979 Third Avenue
More than 100 trade showrooms on 17 floors. Open to the public, and buying requires a trade account.
979 Third Avenue, 10022
ALSO KNOWN AS The D&D Building
979 Third Avenue is the Decoration and Design Building, an office block of 1963 that has worked as a design centre since 1965. Seventeen floors hold more than a hundred showrooms, and between them they represent several thousand manufacturers. Fortuny took a suite when the building opened and is still in one.
What a designer or a homeowner can do here is set by the terms the showrooms trade on rather than by anything in the structure.
Those terms are narrower than the shorthand suggests. The lobby is open and most showrooms will let anyone walk in and look. What is restricted is buying. Prices are quoted net to designers and architects holding trade accounts, and there is no retail counter on any floor.
Three routes lead to an actual purchase. A designer with an account can order anything in the building. The building runs its own programme for people without one, where its design director consults on the project and a limited number of items can be bought at trade price plus a fee. A client already working with a designer can carry a letter on the practice's letterhead naming the date, the showrooms and what those showrooms should provide, which lets them visit unaccompanied. Not every showroom honours the third, so it is worth calling ahead.
What follows from this for a project is scheduling. Samples are pulled by showroom staff rather than taken off a rack, and a floor of textile houses cannot be worked through at the pace of a shop. Designers who use the building well arrive with the scheme settled and spend the visit on weight, hand and finish.
A single address holding a hundred showrooms removes travel from specification, which is the argument for it, and concentrates the trade in a way that makes an account the price of entry.
Who trades here
The showrooms and galleries in this building that the guide covers. Not the full tenant list.
Within walking distance
Public records show 979 3 AVENUE was built in 1963 and rises 17 floors (NYC MapPLUTO, version 26v2). No HPD violations are recorded for this lot (NYC Open Data, as of October 31, 2026). The Department of Buildings has 50 or more job filings on record for this lot (NYC Open Data).
Public record
Total units
200
Total permits
50 or more
NYC MapPLUTO 26v2, NYC Open Data. Tax lot 1013320001. Violations and permits as of October 31, 2026.
9 filings in the last 24 months, 35 open violations, last filing Jan 2026
The record
Permits and violations from the Department of Buildings and the Housing Preservation and Development, newest first.
DOB NOW filings from June 2016.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INTERIOR RENOVATION OF EXISTING OFFICES/SHOWROOM SPACES. WORK TO INCLUDE NON STRUCTURAL DEMOLITION, NEW PARTITIONS, NEW CEILINGS AND FLOOR FINISHES. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.
Filed estimated cost: $350,000 (as filed, not verified)
Interior renovations to the existing space
Filed estimated cost: $280,170 (as filed, not verified)
Modifications to existing sprinkler system on the 5th floor. No change to use, egress or occupancy.
Filed estimated cost: $12,000 (as filed, not verified)
Modification to existing HVAC system ductwork on the 5th floor. No change to use, egress or occupancy is involved.
Filed estimated cost: $12,000 (as filed, not verified)
REMOVAL OF CONVENIENCE STAIR AS PER PLANS VFILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
Filed estimated cost: $45,000 (as filed, not verified)
Renovation of existing suite # 508. Work includes removal and installation of non bearing partitions, doors, ceiling, floor and finishes. No change to use, egress or occupancy
Filed estimated cost: $420,000 (as filed, not verified)
Renovation of existing suite # 508. Work includes removal and installation of non bearing partitions, doors, ceiling, floor and finishes. No change to use, egress or occupancy
Filed estimated cost: $420,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
41 earlier filings, 2019–2024
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $28,000 (as filed, not verified)
THIS APPLICATION'S PROPOSED SCOPE OF WORK IS LIMITED TO THE MODIFICATION OF EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE PROPOSED BUILDING INTERIOR ALTERATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $20,000 (as filed, not verified)
FILING FOR REMOVAL OF EXISTING DUCTWORK, EQUIPMENT, ASSOCIATED PIPING,AIRSIDE DISTRIBUTION FROM TWO (2)NEW VRF EVAPORATOR UNITS AND CONDENSERS WITH ELECTRICAL RESISTIVE HEATING SYSTEMS.REFRIGERANT PIPING WILL ALSO BE INSTALLED PER THE SYSTEM REQUIREMENTS
Filed estimated cost: $40,000 (as filed, not verified)
FILING INTERIOR IMPROVEMENTS FOR A NEW RETAIL STORE. THE PROJECT INCLUDES WORK ON THE GROUND FLOOR OF AN EXISTING BUILDING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Filed estimated cost: $180,000 (as filed, not verified)
NEW RAISED CONCRETE FLOOR AND SUPPORT OF MECHANICAL UNITS. THERE IS NO CHANGE TO OCCUPANCY, USE, OR EGRESS.
Filed estimated cost: $24,000 (as filed, not verified)
Modifications to Existing Sprinkler System on Part of 9th Floor Related to Renovation of Existing Showroom/Office Space
Filed estimated cost: $8,000 (as filed, not verified)
Minor Demolition, Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes to Renovate Existing Showroom/Office on Part of 9th Floor. No Change to Occupancy, Use or Egress is Proposed
Filed estimated cost: $140,000 (as filed, not verified)
Modifications to Existing Air Conditioning Ductwork, Remove & Install Supply Air Diffusers & Registers and Return Air Grilles on Part of 9th Floor Related to Renovation of Existing Showroom/Office Space
Filed estimated cost: $10,000 (as filed, not verified)
STRUCTURAL SCOPE IN SUPPORT OF CORRIDOR OPENING BETWEEN 979 3RD AVE AND 222 E 59TH ST BUILDINGS AS PER PLANS FILED.
Filed estimated cost: $25,000 (as filed, not verified)
GC FOR CORRIDOR OPENING BETWEEN 979 3RD AVE AND 222 EAST 59TH STPER PLANS FILED. IN CONJUNCTION WITH JOB #M00936675-I1 . STRUCTURAL TO BE FILED AS SUBSEQUENT. RELATED RENOVATION SCOPE SP,PL,MH FILED SUBSEQUENTLY. NO CHANGE TO USE EGRESS NOR OCCUPANCY
Filed estimated cost: $30,000 (as filed, not verified)
DUCTWORK IS FILED IN CONJUNCTION WITH THE INTERIOR RENOVATION OF AN EXISTING SHOWROOM.
Filed estimated cost: $24,000 (as filed, not verified)
SPRINKLER WORK FILED IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING SHOWROOM. NEW INSTALLATION OF 22 HEADS, RELOCATION OF 12 HEADS, AND REMOVAL OF 4 HEADS.
Filed estimated cost: $20,026 (as filed, not verified)
Renovation of an existing showroom. New partitions and finishes. No change in use, occupancy or egress.
Filed estimated cost: $78,000 (as filed, not verified)
Renovation of an existing showroom. New partitions and finishes. No change in use, occupancy or egress.
Filed estimated cost: $78,000 (as filed, not verified)
RELOCATION OF 24 SPRINKLER HEADS, INSTALLATION OF 2 NEW HEADS AND RELATED PIPING AS SHOWN ON PLANS FILED,
Filed estimated cost: $22,000 (as filed, not verified)
Relocation of existing grills and associated duct-work, installation of return air grills and 5 new ceiling diffusers.
Filed estimated cost: $17,250 (as filed, not verified)
selective removal and construction of interior partitions, including lighting and millwork as shown in plan
Filed estimated cost: $75,000 (as filed, not verified)
installation, relocation, and removal of sprinkler heads as shown in plan
Filed estimated cost: $22,000 (as filed, not verified)
MINOR SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $20,000 (as filed, not verified)
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $20,010 (as filed, not verified)
PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $20,010 (as filed, not verified)
Installation of interior partitions ceilings and doors.
Filed estimated cost: $335,000 (as filed, not verified)
Installation of interior partitions ceilings and doors.
Filed estimated cost: $335,000 (as filed, not verified)
APPLICATION IS FILED FOR INTERIOR DEMOLITION TO NON LOAD BEARINGPARTITIONS AND RELATED FINISHES, AS PER PLANS . NO CHANGE IN USE, EGRESS,OCCUPANCY OR BULK.
Filed estimated cost: $50,000 (as filed, not verified)
installation of sprinkler fixtures along with related piping.
Filed estimated cost: $30,000 (as filed, not verified)
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACES, INCLUDING MINOR PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filed estimated cost: $64,200 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Filed estimated cost: $1,000 (as filed, not verified)
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE TO INCLUDE MINOR INTERIOR DEMOLITION, PARTITION AND CARPENTRY WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
Filed estimated cost: $50,000 (as filed, not verified)
Relocate existing continuous linear slot diffuser with (1) 1 slot (U.O.N.) based on Titus FL-10 HT. Provide 10Wx12H sound lined plenum for active sections. Provide soundlined transfer ducts through all new & existing full walls as shown on plans filed.
Filed estimated cost: $14,000 (as filed, not verified)
DEMOLITION OF INTERIOR PARTITIONS AND CEILING EXTENDING COMMON CORRIDOR AND CREATING A NEW DEMISED SHOWROOM AS SHOWN ON PLANS FILED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filed estimated cost: $160,000 (as filed, not verified)
EXTENSION OF AC DUCTWORK AND ASSOCIATED DIFFUSERS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $15,000 (as filed, not verified)
MINOR RENOVATIONS TO SUITE 813. DEMOLITION OF EXISTING NON-LOAD BEARING PARTITIONS. INSTALLATION OF NEW PARTITIONS. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY IS PROPOSED WITH THIS FILING.
Filed estimated cost: $60,000 (as filed, not verified)
RELOCATION OF EXISTING AND INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $8,000 (as filed, not verified)
RELOCATION OF EXISTING AND INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $12,600 (as filed, not verified)
EXTENSION OF AC DUCTWORK AND ASSOCIATED DIFFUSERS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $15,000 (as filed, not verified)
EXTENSION OF AC DUCTWORK AND ASSOCIATED DIFFUSERS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $15,000 (as filed, not verified)
EXTENSION OF AC DUCTWORK AND ASSOCIATED DIFFUSERS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $25,000 (as filed, not verified)
MECHANICAL WORK AS PER DRAWINGS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filed estimated cost: $40,000 (as filed, not verified)
sprinkler work per drawings; no change to use, egress or occupancy.
Filed estimated cost: $37,700 (as filed, not verified)
Source: NYC Department of Buildings and Housing Preservation and Development violations, via NYC Open Data.
Recorded documents
ACRIS · NYC Department of Finance
Party 1: CITIGROUP GLOBAL MARKETS REALTY CORP., A NEW YORK
1 individual party not shown
ACRIS document ID: 2015100801269002 · Search ACRIS
Party 1: CITIGROUP GLOBAL MARKETS REALTY CORP., A NEW YORK
1 individual party not shown
ACRIS document ID: 2015100801269001 · Search ACRIS
Party 2: WELLS FARGO BANK, N.A., AS TRUSTEE
Party 1: D&D BUILDING COMPANY, LLC
ACRIS document ID: 2015072300507001 · Search ACRIS
Party 1: WELLS FARGO BANK, N.A., AS TRUSTEE
Party 2: CITIGROUP GLOBAL MARKETS REALTY CORP.
ACRIS document ID: 2015072300507002 · Search ACRIS
Party 1: D&D BUILDING COMPANY LLC
Party 2: CITIGROUP GLOBAL MARKETS REALTY CORP.
ACRIS document ID: 2015072300507003 · Search ACRIS
Party 1: D&D BUILDING COMPANY LLC
Party 2: CITIGROUP GLOBAL MARKETS REALTY CORP.
ACRIS document ID: 2015072300507004 · Search ACRIS
Party 1: 981 THIRD DEVELOPMENT LLC
Party 2: D&D BUILDING COMPANY, LLC
ACRIS document ID: 2014042200456001 · Search ACRIS
Party 1: D&D BUILDING COMPANY, LLC
Party 2: 985 THIRD DEVELOPMENT LLC
ACRIS document ID: 2014042200456002 · Search ACRIS
Party 1: 985 THIRD DEVELOPMENT LLC
Party 2: D&D BUILDING COMPANY, LLC
ACRIS document ID: 2014042200456003 · Search ACRIS
Party 1: WELLS FARGO BANK, N.A.
Party 2: EUROMARKET DESIGNS, INC.
Party 2: D&D BUILDING COMPANY, LLC
ACRIS document ID: 2011052600335001 · Search ACRIS
Party 1: DUANE READE SHAREHOLDERS LLC
1 individual party not shown
ACRIS document ID: 2010042300859001 · Search ACRIS
Party 2: HOLLY HUNT ENTERPRISES, INC.
1 individual party not shown
ACRIS document ID: 2009100100999001 · Search ACRIS
Party 2: JPMORGAN CHASE BANK, NATIONAL ASSOCIATION
Party 1: THE BANK OF NEW YORK
ACRIS document ID: 2006100600504001 · Search ACRIS
Party 2: WELLS FARGO BANK, N.A., AS TRUSTEE
1 individual party not shown
ACRIS document ID: 2006101802006001 · Search ACRIS
Party 2: WELLS FARGO BANK, N.A., AS TRUSTEE
1 individual party not shown
ACRIS document ID: 2006101802006002 · Search ACRIS
Party 1: JPMORGAN CHASE BANK
1 individual party not shown
ACRIS document ID: 2006042601604001 · Search ACRIS
Party 1: JPMORGAN CHASE BANK
1 individual party not shown
ACRIS document ID: 2006042601604002 · Search ACRIS
Party 1: D&D BUILDING COMPANY LLC
1 individual party not shown
ACRIS document ID: 2006042601604003 · Search ACRIS
Party 1: D&D BUILDING COMPANY LLC
1 individual party not shown
ACRIS document ID: 2006042601604004 · Search ACRIS
Party 1: D&D BUILDING COMPANY LLC
1 individual party not shown
ACRIS document ID: 2006042601604005 · Search ACRIS
Party 1: JPMORGAN CHASE BANK
ACRIS document ID: 2006042601604007 · Search ACRIS
Party 1: JPMORGAN CHASE BANK
ACRIS document ID: 2006042601604008 · Search ACRIS
Party 2: JP MORGAN CHASE BANK
Party 1: CREDIT SUISSE FIRST BOSTON MORTGAGE CAPITAL, LLC
ACRIS document ID: 2004081001372001 · Search ACRIS
Party 2: JP MORGAN CHASE BANK
Party 1: CREDIT SUISSE FIRST BOSTON MORTGAGE CAPITAL, LLC
ACRIS document ID: 2004081001427001 · Search ACRIS
Party 1: CREDIT SUISSE FIRST BOSTON MORTGAGE CAPITAL, LLC
Party 2: J.P. MORGAN CHASE BANK
ACRIS document ID: 2003100101964001 · Search ACRIS
Party 2: J.P. MORGAN CHASE BANK
1 individual party not shown
ACRIS document ID: 2003100102036001 · Search ACRIS
Party 2: J.P. MORGAN CHASE BANK
1 individual party not shown
ACRIS document ID: 2003100101523001 · Search ACRIS
Party 2: J.P. MORGAN CHASE BANK
1 individual party not shown
ACRIS document ID: 2003100101766001 · Search ACRIS
Party 2: 979 THIRD AVENUE ASSOCIATES, LLC
Party 1: CHEMICAL BANK
10 individual parties not shown
ACRIS document ID: FT_1300006117230 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1050005751305 · Search ACRIS
Party 2: CREDIT SUISSE FIRSTBOSTON MORTGAGE CAPITAL LLC
1 individual party not shown
ACRIS document ID: FT_1360005751336 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1400005751340 · Search ACRIS
Party 2: CREDIT SUISSE FIRSTBOSTON MORTGAGE CAPITAL LLC
1 individual party not shown
ACRIS document ID: FT_1440005751344 · Search ACRIS
Party 2: CREDIT SUISSE FIRSTBOSTON MORTGAGE CAPITAL LLC
1 individual party not shown
ACRIS document ID: FT_1950005751495 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1140005338714 · Search ACRIS
Party 1: 979 THIRD AVENUE ASSOCIATES LLC
1 individual party not shown
ACRIS document ID: FT_1340005341034 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1700005339970 · Search ACRIS
Party 2: 979 THIRD AVENUE ASSOCIATES LLC
4 individual parties not shown
ACRIS document ID: FT_1300004959230 · Search ACRIS
Party 2: 979 THIRD AVENUE ASSOCIATES LLC
1 individual party not shown
ACRIS document ID: FT_1310004959231 · Search ACRIS
Party 2: 979 THIRD AVENUE ASSOCIATES LLC
2 individual parties not shown
ACRIS document ID: FT_1320004959232 · Search ACRIS
Party 2: 979 THIRD AVENUE ASSOCIATES LLC
1 individual party not shown
ACRIS document ID: FT_1340004959234 · Search ACRIS
Party 1: CHEMICAL BANK, TRUSTEE
Party 2: 979 THIRD AVENUE ASSOCIATES LLC
1 individual party not shown
ACRIS document ID: FT_1440004959244 · Search ACRIS
Party 2: 979 THIRD AVENUE ASSOCIATES LLC
1 individual party not shown
ACRIS document ID: FT_1450004959245 · Search ACRIS
3 individual parties not shown
ACRIS document ID: FT_1810000436581 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1430000433243 · Search ACRIS
2 individual parties not shown
ACRIS document ID: FT_1440000433244 · Search ACRIS
ACRIS real property records, NYC Department of Finance via NYC Open Data. As of October 31, 2026.
Pre-2016 DOB filings
DOB legacy · NYC Open Data
DOB Job Application Filings (ic3t-wcy2), NYC Open Data. As of October 31, 2026.
DOB legacy violations
DOB BIS · NYC Open Data
EMERGENCY WORK ORDER DUE TO DISPLACED CAVITY WALL BRICK. ROOF PROTECTION IS REQUIRED TO PROTECT PUBLIC & PROPERTY FROM DOCUMENTED UNSAFE CONDITIONS. REMEDY: IMMEDIATELY TAKE/PROVIDE ADEQUATE SAFETY MEASURES PROTECTION AT ADJACENT PROPERTY. ALSO MAKE IMMED ADJACENT REPAIRS TO UNSAFE FACADE CONDITIONS U/FULL SUPV OF NYS LICENSED PROFES
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. EXP1 CRACKS IN BRICKWORK & CRACK WINDOW PANE AT MULT LOC. EXP2-MULTIPLE CRACKED WINDOW PANES. EXP3-MISSING COPING METAL ON ROOF PARAPET & SPALLING BRICK.EXP4-CRACKS ON SETBACK PARAPET @ 8TH&9TH FLS,DAMAGED WINDOW SILLS,BROKEN WINDOW PANE @ MULT LOC. REMEDY: REPAIR AND/OR REPLACE
FTM BLDG. OBSERVED ON EXP 1 W.ELEV: CRACKS IN BLOCK WORK @ MULTI FLRS, BROKN WINDOWPANES @ MULTI FLRS. EXP 2 N.ELEV; SPALLED SILLS & BROKN WINDOWPANES @ MULTI FLRS.EXP 3 E.ELV:DAMAGD SPALLD MORTAR JOINTS ON 18 FL & @ PARAPET: CRACKD WINDOWPANE ON 7FL. EXP 4 S.ELEV: CRACKD &SPAL -LIN BRICKWORK ON MULTI FLRS.REMDY:REPAIR/REPLACE DAMAGD FACADE/APPURT
EMERGENCY WORK ORDER DUE TO UNSAFE CONDITIONS ON FACADE & NOTIFICATION BY SIDEWALK SHED CONTRACTOR TO DOB THAT SIDEWALK SHED WILL BE REMOVED WITHOUT OWNER PERFORMING FACADE REPAIRS. REMEDY:OWNER TO ARRANG FOR RE INSTALLATION OF SIDEWALK SHED U/DIRECTION OF A RDP @ ALL PUBIC RIGHT OF WAYS. NO LAPSE IN TIME BETWEEN OLD SHED BEING REMOVED
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKED WINDOW PANE AT MULTIPLE LOCATIONS, DEFECT AT WINDOW LINTELS, DAMAGED WINDOW SILL AT EXPOSURE 2 ALSO CRACKS. EXPOSURE 4 CRACK AT 9FL SETBACK ROOF AREA: DEFECT AT COOLING TOWER WALL, CRACK AT BULKHEAD AND SPALLING AT PARAPET WALL. REMEDY: REPAIR AND OR REPLACE
VIO24-50343
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
DUE TO VEHICLE IMPACTING SHED. AT TIME OF INSPECTION A VEHICLE DROVE INTO A SIDEWALK SHED DAMAGING AND DISPLACING APPROXIMATELY 50 PERCENT OF SHED AND CAUSING NON STRUCTURAL DAMAGE TO BUILDING
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO PERFORM CATEGORY 5 INSPECTION
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
28 resolved, most recent Sep 24, 2026
REMEDY: IMMEDIATELY RE-INSTALL SIDEWALK. INSTALL APPROXIMATELY.100' LINEAR FEET OF SIDEWALK SHED AT.EXPOSURE # 1 WEST ELEVATION (3RD AVENUE) AND INSTALL APPROXIMATELY 235' LINEAR FEET OF SIDEWALK.SHED AT EXPOSURE # 4 SOUTH ELEVATION (EAST 58TH STREET)
IED IS RESOLVED. WORK IS COMPLETED AND VERIFIED BY DOB. · disposed Sep 24, 2026
OBSERVED BROKEN WINDOW ON 1ST AND MINOR MASOMRY DAMAGE AT FIRST FLOOR LEVEL DUE TO VEHICLE INPACTING IT
OK TO DISMISSED VACATE FULLY RESCINDED REPAIR COMPLEDED PER REMEDY. · disposed Sep 22, 2021
OBSERVED APPROXIMATELY 60 LINEAR FEET OF SWS DISPALCING AND COLLAPSING ON TO THE PUBLIC SIDEWALK AND STREET DUE TO VEHICLE IMPACT
OK TO DISMISS VACTE FULLY RESCIDED AND REPAIRS COMPLETED PER REMEDY. · disposed Sep 22, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
CIANOW CRM Violation Dismissed · disposed Aug 18, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 12, 2021
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CIANOW CRM Violation Dismissed · disposed Jun 30, 2026
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
CIANOW CRM Violation Dismissed · disposed Oct 25, 2026
DISMISSED BASED ON SUBSEQUENT REPORT SHOWING DEFECTS CORRECTED · disposed Dec 15, 2022
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 12, 2017
PVT: SATISFIED BY SUBMISSION OF AOC FOR CAT 1 INSP · disposed Jul 12, 2017
DISMISSED BASED ON SUBSEQUENT REPORT SHOWING DEFECTS CORRECTED · disposed Dec 15, 2022
DOB BIS Violations (3h2n-5cm9), NYC Open Data. As of October 31, 2026.
ECB violations
Environmental Control Board · NYC Open Data
FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING ETC.WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1 RCNY 103-04.-UNSAFE NOTIFICATION UNSAFE-#1004633-10C-00
Penalty: $10,000 · balance due: $10,000
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #804633. REMEDY: FILE ACCEPTABLE REPORT.
Penalty: $6,250 · paid: $6,250
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.NOTE:AT THE TIME OF INSPECTION OBSERVED DEFECTED/LOOSE PARAPET PANELS AT EXPOSURE 2 AND EXPOSURE 4.REM:COMPLY TO CODE SPECIFICATION.
Penalty: $2,400 · paid: $2,400
AT THE TIME OF INSPECTION I OBSERVED 3 ROTTED MUDSILLS BENEATH SIDEWALK SHED VERTICAL MEMBERS AT EXPOSURE #4 EAST OF 58TH STREET CREATING A SHIFTING OF VERTICAL MEMBERS WHICH CAN POSSIBLY CAUSE SHED TO COLLAPSE
Penalty: $2,400 · paid: $2,400
A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR
Penalty: $6,250 · balance due: $6,270
PEDESTRIAN PORTION DOSE NOT MEET CODE SPECIFICATIONS BC3307.6.4.8. UNDER SIDE OF SWH PASSAGEWAY NOT ILLUMINATED BY ELECTRIC LIGHT (INOPERABLE SHED ELECTRIC LIGHT FIXTURES) DURING NO DAYLIGHT AS PER CODE BC3307.
Penalty: $2,400 · balance due: $2,420
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE
Penalty: $6,250 · balance due: $6,270
27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXIST
Penalty: $3,125 · paid: $3,125
SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN HEIG
Penalty: $3,125 · paid: $3,125
AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE
Penalty: $1,250 · paid: $1,406
FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SIDEWALK SHED, NETTING ETC. WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM UNSAFE FACADE AS PER 1RCNY 10304. DOCUMENTED B QEWI FILED 04-29-19
Penalty: $10,000 · balance due: $10,020
100M07- PROVIDE MISSING STEP BOLT (MOUNTING BOLT) DANGEROUS CONDITION CEASE USE CALL DOB FOR REINSPECTION OF MANLIFT. NOTE: REPLACE ALL STEPPARTS AND STEP FRAME AND ROLLERS.
Penalty: $5,000 · paid: $6,312
FAILURE TO MAINTAIN BLDG WALLS & APPURTENANCES:NOTED-EAST ELVN(EXPO3)@NORTH SECTION 1-DEFECTIVE MISSING METAL SHEATHING AT ROOF COPING;2-SPALLED BRICKWORK BETWEEN FLOORS 13 & 17. RMDY: MAINTAIN BLDG EXTERIORS,R
Penalty: $200 · paid: $400
37 resolved, most recent Mar 25, 2026
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE AND DAMAGED PARAPET PANELSAT MULTIPLE LOCATIONS. REMEDY: COMPLY TO CODE SPECIFICATIONS.
Penalty: $5,000 · paid: $5,000
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED DEFECTIVE INADEQUATE SHED CONDITIONS.SUCH AS: DAMAGED, ROTTEN, MISSING PIECES OF MUDSILLS. ROTTEN PARAPET P
Penalty: $5,000 · balance due: $5,020
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #904633. REMEDY: SUBMIT ACCEPTABLE REQU
Penalty: $2,500 · balance due: $2,520
AT TIME OF INSPECTION OF 18 STORY MIXED USE BUILDING OBSERVED SIDEWALK SHED NOT MAINTAINED PER CODE SPECIFICATION ROTTING MUD SILLS CAUSING HAZARDOUS CONDITIONS.
Penalty: $2,400 · paid: $2,400
100H11,56Y13,56O02. 100H11-REPLACE WORN ROLLERS ON STEOP #3 AND #1; 56Y13-PROPERLY SEAL MACHINE OIL LEAK; 56O02-CLEAN MACHINE AND FLOOR OFOIL.
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER @ PARKING GARAGE LOWEST LVL SUB CELLAR F.P.S.C DOOR @ MAN LIFT HAS A HOLE THRU DOOR W/EXP OSED WOOD HINGE RAIL.
DOORS NOT SELF CLOSING NOTED: AT GARAGE EXIT STAIR DOORS NOT SELF CLOSING AT STAIRWAY ADJACENT TO MANLIFT INCLUDING FIRE DOOR TO MANLIFT ROOMS ALL SUB LEVELS. NOTED 2 SUB LEVEL MISSING FIRE DOOR. REM: PROVIDE/M
FAILURE TO MAINTAIN BUILDING CODE COMPLIANT LACK OF EMERGENCY LIGHTING FOR EXITS PER BC 1006.1; 27-542. NOTED AT GARAGE EXIT LIGHTING IS OUT AT SUB LEVEL 3 ADJACENT TO AREA D & 4TH SUBLEVEL ADJACENT TO AREA D &
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY NOTED: AT GARAGE, EXITDOORS OBSTRUCTED BY LOCKING DEVICE ON OPPOSITE SIDE AND TIGHT FITTING PARKED CARS TO THE RIGHT OF RAMP FACING UP AT SUBLEVELS 2,3 AND 4.RMDY
Penalty: $1,200 · paid: $1,200
FAILURE TO MAINTAIN BLDGING CODE COMPLIANT; NO FIRE STOPPING PER BC 712.3; 27-345. NOTED AT GARAGE MISSING FIRE STOPPING IN STAIRWAY. HOLES & PENETRATION IN CMU BLOCK FIRE WALL TO MAN LIFT ROOM, ALL LEVELS. REM
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OOPERATIONS-AN INCIDENT WAS CALLED INTO BEST SQUAD BY N.Y.P.D. IN REGUARD TO A WINDOW THAT WAS BEING INSTALLED ON THE 11TH FLR BY SUPREME GLA
Penalty: $2,400 · paid: $2,400
81U5,80B15. 81-U-5-FILE AND PERFORM 5 YR TEST. 80-B-15 SHORTEN COMPESATING CABLES.
Penalty: $180 · paid: $180
81U5,49B15. 81-U-5-FILE AND PERFORM 5 YR TEST. 49-B-15-SHORTEN GOVERNOR ROPE
42U16-42B06-16P01-03Q03. 42-PROVIDE CHRRENT 5 YEAR TEST TAG. 42-SECHRE LADDER TO SECON DARY COVED ALL ELECTRICLA BOX ESIN SECONDARY 16-PROTHST LINK AGE ON BASEMENT DOOR FOR DROP KEY 03-RESTORE SWING DOOR ON CAR
81U06-79X07-62B09. 81-FILE AND PERFORM 5 YEAR TEST. 79-RETURN DEVICE TO SERVICE 62-REMOVE STORED MATERIALS FROM PIT.
81B16-80B09-52B09. 81-PROVIDE 5 YEAR TAG WITH CURRENT TEST DATE 80-REMOVE OBSOLETE EQUIPMENT FROM SECON DARY 62-REMOVE STORED MATERAIL FROM PIT.
81U16-52E11-55A07-62B09. 81-PROVIDE 5 YEAR TAG WITH CWRRENT TEST DATE 52-DETERMINE CAUSE OF VIBRATION IN OHIT BOARD BEARING AND REPAIR 55-RESTORE LIGHTING OVER MAIN MACHINE 62-REMOVE STORED MATERRILS FROM PIT.
48H15-57B09. 57-B-09 REMOVE ALL MATERIAL AND BOXES FROM PIT.
Penalty: $180 · paid: $180
OPERATIONS OF A PUBLIC ASSEMGLY WITHOUT A CURRENT PERMIT. NOTE: 14 FLOOR RESTAURAMT SPACE REMEDY: OBTAIN A PLA PERMIT FOR SPACE NOTED.
ALTERED BUILDING OCCUPIED WITHOUT A VALID C OCCUPANCY NOTE: ALT AT 14 FLOOR. REMEDY: OBTAIN A VALID CERTICATE OF OCCUPANCY.
Penalty: $350 · paid: $350
73X11. 73- RESTORE ELEVATOR BACK INTO NORMAL SERVICE.
OPERATION OF PLACE OF ASSEMBLY WITHOUT CURRENT PERMIT. NOTED: EATING &DRINKING ESTABLISHMENT ON 14TH FLOOR. DBA "ASTRA". REMEDY: OBTAIN PA PERMIT.
Penalty: $500 · paid: $500
ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. NOTED: EXPIRED TEMPORARY, C OF O ALT. 1 #101504597. C OF O #118534, EATING & DRINKING SPACE ON 14TH FLOOR EXPIRED 3/29/00. REMEDY: OBTAIN
Penalty: $180 · paid: $180
ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY ALTERATION #101504597 FOR 14TH FL NOTED EXPIRED TEMP C OF O 114176 EXPIRED 5/3/98 REMEDY OBTAIN VALID C OF O
Penalty: $350 · paid: $350
OPERATION OF PLACE OF ASSEMBLY WITHOUT CURRENT PERMIT NOTED 14TH FL RESTAURANT WITHOUT PA PERMIT REMEDY OBTAIN PA PERMIT
Penalty: $500 · paid: $500
46L12-CHANGE HOIST ROPES.
43Y14,57Y14. 43-SEAL PUMP UNIT IN ROOM. 57-REMOVE OIL FROM PIT AND REPAIR HYDRO PISTON.
46L12,37D6. 46-CHANGE HOIST ROPES. 37-PROPERLY MOUNT CAPACITORS TO CONTROLLER.
INSTALLATION OF AIR CONDITIONER UNIT WITHOUT FIRST OBTAINING AN EQUIPMENT WORK PERMIT OR EQUIPMENT USE PERMITS IN THAT AN HVAC ABSORBATION UNIT IN EXCESS OF 2 1/2 TON CAPACITY HAS BEEN INSTALLED AND NOW PROVIDE
INSTALLATION OF AN A/C UNIT EXCEEDING 2 TON CAPACITY WITHOUT OBTAININ AN EQUIPMENT USE PERMIT OR EQUIPMENT WORK PERMIT.IN THAT AN A/C UNIT EXCEEDING 2 TON CAPACITY HAS BEEN INSTALLED AT 15TH FLR ROOF SETBACK WI
Penalty: $300 · paid: $300
FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYING TO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS REMEDY FILE REPORT.
FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION. ALT#101026382. REMEDY: PROVIDE APPROVED PLANS.
75# PERFORM 5 YEARS TEST, PROPERLY TAG DEVICE AND FILE ELV3 FORM
75#, 75/ PERFORM 5 YEARS, TEST, PROPERLY TAG DEVICE AND FILE ELV 3 FORM
75#, 75/ PERFORM 5 YEAR TEST, PROPERLY TAG DEVICE AND FILE ELV 3 FORM
75#, 75/ PERFORM 5 YEARS TEST, PROPERLY TAG DEVICE AND FILE ELV 3 FORM
75#, 75/ PERFORM 5 YEARS TEST, PROPERLY TAG DEVICE AND FILE ELV 3 FORM
ECB Violations (6bgk-3dad), NYC Open Data. As of October 31, 2026.
What are you trying to do here?
Public records for 979 3 AVENUE, Manhattan. Data from NYC Open Data: NYC MapPLUTO, Department of Buildings (DOB NOW, BIS, ECB), Housing Preservation and Development, Landmarks Preservation Commission, ACRIS (NYC Department of Finance), DOF Digital Tax Map. Address lookup by NYC Planning Labs Geosearch. Page updated October 31, 2026.