ACTIVE & AREAS OF PIPE NOT PAINTED RED.REM:SAFEGUARD PUBLIC & PROPERTY.PAINT

Penalty: $400 · paid: $400

Unknown — CLASS - 2RESOLVE · Dec 13, 2010

FAILURE TO PROVIDE 3'6" GUARDRAILS OR EQUIVALENT AROUND ALL FLR OPENINGS.NOTED:UPON INSPECTION GUARDRAILS ON 29FL CABLES LOOSE/WEAK.MID RAIL MISSING ON 55 FL GUARDRAILS.NO TOE BOARDS,CABLE LOOSE.REM:COMPLY W/ N

Elevators — CLASS - 1RESOLVE · Nov 22, 2010

33I10. 33I- TILLER ROPE- END OF CUT (SAFETY) FRAYED,KINKED,DAMAGED

Penalty: $1,000 · paid: $1,408

Elevators — CLASS - 3RESOLVE · Jun 14, 2010

79B12. 79B- RESHACKLE COMP ROPES COUNTERWEIGHT

Construction — CLASS - 2RESOLVE · Aug 19, 2009

WORK W/O A PERMIT NOTE 2 CONT 7 ENLES ERECTED @ EXP (4)(1) APPROX 10'-0" HIGH HAVE NO PERMIT AND OTHER 12'-0" HIGH REM: OBTAIN PERMIT OR RESTORE LEGAL CONDITION

Penalty: $400 · paid: $400

Construction — CLASS - 1RESOLVE · Jun 21, 2009

FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT STAIRCASE "A" 31ST FLOOR DUCT WORK INSTALLED DECREASING WIDTH OF STAIRS & CAUSING A HAZARDOUS CONDITION. REMEDY: REMOVE OBSTRUCTION.

Penalty: $6,000

Construction — CLASS - 1RESOLVE · Jun 9, 2009

FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES - NO GUARD RAILS, FAILURE TO PROVIDE HAND RAILS. UNSAFE WORK CONDITIONS OBSERVED ON THE 1ST FLR AND 29TH FLR AND ABOVE. STOP ALL WORK AT 1ST FLR & 29TH

Elevators — CLASS - 2RESOLVE · Apr 5, 2009

98BB05,100M07,40O02,02B01.98BB05-EXPIRED FIVE YEAR TEST TAG TO( ) GOVERNORS.PERFORM & FILE TEST.100M07-OVERHEAD MACHINE ROOM STOP SWITCHMISSING PROVIDE.

Penalty: $2,500 · paid: $500

Construction — CLASS - 2RESOLVE · Feb 19, 2009

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR AMENDMENTSNOTED APPROVED CD-5 ON SITE SHOWS USE OF OUTRIGGER BEAMS ONLY & AT EXPOSURE 34 THERE IS 1 C-HOOK & 1 OUTRIGGER BEEN BEING USED FOR 1 PLATFOR

Construction — CLASS - 2RESOLVE · Feb 19, 2009

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR APPROVED AMENDMENTS. NOTED SUPPORTED SCAFFOLD AT EXPOSURE # 1 IS 2' WIDE WITH NO OUTRIGGER BEAMS APPROVED PLANS SHOW 3'WIDE WITH OUTRIGGER BEAMS.

Construction — CLASS - 2RESOLVE · Feb 19, 2009

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT OR APPROVED OR APPROVED AMENDMENTS. NOTED APPROVED PLANS ON SITE ARE BSA TYPICAL SHOWING 42 INCH PARAPET. PARAPET IS APPROX 78 INCH HIGH. REMEDY: CONFORM

Penalty: $2,500 · paid: $500

Construction — CLASS - 1RESOLVE · Dec 22, 2008

FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER DUE TO CLOGGED DRAIN ON THE 27TH FLR WATER FROM MELTING SNOW HAS BUILT UP & NOW HAS MOVE INTO OVERFLOW DRAIN & DUE TO FREEZING CONDITIONS HAS NOW CAUSED LAR

Penalty: $1,000 · paid: $1,000

Elevators — CLASS - 2RESOLVE · Oct 6, 2008

40O02,40O02,52O02,73O02,74O02,71X10,67X10,02X10,01X10. 40 O CLEAN SECONDARY. 52O CLEAN FUZZ OFF ROPES. 02X REPAIR ALARM BELL. 01X REPAIR ALARM BELL ON STOP SW.

Penalty: $2,500 · paid: $500

Elevators — CLASS - 2RESOLVE · Jul 14, 2008

40Z10.40I10.100L10. 40Z REPAIR ROOF IN M.R 40I REPAIR DAMAGED WALL IN M.R. 100 REPAIR CAB WALL IN CAR

Penalty: $2,500 · paid: $500

Construction — HazardousRESOLVE · May 21, 2008

WORK W/O A PERMIT. EXPIRED PERMIT WORK NOTED: PARTIAL DEMOLITION WORK IN PROGRESS ON 30TH THRU 40TH FLR. PERMIT #104848088 EXPIRED ON 5-10-08. REMEDY: STOP ALL WORK + RENEW PERMIT.

Elevators — HazardousRESOLVE · May 18, 2008

85BB05. 85BB05 5YR TEST EXP.4/2003

Penalty: $350 · paid: $563

Elevators — HazardousRESOLVE · May 18, 2008

85BB05. 85BB05 5YR TEST EXP. 4/2003

Penalty: $350 · paid: $563

Site Safety — HazardousRESOLVE · Jun 24, 2007

STANDPIPE CONNECTION DOES NOT MEET BLDG CODE SPECIFICATIONS DURING INSPECTION OF ALT #104125643 ON FLOOR 48 STANDPIPE IS FOUND TO BE INACCESSIBLE AT TIME OF INSPECTION (STADDLED BETWEEN 2 OPEN/EXPOSED AREAS

Penalty: $1,000 · paid: $1,000

Site Safety — Non-HazardousRESOLVE · Jun 24, 2007

NO ELEVATOR IN READINESS:DURING INSPECTION OF ALT #104125643 ON FLOORS47-58 NO ELEVATOR ARE BEING SUPPLIED TO THESE UPPER FLOORS DURING CON STRUCTION OPERATION.REMEDY:STOP ALL WORK.SUPPLY ELEVATOR IN READINESS.

Penalty: $1,000 · paid: $1,000

Construction — HazardousRESOLVE · Sep 29, 2003

FAILURE TO SAFEGUARD PUBLIC EFFECTED BY CONSTRUCTION OPERATION.NOTED:WHILE ERECTED SIDEWALK SHED ALONG PARK PL (INSTALLING CORRUGATED METAL SHEETS) PERDESTRAINS WHERE ALLOWED TO WALK UNDER WORK AREA.AT TIME OF

Penalty: $1,000 · paid: $1,000

Signs — Non-HazardousRESOLVE · Nov 20, 2002

1 - HAVING INSTALLED A SIGN W/O A PERMIT REMEDY : REMOVE ILLEGAL WORK

Signs — Non-HazardousRESOLVE · Nov 20, 2002

(1) HAING SIGNAGE WITH A SURFACE AREA GREATER THAN 200 SQ FEET REMEDY : REMOVE ILLEGAL SIGNAGE

Construction — Non-HazardousRESOLVE · Nov 20, 2002

HAVING A PROHIBITED SIGN ON A SIDE WALK SHED REMEDY : REMOVE ILLEGAL WORK

Signs — Non-HazardousRESOLVE · Nov 20, 2002

HAVING INSTALLED A SIGN WITHOUT A PERMIT. REMEDY: REMOVE ILLEGAL WORK

Signs — Non-HazardousRESOLVE · Nov 20, 2002

HAVING, PROHIBITED ADVERTISING SIGNAGE IN A C5-3 DISTRICT. REMEDY: REMOVE ILLEGAL SIGNAGE

Construction — Non-HazardousRESOLVE · Nov 20, 2002

HAVING A PROHIBITED SIGN ON A ASIDEWALK SHED. REMEDY: REMOVE ILLEGAL WORK.

Signs — Non-HazardousRESOLVE · Nov 20, 2002

(1) HAVING SIGNAGE WITH A SURFACE AREA GREATER THAN 200 SQ FT. REMEDY: REMOVE ILLEGAL SIGNAGE

Signs — Non-HazardousRESOLVE · Nov 20, 2002

HAVING PROHIBITED ADVERTISING SIGNAGE IN A C 5 - 3 DISTRICT REMEDY : REMOVE ILLEGAL SIGNAGE

Elevators — Non-HazardousRESOLVE · Mar 27, 1997

46 K 46- RENEW HOST ROPES

Elevators — Non-HazardousRESOLVE · Mar 27, 1997

75 U 75-PERFORM & FILE TEST

ECB Violations (6bgk-3dad), NYC Open Data. As of October 27, 2026.

Certificates of occupancy

DOB · NYC Open Data

FinalIssued · Jun 14, 2022 · DOB Legacy
22 earlier certificates
TemporaryIssued · Feb 1, 2021 · DOB Legacy
TemporaryIssued · Dec 1, 2020 · DOB Legacy
TemporaryIssued · Sep 9, 2020 · DOB Legacy
TemporaryIssued · Jun 18, 2020 · DOB Legacy
TemporaryIssued · Mar 26, 2020 · DOB Legacy
TemporaryIssued · Jan 8, 2020 · DOB Legacy
TemporaryIssued · Oct 17, 2019 · DOB Legacy
TemporaryIssued · Jul 24, 2019 · DOB Legacy
TemporaryIssued · Apr 28, 2019 · DOB Legacy
TemporaryIssued · Apr 16, 2019 · DOB Legacy
TemporaryIssued · Jan 17, 2019 · DOB Legacy
TemporaryIssued · Oct 24, 2018 · DOB Legacy
TemporaryIssued · Aug 29, 2018 · DOB Legacy
TemporaryIssued · Aug 27, 2018 · DOB Legacy
TemporaryIssued · Jun 25, 2018 · DOB Legacy
TemporaryIssued · Jun 17, 2018 · DOB Legacy
TemporaryIssued · Apr 19, 2018 · DOB Legacy
TemporaryIssued · Jan 4, 2018 · DOB Legacy
Renewal Without Change32 dwelling unitsCO Issued · Nov 3, 2021 · DOB NOW
Renewal Without Change32 dwelling unitsCO Issued · Aug 10, 2021 · DOB NOW
Final32 dwelling unitsCO Issued · Jun 15, 2022 · DOB NOW
Renewal Without Change32 dwelling unitsCO Issued · May 19, 2021 · DOB NOW

DOB NOW CofO (pkdm-hqz6) and DOB Legacy CofO (bs8b-p36w), NYC Open Data. As of October 27, 2026.

What are you trying to do here?

Public records for 233 BROADWAY, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 27, 2026.